Professional Documents
Culture Documents
Standard: ▲ LINTEC Asphalt Burners (LAB Series) meet the required International Standards
Combustion Air Technology Inspired by knowledge and using the achieved experience in the field
of combustion technology, LINTEC started designing their own fully
automatic compact monoblock Asphalt Burners.
Intake combustion air
Construction
Split model, between fan and burner housing incorporating all
burner componenents as illustrated, except gas train assembly.
All electrical components mounted on the burner are pre-wired
inside the junction box and checked to avoid any wrong connec-
tion. In addition, the burner will be dry tested with oil flow, before
leaving the factory.
Capacity range
The burners have three different housings and cover the capacity
range of 6.0 to 24.0 MW. They are applicable for all asphalt drying
drums, suitable for light/heavy oil or natural gas.
Burner Management
The burner control is generally based on Etamatic electronic Burner
Management System.
Gas Train
The design of the gas train assembly is for the use of high calorific
natural gas, Hi=36,0 MJ/Nm³, having a supply pressure of Pe= 1 to
Oil combustion head assembly 3 bar at an outlet pressure of 200-500 mbar maximum.
Convincing advantages
Head Assembly
Control assembly
part
Safety assembly
part
LP-Burner Type
LAB-1-LP-6MW-S LAB-2-LP-13MW-S LAB-3-LP-18MW-S
LAB-1-LP-6MW-SN LAB-2-LP-13MW-SN LAB-3-LP-18MW-SN
LAB-1-LP-8MW-S LAB-3-LP-24MW-S
LAB-1-LP-8MW-SN LAB-3-LP-24MW-SN
HP-Burner Type
LAB-1-6MW-N LAB-2-13MW-N LAB-3-18MW-N
LAB-1-HP-6MW-EL LAB-2-HP-13MW-EL LAB-3-HP-18MW-EL
LAB-1-HP-6MW-NEL LAB-2-HP-13MW-NEL LAB-3-HP-18MW-NEL
LAB-1-8MW-N LAB-3-24MW-N
LAB-1-HP-8MW-EL LAB-3-HP-24MW-EL
Burner Assembly LAB-1-HP-8MW-NEL LAB-3-HP-24MW-NEL
LAB 1-........
6 MW
LAB 2-........
8 MW
LAB 3-........
13 MW
LAB 3-........
18 MW
24 MW
2,5 3,2 4,0 4,8 5,9 7,0 7,8 8,5 9,3 11,0 12,4 13,9 15,5 17,1 18,6 20,0 22,5 24,0
www.lintec-gmbh.de