NTPC Stations: Outage Details as on 31.10.2023 (till 12.

00 PM)

ECR
Capacit
Station Sep'23 OH unit OH Start OH End Duration RSD Unit FO unit FO Reason
y
(Rs)
Barh-I 1,320 3.00 1 Boiler Abnormal Sound
Barh-II 1,320 3.40 4 28-09-2023 11-11-2023 45
Barauni-I 220 5.28 6,7 Cond Vacuum Low
FGUTPS Unchahar-I 420 4.80 1 25-10-2023 31-10-2023 7
Kahalgaon-II 1,500 3.13 7 15-10-2023 28-11-2023 45
Lara 1,600 1.41 2 27-10-2023 10-12-2023 45
Mouda-II 1,320 2.96 3 26-09-2023 24-11-2023 60
NCTPS Dadri-II 980 3.87 5 20-10-2023 03-12-2023 45
NPGC Nabinagar 1,980 2.48 1 BTL
Ramagundam-I&II 2,100 3.97 4 01-10-2023 14-11-2023 45
Rihand STPS-II 1,000 1.58 3 23-09-2023 06-11-2023 45
Singrauli 2,000 1.59 7 17-09-2023 26-10-2023 40
Tanda-II 1,320 3.85 6 F/W conductivity high
Telangana 800 3.68 1 BTL
NTPC Units Outage (MW) 4,820 0 3,000
Vallur 1500 3.04 1 Fire on TG floor
Meja 1320 2.74 1 Turbine vibration High
JV Units Outage (MW) 0 0 1,160