STA 0+600 STA 0+680 STA 0+760

C
L C
L

C
L

Material(s) at
Material(s) at
STA 0+000
Area Material(s) at STA 0+000
Material STA 0+000 Area
(sq. m.) Material
Area (sq. m.)
AREA CUT 8.70 Material
(sq. m.) AREA CUT 5.06
AREA FILL 5.65 AREA CUT 12.82
AREA FILL 2.92
AREA FILL 9.81
ITEM 311 1.00
ITEM 311 1.00
ITEM 200 ITEM 311 1.00
1.56 ITEM 200 1.56
ITEM 200 1.56

STA 0+780
STA 0+620 STA 0+700
C
L
C
L
C
L

Material(s) at Material(s) at
Material(s) at STA 0+000 STA 0+000
STA 0+000 Area Area
Material Material
Area (sq. m.) (sq. m.)
Material
(sq. m.) AREA CUT 5.18
AREA CUT 5.52
AREA CUT 15.34
AREA FILL 6.48 AREA FILL 6.48
AREA FILL 10.90
ITEM 311 1.00 ITEM 311 1.00
ITEM 311 1.00
ITEM 200 1.56 ITEM 200 1.56
ITEM 200 1.56

STA 0+640 STA 0+720 STA 0+800


C
L
C
L C
L

Material(s) at
Material(s) at STA 0+000
Material(s) at STA 0+000 Area
Material
STA 0+000 Area (sq. m.)
Area Material
Material (sq. m.) AREA CUT 3.02
(sq. m.)
AREA CUT 5.36
AREA CUT 14.58 AREA FILL 0.75
AREA FILL 3.06
AREA FILL 10.35 ITEM 311 1.00
ITEM 311 1.00
ITEM 311 1.00 ITEM 200 1.56
ITEM 200 1.56
ITEM 200 1.56

STA 0+740 STA 0+820


STA 0+660
C
L
C
L

C
L
Material(s) at
Material(s) at STA 0+000
Area
STA 0+000 Material
Material(s) at Area (sq. m.)
STA 0+000 Material
(sq. m.) AREA CUT 3.39
Area
Material AREA CUT 5.38
(sq. m.)
AREA FILL 1.93
AREA CUT 12.96 3.31
AREA FILL
ITEM 311 1.00
AREA FILL 21.51
ITEM 311 1.00
ITEM 200 1.56
ITEM 311 1.00
ITEM 200 1.56
ITEM 200 1.56

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: GROUP: MEMBERS: SET NO. SHEET NO.
DEPARTMENT OF CIVIL ENGINEERING IMPLEMENTING CONCRETE ROAD AT PARONDO, Jerle Mae
REGION XII BARANGAY CAGAWASAN, KIBAWE
CROSS SECTIONS ENGR. BERNADETH V. DAPUN ASIM, Bai Juwairiah CS 12
CEIT INSTRUCTOR GROUP 6 LARIDA, Peter John B.
13
KABACAN, NORTH COTABATO KIBAWE, BUKIDNON
ABDULLAH, Ben
BARAGUIR, Datu Sayyid Hadi
3 4