Station Sep'23 OH unit OH Start OH End Duration RSD Unit FO unit FO Reason
y
(Rs)
Barh-II 1,320 3.40 4 28-09-2023 11-11-2023 45 5 BTL
Barauni-I 220 5.28 6,7 Cond Vacuum Low
Farakka-I&II 1,600 3.77 1 BTL
FGUTPS Unchahar-I 420 4.80 1 25-10-2023 31-10-2023 7
Kahalgaon-II 1,500 3.13 7 15-10-2023 28-11-2023 45
Mouda-II 1,320 2.96 3 26-09-2023 24-11-2023 60
NCTPS Dadri-II 980 3.87 5 20-10-2023 03-12-2023 45
NPGC Nabinagar 1,980 2.48 1 BTL
Ramagundam-I&II 2,100 3.97 4 01-10-2023 14-11-2023 45
Rihand STPS-II 1,000 1.58 3 23-09-2023 06-11-2023 45
Singrauli 2,000 1.59 7 17-09-2023 26-10-2023 40
NTPC Units Outage (MW) 4,020 0 1,740
Vallur 1500 3.04 1 Fire on TG floor
Meja 1320 2.74 1 Turbine vibration High
JV Units Outage (MW) 0 0 1,160