Apex bank suryacity handover work

1 Bank hall pantry work


30mm black granite with sink cutting and half round 1900
transportation 350
cutting blade 1 no 110
Ss sink 18" 1 no 1200
metal paste 120
waste coupling 1no 180
waste pipe 1 no 80
white cement 1 kg 40
3980
2 Compound Crack repair work
Fosroc GP2 chemical 1 bag 700
Conplast SBR 1 litre 350
Grinding wheel 1 no (for making groove) 100
Waterproof labour 1 day 1500
2650
3 Plumbing work
Kaveri connection from road to water meter
3/4" cpvc pipe I1 lenth 480
collor and elbow 60
cpvc solvent 59
Chamber cleaning work( dabbe) Balaji labour 2000
chamber covers & frames 18"*18" 3 nos 1500
gully trap Covers cemect 1'*1' 3nos 975
Earthing chamber cement covers 2 no 650
chamber covers transportation 300
Vent cowl 5 nos 200
4" dummy cap 1 no 50
grating with hole 2 nos 150

Chamber cover fixing and finishing, irregular size


chamber cover making, balccony tile grouting and touch
up work
mason 5 days 4750
helper 5 days 3250
14424
4 Painting work
L 102 premium emulsion 8 litrs 2650
satin black 4 litre 1280
face pack 1 litre ( apex) 430
Steel grey 4 litre 1350
4" brush 1nos 240
dhoti 3 nos 500
terpentiol 5 litrs 200
thinner 2 litre 200
Roller 4" 2 nos 200
8" interior roller 1 nos 190
flat brush 2 80
sand paper 5 nos 50
putty blade 3 40
7410
5 Floor cleaning work
Soap oil 5 litres 260
Steel brush 4 100
sponge 4 80
Acid 5 litres 210
Mop 1 no 150
wiper 1 no 120
cloth 2 90
Granite floor clener chemical 5 liters 1160
coconut broom 2 60
bombay broom 1 no 125
total building cleaning work
Helpers 3 nos * 4 days 12 650 7800
Ladies 1 nos* 4 days 4 450 1800
11955
6 Carpenter work
Gfloor toilet lock with handle 1 no 350
Main door stopper 1 nos Replaced 150
carpenter labour 500
Pod locks for sump and 2 gates 240
WD-40 liquid for gate rust remever 2 cans 240
1480
7 Inaugeration stone fixing work
Roff cement 1 bag 480
PoP 1 kg 40
sponge 1 no 20
wall cutting blade 1 no 120
Granite fixing labour charge 2000
2660

1 Bank hall pantry work 3980


2 Compound Crack repair work 2650
3 Plumbing work 14424
4 Painting work 7410
5 Floor cleaning work 11955
6 Carpenter work 1480
7 Inaugeration stone fixing work 2660
Total amount 44559