CHINA CONSTRUCTION YANGTZE RIVER SDN BHD MALAYSIA

DI ATAS LOT 32665,JALAN MEWAH RIA ,TAMAN BUKIT MEWAH ,MUKIM TEBRAU,DAERAH JOHOR BAHRU
SITE DAILY REPORT
Date 18/3/2020 - 31/05/2020

NSC = SYARIKAT ELEKTRIK WOON SDN BHD (ELECTRICAL SERVICES)

Manpower Plant and Machinery


No Trade Qty No Trade Qty No Trade Qty No Type Qty No Type Qty
1 Dep. Project Director 16 Surveyor 31 Electrical - Woon 0 1 Hydraulic Excavator 16 Poker Vibrator

2 Project Manager - Woon 0 17 Clerk / HR Admin 32 Earthing - Woon 2 Backhoe 17 Diesel Tank

3 Const. Manager 18 Machine Operator 33 Plumbing 3 Dumper Truck 18 Water Jet


4 Architecture Manager 19 Chainman 34 RC 4 Water Truck 19 Bobcat
5 M & E Manager 20 Site Supervisor 35 5 Mobile Crane 20 Rubbish Skip
6 Technical Manager 21 Carpenter 36 6 Compactor 21 Borepile Machine
7 HSE Manager 22 Barbender 37 7 Water Pump 22 Hydraulic Conc. Breaker
8 Site Manager 23 Concretor 38 8 Diesel Genset/Welding Set 23 Bar bending Machine
9 Asst QAQC Manager 24 General Worker 39 9 Air Compressor 24 Crawler Crane
10 Site Engineer 25 Supervisor (Subcon) 40 10 Backpusher / Bulldozer 25 Grabing Machine / M.G
11 Safety Officer 26 Earthwork 41 11 Tower Crane 26 Bentonite Plant
12 Safety Site Supervisor 27 RC 42 12 Concrete Mixer 27 Showel
13 M & E Engineer 28 RC 43 13 Concrete Pump 28 Rig Rag
14 QAQC Engineer 29 Plumbing 44 14 Rotary Drilling Rig 29 Mini Escavator
15 M & E Coordinator 30 Project Engineer-Woon 0 45 15 30

Total 0 Total 0
Summary of work done and activities :-

No Location Description of work Time

1) Site was inactive due to the implementation of Movement Control Order by


1 N/A Malaysian Government starts from 18/03/2020. Starting from 31/05/2020 and N/A
afterwards site are allowed to continue works with condition to follow SOP.

Material/Machineries delivered to site


No Material Remarks
1
2
3
4
5

Prepared by: Acknowledgement By:


Joenathan Ambross
(Site Engineer/ Authorised Personnel) (Client / Consultant)