8 - Road Works (Construction)
8 - Road Works (Construction)
New Construction
Maintenance
Road Works 1
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Subgrade preparation
Subbase / Base layers
Asphalt layers
Equipment
◦ Grader
◦ Water tanks
◦ Compactors
Formation of Slopes
Road Works 2
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Road Works 3
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Material selection
◦ Laboratory testing – CBR, Los Angeles, LL, PL, etc.
Equipment
◦ Grader
◦ Water tanks
◦ Compactor
Constant thickness
Road Works 4
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Layer thickness
◦ Should be within specifications
10
Road Works 5
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
11
12
Road Works 6
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Open trucks
Temperature control
13
Equipment
◦ Trucks
◦ Finishers
◦ Compactors
Constant thickness
14
Road Works 7
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
15
16
Road Works 8
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
17
Layer thickness
◦ Coring
◦ Thickness should be within specifications
Compaction
◦ Coring
◦ Compare density (field) to design density
18
Road Works 9
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
Partial Reconstruction
◦ Remove all AC layers
◦ Adjust base layer
◦ Add one or more AC layers
19
20
Road Works 10
Alexandria University Fourth Year Civil Engineering
Faculty of Engineering CE 454 - Highway Engineering
21
22
Road Works 11