You are on page 1of 5

DAILY CONSTRUCTION REPORT (DCR)

Contractor : Saudi Amana Contracting Co. LLC


Package TitleVeolia Central Utilities & Valorisation Plant Package No: Veolia

WEATHER
Bright Sun Clear Overcast Rain Dust

To : Project Manager Sky


To 0 0 - 30 30 - 40 40 - 50 50 up

DCR # KJ-115-P-OP-DCR-72-00 Temp. o C


Still Mod.Still High
Date: Wednesday, June 10, 2020 Wind
Dry Mod.Dry Humid

Humidity

MANPOWER CONSTRUCTION EQUIPMENT & VEHICLES


Discipline Amana Subcon. Total No. Description Amana Subcon. Total No.
A - Management & Supervision Personnel Earthwork equipment
Project Manager Civil 1 1
Construction Manager 1 1 Wheel Loader
HSE Site Manager 1 1
HSE Engineer, HSE 0 Telescopic Handler 1 1
Planning Engineer 0 Excavator 1 1
Project Manager MEP 1 1 JCB Backhoe loader 1 1
Project Engineer - Civil 0 0 Compactors 1 1
Site Engineer - 0 Bobcat Skid Loader
QA/QC Engineers 1 1 Fork lift
Safety Officer 1 1 Dumper For SOG
Document Controler 0
Foremen Civil 2 2 Lifting equipment
Foreman - Mechanical (2), MEP 0 Boom lift For Civil
Sr. Land Surveyor (1), 0 0 Scissor Lift Civil
Foreman - Electrical (2), MEP 0 Mini Boom Lift MEP
Surveyer Engineer 1 1 Scissor Lift
MEP Technical Engineering Coordinator 1 1 Scissor Lift Diesel MEP
Civil Technical Engineering Coordinator 0 0 Scissor Lift Civil
Mobile Crane 50/Ton

Total - A 10
B - Workmen Amana Subcon. Total 4 0 4
B1 - Direct
Mason 1 1 Transporting equipment / Vehicles Amana Subcon. Total No.
Carpenter 6 6 Truck - Trailer
Steel Erector & Welder APK. Mob. Team 5 5
Steel Fixer 10 10 Truck with crane
Asst. QAQC 0
Civil Helper 15 15 Truck
Civil Chargehand 1 1 Pick-up Civil 0 0
Scaffolder 0 Bus 1 1
Office Cleaner ( Civil Helpers ) 2 2 Transit Mixer
Asst. Surveyors 1 1 Mobile Pump 1 1
Time keeper 1 1 Water Tanker 1 1
Office Boy 1 1
Safety Marshal 1 1
Carpenter ( Office Boy ) 0
painter 0 0

Total - B1 44 0 44 3 0 3
B2 - Indirect
Plumber 1 1 Others Amana Subcon. Total No.
MEP Chargehand 0 0
Ductman / ( MEP Welder ) 0 0 Survey equipment 2 2
Pipe Fitter MEP 0 0 Table Circular saw
Driver (General purpose) 2 2 Dewatering equipment
Electrician MEP 1 1 Generators 4 4
MEP Helper 0 0 Air Compressors Small & Big 1 1
Mechanic 0 0 Welding Machines 1 1
Operators 3 3
Bus Driver 1 1
Store keeper 1 1
Bar-cutting machines 1 1
Bar-bending machines 1 1
Power Float
Concrete Mixer
Concrete Vibrator 1 1
Jumping Compactor

Plate Compactor 1 1
Roller Compactor

Total - B2 9 0 9 Ride On Floor Cleaning Machine


Total - B 53
TOTAL - MANPOWER (A+B) 63 12 0 12
GRAND TOTAL-CONSTRUCTION EQUIP & VEHICLES 19

1/5
DAILY CONSTRUCTION REPORT (DCR)
Contractor : Saudi Amana Contracting Co. LLC
Package TitleVeolia Central Utilities & Valorisation Plant Package No: Veolia

Civil Work
Work Discription Location Date Started Date of Finish Quantity or % Complete

Column Neck Reinforcement Rebar of Admin Building ( Stag Admin Building 4-Jun-20 80.0%
Excavation Works for Shredder Building (Stage 2) Shredder 4-Jun-20 40.0%
Scaffolding for Lab Building Footings Lab Building 4-Jun-20 18-Jun-20 70.0%
Steel Reinforcement for Lab Footings Lab Building 4-Jun-20 18-Jun-20 70.0%
Concrete Pouring of Lab Footings Lab Building 10-Jun-20 20-Jun-20 40.0%

One Day Lookhead


Column Neck Formwork Admin Building
Back Filling works at Admin Building Admin Building 25-Jun-20
Shuttering works for Admin Columns Admin Building
Shuttering Works for Foundation of Lab Laboratory 18-Jun-20
Reinforcement Rebar for Foundation Laboratory 18-Jun-20
Concrete Pouring for Lab Foundations (Phase 1) Laboratory 11-Jun-20
Excavation works for Shredder Building (Phase 2) Shredder

MEP Work
Work Discription Location Date Started/Completed Quantity or % Complete

Contractor : Consultant :
Name: Abdulah Alkilani Name:
Signature: Signature:
Designation: Project Manager Designation:

2/5