You are on page 1of 22

CONSTRUCTION

MANAGEMENT
SERVICES

AR 183-1
PROFESSIONAL PRACTICE 3

INSTRUCTOR: AR GRACIE SALAYA

GROUP 3 | A 52

BATOON, JANINE
CASTILL, CATRINA
ERCIA, VINCENT STANDARD OF PROFESSIONAL PRACTICE (SPP) ON
PENA, VICTOR CONSTRUCTION MANAGEMENT SERVICES
SANTAMARIA, ANA
SPP DOCUMENT 204-B
1. INTRODUCTION

2. FUNCTIONS AND
DESCRIPTION OF TASKS

3. LIMITATION OF AUTHORITY

4. LEGAL RESPONSIBILITY

5. QUALIFICATIONS
REPLACING THE 1979 UAP
6. METHOD OF COMPENSATION
DOC 204-B
INTRODUCTION
1.1 Due to the increasing complexity of
construction projects, there is an upward Construction Management

demand for more effective cost control Cost Control

and faster project implementation Project Implementation

consistent with high quality of work.


Construction Management Services
were thus instituted to fill this need in the
construction industry.
INTRODUCTION
1.2 The Construction Manager (CM) could either be:
1.2.1 a member of the staff of the Owner
1.2.2 an independent individual, or
1.2.3 a firm hired by the the Owner to manage the
construction of a particular project.
INTRODUCTION
1.3 The Architect can serve as the Construction
Manager (CM). His training in the coordination of
various specialties allows him to supervise and
assure proper monitoring of all construction
activities with regards to quality, workmanship and
cost.
2.1. THE RESPONSIBILITIES OF
THE CONSTRUCTION MANAGER
(CM) INCLUDE THE FUNCTIONS OF
THE CONSTRUCTION
2. FUNCTIONS AND SUPERVISION GROUP (CSG).
DESCRIPTION OF 2.1.1. COORDINATION AND SUPERVISION

TASK 2.1.2. COST AND TIME CONTROL

Reference Doc. 204-A and Architect’s Guidelines) 2.1.3. QUALITY CONTROL OF WORK AND;

2.1.4. KEEPING OF RECORDS


2.2. THE CONSTRUCTION
MANAGER (CM) MAY HIRE
2. FUNCTIONS AND THE CSG TO BE UNDER
DESCRIPTION OF HIS EMPLOY OR MAY
TASK SUPERVISE THE CSG
HIRED DIRECTLY BY THE
OWNER.
3. LIMITATION OF AUTHORITY

THE ARCHITECT AS THE CONSTRUCTION MANAGER


SHALL NOT:
3.1. involve himself directly with the work of the
The Civil Code, Article 1723,
Contractor such that it may be construed that declares the liability for damages in
any structure by reason of defects in
he is assuming the Contractor's liability as its construction or use of inferior
provided for in Article 1723, etc. of the Civil materials.

Code.
3. LIMITATION OF AUTHORITY

THE 3.2. IMPOSE METHODS, SYSTEMS OR


ARCHITECT AS DESIGNS THAT WILL SUBSTANTIALLY AFFECT
THE CONSTRUCTION SCHEDULE AND IMPAIR
THE
THE DESIGN CONCEPT OF THE ARCHITECT.
CONSTRUCTION
AVOID CONFLICT BETWEEN THE CM AND THE
MANAGER ARCHITECT OF THE PROJECT.

SHALL NOT:
4. LEGAL RESPONSIBILITY

4.1 The Architect as the Construction Manager


(CM) is directly responsible to the Owner on all
aspects of the construction work: programming,
coordination, quality and cost control and time
management.
4. LEGAL RESPONSIBILITY

4.2 The CM assumes no liability in case


equipment fail to function or if a portion of the
building collapses:
4. LEGAL RESPONSIBILITY

4.2.1 due to deficiencies in the plan / design,


provided the CM did not participate in the plan /
design review and approval, or
4. LEGAL RESPONSIBILITY

4.2.2 due to the deficiencies in the manner


of construction, provided the CM faithfully
discharged his function/s during the
construction / project implementation.
The Construction Manager may be an individual or a firm.
5.1 THE INDIVIDUAL OR THE PRINCIPAL OF
THE FIRM MUST BE A STATE-REGULATED
PROFESSIONAL, PREFERABLY AN

5. QUALIFICATIONS ARCHITECT
CAPABILITIES
WITH
AND
MANAGERIAL
EXTENSIVE
EXPERIENCE IN THE FIELD OF
CONSTRUCTION. THE ARCHITECT MUST BE
A REGISTERED AND LICENSED
ARCHITECTS (RLA), WITH AN UPDATED
PROFESSIONAL IDENTIFICATION CARD
AND MUST BE A MEMBER IN GOOD
STANDING OF THE INTEGRATED AND
ACCREDITED PROFESSIONAL
ORGANIZATION OF ARCHITECTS (IAPOA).
5. QUALIFICATIONS

