Project Title : South Kuwait Excavation, Transportation and Remediation (SKETR) Project (Zone‐1)
Company : Kuwait Oil Company (KOC)
Contractor
: JV/C of Khalid Ali Al‐Kharafi & Bros. Construction, Contracting Co. K.S.C.C with Lamor Corporation AB
Contractor’s Representative
KHALID TUBAILEH
QA/QC Engineer (1) Planning Engr (2) Administration Officer Multimedia Specialist (1)
Construction Manager (1) GIS Specialist / Data Base UXO HSE Manager (1) ENV / REMEDIATION Specialist Discipline Engineers III (1)
Quantity Surveyor ( 2) (1) 1. Hany Fawzy Alkhateeb. (Mandoub (1)
R. K. S. Raju Manaager (2) Subcontractor Joenel P. Robaro ( Adeshina Lateef) Khaled Mohamed (AIP)
1. Shamant GS Bedanga Bordoloi 2. Abhishek Parvataneni Mohammed Ahmed Ali Alam
1. Mohamed Mossad (Sub contractor Approval Shehata
2. Efren G. Rabang
2. Vishal S. Khandagale
in Progress)
HSE Specialist (1) Discipline Engineers III (1)
Fleet Coordinator (1) Inspector (2) Washing plant Mechanical Secretary ( 2 )
Rami Nabil Abu Shakra 1. JOBIN JACOB (Sudhes Kumar) REMEDIATION Specialist IT (1) (TBA) (AIP)
eng. ( 1 ) ( TBA)
UXO/EOD Specialist (1) 2. TBA (1) (TBA)
Land Surveyors (4)
David James Parker HSE Studies Miikka Tunturi
1. Mohamed Usman HSE Engineer (1)
2. Muhammed Azhar (DNV) (Ahmad Shawky)
Civil Engineer (1) 3. Akbar Ali QA/QC Officer (3) NORM Discipline Engineers III (1)
Amin Imro (TBA) Laboratory Services Store Keeper (2) (AIP)
4. Mohammed Al Sayed (Sub contractor Approval
Environmental Engineer(1) (Sub contractor Approval (TBA)
UXO/EOD Quality Control in Progress)
Safety Officer ( *) ( Daniel Salazar ) in Progress)
Specialist (1)
Document control (1) 1. Sirajauddin
Civil Supervisors (2) Troy Thorpe Air Quality Monitoring Technician II (1)
Topography, Utility (TBA) 2. Rohit Panchal
1. Tawfiq Roshady (Khademha) Security (8) (AIP)
Services Including Slit 3.Santosh Kumar Remediation Site ASBESTOS
2. Yousuf Shawarna (TBA)
Trenching 4. Roy Peter Supervisor (1) (Sub contractor Approval
(Sub contractor Approval 5. Anwar Ali Andrés Aguirre in Progress)
UXO/EOD Supervisor (1)
in Progress) Paul Munro Brown Technician II (1)
Drafts Man ( 2 ) (AIP)
Work Site Supervisors ESIA Lab Specialist (1) (TBA)
( **) (BV) Contractor Medic (1)
(TBA) TBA
( JAN KALAPURACKAL)
UXO/EOD SAFETY OFFICER (1) Foreman I (1)
Excavation &
(AIP)
Transportation Cain Wellings Industrial Hygiene Field Geologist (3)
(Sub contractor Approval NORM Officer (1) ‐ JV TBA
in Progress) (Thuraya) (Bani Amin)
Foreman I (1)
(AIP)
Lab assistant (1)
TBA
Asbestos
Well Drilling (SC)
(Sub contractor Approval
in Progress) SSC officer (2)
Waste TBA
(Hazardous Waste
Other Wastes)
Landfill Design
Cunsultant Notes :
(Sub contractor Approval
1 All the Kuwaity Personnals shall be In accordance with the Approved Kuwaitization Plan
in Progress)
14 5.2.1 to CS ( Full Time)
* Number of Safety Personnals shall be as per KOC Standard
** Number of Work Site Supervisors shall be in accordance with Site Conditions & Approved Schedule
13 5.2.2 to CS ( Full Time)
7 KUWAITISATION
Subcontractor
TBA To be Allocated