SPECIALIZATION 1: PRINCIPLES OF CONSTRUCTION PROJECT MANAGEMENT.

COM – The management and


MANAGEMENT, PLANNING AND SCHEDULING control of the construction phase of a project

CONSTRUCTION TOP-NOTCH CONSTRUCTION – is the art and science of


handling construction projects
is a process that consists of the BUILDING or
ASSEMBLING infrastructure. SPP DOCUMENT 204-B (The 2010 Standards of
Professional Practice Effective March 9, 2011) – Due to
LATIN CONSTRUCTIONEM – (com- "together" and the increasing complexity of construction projects, there
struere "to pile up") is an upward demand for more effective cost control and
Managed by: Project Manager faster project implementation consistent with high
quality of work.
Supervised by: Construction Manager
Design Engineer Construction Management Services were thus instituted
Construction Engineer to fill this need in the construction industry.
Project Architect PURPOSE OF CONSTRUCTION MANAGEMENT

CONSIDERATIONS FOR CONSTRUCTION PLANNING – is to control the quality of a project's scope,


time/delivery and cost—sometimes referred to
▪ Environmental impact of the project as a project management triangle or "triple
▪ Scheduling constraints"
▪ Budgeting
▪ Construction site safety
▪ Availability of building materials
▪ Logistics
▪ Inconvenience to the public
▪ Zoning requirements
BEST THREE CONSTRUCTION COMPANY IN THE
PHILIPPINES
1. DMCI – D.M. Consunji Inc.
• Makati Shangrila
• SM City Manila
2. MDC – Makati Development Corporation
• Greenbelt
• Solenad One
3. DDTKI – DDT KONSTRACT, INC.
• Shell Residences
• SMDC Light Residences

CONSTRUCTION MANAGEMENT DEFINED


CONSTRUCTION MANAGEMENT (CM)
WIKIPEDIA – is a professional service that uses
specialized, project management techniques and to deliver the project at the:
software to oversee the planning, design, construction
• shortest time,
and closeout of a project.
• the lowest cost possible and
CMAA (Construction Management Association of • within or beyond the required quality requirements
America) – is a professional service that provides a and specifications
project’s owner(s) with effective management of the
project's schedule, cost, quality, safety, scope, and
function.
CONSTRUCTION MANAGEMENT SERVICES LEGAL RESPONSIBILITY
CONSTRUCTION MANAGER (CM) could either be: The CM assumes no liability in case equipment fail to
1. a member of the staff of the Owner function or if a portion of the building collapses:
2. an independent individual
3. a firm hired by the Owner • due to deficiencies in the plan/design, provided
the CM did not participate in the plan/design review and
The Architect can serve as the Construction Manager approval, or
(CM).
• due to the deficiencies in the manner of
His training in the coordination of various specialties construction, provided the CM faithfully discharged his
allows him to supervise and assure proper monitoring of function/s during the construction/project
all construction activities with regards to quality, implementation.
workmanship and cost.
The responsibilities of the Construction Manager (CM) QUALIFICATIONS
include the functions of the Construction Supervision The Construction Manager may be an individual or a
Group (CSG). (reference Doc. 204-A and Architect’s firm.
Guidelines)
– The individual or the principal of the firm must
be a State-regulated professional, preferably an
FUNCTIONS & DESCRIPTION OF TASKS Architect with managerial capabilities and
extensive experience in the field of construction.
1. Coordination and Supervision – The Architect must be a Registered and
2. Cost and Time Control Licensed Architects (RLA), with an updated
3. Keeping of Records professional identification card and must be a
4. Quality Control of Work member in good standing of the Integrated and
The Construction Manager (CM) may hire the CSG to be Accredited Professional Organization of
under his employ or may supervise the CSG hired directly Architects (IAPOA).
by the Owner. – Architects who are Contractors or who have
already been in responsible charge of
LIMITATION OF AUTHORITY construction works are usually capable of
becoming Construction Managers (CMs).
The Architect as the Construction Manager shall not:
– involve himself directly with the work of the METHOD OF COMPENSATION
Contractor such that it may be construed that he
is assuming the Contractor’s liability as provided Since construction management is not part of the
for in Article 1723, etc. of the Civil Code. regular services of the Architect,
– impose methods, systems or designs that will
substantially affect the construction schedule • the services rendered by the Architect as a
and impair the design concept of the Architect Construction Manager (CM) shall be separately
compensated

LEGAL RESPONSIBILITY
The Architect as the Construction Manager (CM) is Regular Design Services of an Architect:
directly responsible to the Owner on all aspects of the • Project Definition Phase
construction work: • Schematic Design Phase
• Design Development Phase
• programming
• coordination • Contract Document Phase
• quality and cost control • Bidding or Negotiation Phase
• time management • Construction Phase