5.2 ARCHITECTS WHO ARE CONTRACTORS OR


WHO HAVE ALREADY BEEN IN RESPONSIBLE
CHARGE OF CONSTRUCTION WORKS ARE
USUALLY CAPABLE OF BECOMING
CONSTRUCTION MANAGERS (CMS)
6.
6. COMPENSATION
COMPENSATION

6.1 SINCE CONSTRUCTION MANAGEMENT IS


NOT PART OF THE REGULAR SERVICES OF THE
ARCHITECT, THE SERVICES RENDERED BY
THE ARCHITECT AS A CONSTRUCTION
MANAGER (CM) SHALL BE SEPARATELY
COMPENSATED
1. TEAM MEETING LEADERSHIP
CONSTRUCTION LEAD REGULARLY SCHEDULED PROJECT

MANAGEMENT MEETINGS WITH MEMBERS OF THE PROJECT


DELIVERY TEAM FOR THE PURPOSE OF
CONTINUALLY ASSESSING THE PROJECT
SERVICES STATUS, COORDINATING DESIGN AND BUDGET
ISSUES

2. ACTION LOG 3. DECISION MAKING PROCESS


MAINTAIN THE PROJECT ACTION LOG TO COORDINATE INTERACTION AND DECISION
DRIVE AND TRACK OUTSTANDING ISSUES AND MAKING AMONG ARCHITECTS, ENGINEERS,
ENSURE TIMELY COMPLETION. USER GROUPS AND OTHERS NECESSARY TO
PROJECT DECISION MAKING.
4. CODE OFFICIAL REVIEW
CONSTRUCTION PARTICIPATE IN REVIEW MEETINGS BY AR

MANAGEMENT TEAM WITH BUILDING OFFICIAL TO DEVELOP


A PERMIT PROCEDURE FOR PROJECT

SERVICES

5. OWNER PURCHASING 6. COST CONTROL


ASSIST AND ADVISE THE OWNER RGARDING PROVIDE AN OVERALL COST CONTROL SYTEM
OWNER-PURCHASED ITEMS. FOR THE PROJECT. MAINTAIN A PARALLEL
RECORD OF PROJECT COSTS FOR REVIEW TO
SERVE AS A PERMANENT RECORD. DEVELOP
AND UPDATE A CASH FLOW FORECAST FOR
THE DURATION OF THE PROJECT
7. DOCUMENTS REVIEW
CONSTRUCTION REVIEW ALL DESIGN PHASE DOCUMENTS AND

MANAGEMENT COMMENT ON CONSTRUCTABILITY AND


COORDINATION. MONITOR COMPLETION OF
DESIGN DOCUMENTS TO ENSURE
SERVICES CONSTRUCTABILITY.

8. PRESENTATION 9. DESIGN PROCESS DOCUMENTS


PARTICIPATE IN OTHER PRESENTATION AS MONITOR DESIGN DOCUMENTS RELATIVE TO
NECESSARY TO PROVIDE UPDATES AS TO THE COMPLIANCE WITH THE APPROVED
PROJECT STATUS. FUNCTIONAL PROGRAM. PERFORM PERIODIC
DRAWING REVIEWS TO TRACK STATUS OF
THE DESIGN PROGRESS.
CONSTRUCTION
MANAGER PROJECT
DELIVERY

UP-TO-DATE COST ESTIMATES WITH REAL-WORLD


NUMBERS THAT REFLECT THE CMC’S INSIGHT ABOUT
MARKET CONDITIONS.
CONSTRUCTABILITY ADVICE THAT CAN REDUCE
REQUESTS FOR INFORMATION DURING CONSTRUCTION.
DOCUMENT REVIEW TO HELP REDUCE CHANGE ORDERS
DURING CONSTRUCTION.
CONSTRUCTION
MANAGER PROJECT
DELIVERY

ADVICE ON PACKAGING DOCUMENTS FOR MULTIPLE BIDS


TO MAKE THE AE TEAM’S WORK MORE EFFICIENT.
WITH MULTIPLE BID PACKAGES, THE ABILITY TO
DELIVER A PROJECT MUCH MORE QUICKLY THAN WOULD
OTHERWISE BE POSSIBLE. THIS IS ONE OF THE CMC’S
GREATEST CONTRIBUTIONS TO THE OWNER
REFERENCES

THE ARCHITECT'S HANDBOOK OF PROFESSIONAL PRACTICE


HTTPS://BOOKSHELF.VITALSOURCE.COM/READER/BOOKS/9781118668054/PAGEID/542

UAP STANDARD PROFESSINAL PRACTICE


REFERENCE DOC. 204-A AND ARCHITECT’S GUIDELINES)