You are on page 1of 3

Republic of the Philippines

Department of Education
REGION III-CENTRAL LUZON
DIVISION OF CITY OF SAN FERNANDO
SAN NICOLAS INTEGRATED SCHOOL
CITY OF SAN FERNANDO, PAMPANGA
1ST PERIODICAL TEST IN TLE GRADE 9
Industrial Arts (Carpentry)
Name: Score:
Grade/Section: Date:
Parents signature:____________

1. Is a milled process piece of wood ready for use.


a. Lumber b. Sledgehammer c. Bolo d. Bar level

2. Is used to mark straight line on a long piece of stock or lumber.


a. Lumber b. Sledgehammer c. Bolo d. Chalkine

3.. The person who has the authority to relocate the boundaries of the construction when there
is no existing reference point is the
a. Geodetic engineer b. Mechanical c. Electrical Engineer d. All of the above
Engineer

4.Cutting trees requires permit from the


a.Geodetic Engineer b. DENR c. DSWD d. All of the above

5. Square building lines with end tolerance of


a. +/- 3mm b. +/- 4mm c. +/- 5mm d. +/- 6mm

6. A type of drawing that is a part of working drawings needed in a construction project.


a. Working drawing b. Building plan and c. blue print d. Site plan
specification

7. Is a type of paperbased reproduction usually of technical drawing documenting done by the


architecture or an engineering design.
a. Working drawing b. Blue print c. Building plan and d. Site plan
specification

8. Is a type of technical drawing which is a part of the documentation needed to build an


engineering product or architectural plan.
a. Working drawing b. blueprint c. Building plan d. Site plan

9. Essentially shows the location of a building or house site


a. Site plan b. Working drawing c. Blue print d. Building plan

Address: Ilang Ilang Street, San Nicolas, City of San Fernando (P)
Email Add.: snis.deped@gmail.com/500142@deped.gov.ph
Contact Number: 092-5585-0758
Republic of the Philippines

Department of Education
REGION III-CENTRAL LUZON
DIVISION OF CITY OF SAN FERNANDO
SAN NICOLAS INTEGRATED SCHOOL
CITY OF SAN FERNANDO, PAMPANGA
10. Is a drawing showing the layout of a building taken at a level plan through windows and
doors approximately one meter up from the floor.
a. Site plan b. Working drawing c. Blue print d. Floor plan

11. Is a scaled drawing of the front ,rear or side of a building.


a. Site plan b. Elevation c. Blue print d. Floor plan

12. Most working drawing are drawn to the scale of 1:100, which is rather small. It is not always
possible to show important shapes, position for assembly. A separate drawing is made using
the larger scales of 1:5.
a. Site plan b. Details c. Elevation d. Floor plan

13. Is a written document prepared by an architect which serves as a set of instruction or


guidelines that accompanies a working drawing.
a. Site plan b. Specification c. Details d. Floor plan

14. Is a 90 degrees standard right angle sometimes called try square used for testing
squareness of work.
a. Square b. Plumb bob c. Steel square d. All of the above

15. Is a square with blade ranging from 6 to 12 inches .


a. Steel square b. Plumb bob c. Try square d. Level hose

16. Is a square with blade permanently set at 45 degrees.


a. Meter square b. Steel square c. Try square d. All of the above

17. Is a combination of 45 degrees and 90 degrees in one set.


a. Meter square b. Steel square c. Combination try d. Try square
and meter square

18. Is similar in appearance to try square only that the head can be slide and clamped at any
desired distance from blade.
a. Meter square b. Steel square c. Combination d. Try square
square

19. Is like a try square with sliding and adjustable blade that could be set any angle.
a. Sliding T-bevel b. Meter square c. Combination d. Try square
square

Address: Ilang Ilang Street, San Nicolas, City of San Fernando (P)
Email Add.: snis.deped@gmail.com/500142@deped.gov.ph
Contact Number: 092-5585-0758
Republic of the Philippines

Department of Education
REGION III-CENTRAL LUZON
DIVISION OF CITY OF SAN FERNANDO
SAN NICOLAS INTEGRATED SCHOOL
CITY OF SAN FERNANDO, PAMPANGA
20. Is used effectively on various framing works.
a. Sliding T-bevel b. meter square c. Framing/Steel d. try square
square

21. In the absence of circular saw, the alternative tools used for ripping plywood is
a. back saw b. crosscut saw c. keyhole saw d. rip saw

22. Claw hammer is used for


a. Driving cold chisel b. pulling and driving c. Driving pegs d. none of the above
nails

23. To avoid waste materials


a. Always refer to b. Always ask the c. Apply the direct d. All of the above
schedule before teacher the quantity cutting method
cutting of parts to be cut

24. The following are tips to avoid waste construction materials, EXCEPT
a. Carefully study the b. Determine the c. Measure twice cut d. Follow rules
plan and schedule of cutting once ‘measure twice, cut
specifications once’

25. How does method of cutting affect the efficiency of work?


a. It affects the fitting b. It increase or c. It lessen the d. All of the above
parts decreases the strength of form when
dimension assembles

Address: Ilang Ilang Street, San Nicolas, City of San Fernando (P)
Email Add.: snis.deped@gmail.com/500142@deped.gov.ph
Contact Number: 092-5585-0758

You might also like