You are on page 1of 1

S. No Code No Availability Priority Price (Rs.

) Code
1 IRC:9-2022 Required 160, (20) Traffic Census for Non-Urban Roads (Second Revision)
Required Typical Designs for Pick-up Bus Stops on Rural (i.e., Non- Urban)
2 IRC:80-2022 200, (30)
Highways (First Revision)
3 IRC:103-2022 Required 700, (30) Guidelines for Pedestrian Facilities (Second Revision)
4 IRC:130-2020 S, 800, (30) Guidelines for Identifying and Treating Black spots
5 IRC:131-2022 Required 600, (30) Guidelines for Road Asset Management System
6 IRC:134-2022 Required 400, (30) Guidelines on Skid Resistance of Pavement Surfacing
S, Guidelines for Concrete Overlays on Concrete and Composite
7 IRC: SP:17-2019 600, (30)
Pavements (First Revision),
8 IRC: SP:19-2020 S, 800, (40) Manual for Survey, Investigation and Preparation of Road Projects
S, Required Guidelines for Use of Geosynthetics in Road
9 IRC: SP:59- 2019 900, (40)
Pavements and Associated Works (First Revision)
Required Guidelines for Construction of Roller Compacted Concrete Pavements
10 IRC: SP:68-2022 200, (20)
(First Revision)
S Check Guidelines on Requirements for Environmental Clearances for Road
11 IRC: SP-93- 2017 1200, (40)
Projects
S Required Guidelines for the use of Waste Plastic in Hot Bituminous Mixes (Dry
12 IRC: SP-98- 2020 400, (20)
Process) in Wearing Courses (First Revision)
13 IRC: SP:122- 2019 600, (30) Guidelines for Green Rating of Highways
Required Guidelines for the Design and Construction of Roads using Coir
14 IRC: SP:129- 2022 400, (30)
Geotextiles
15 IRC: SP:130- 2022 S, Required 600, (30) Guidelines on Design and Installation of Noise Barriers for Roads
S, Required Guidelines on use of Industrial Wastes for Road Embankment and
16 IRC: SP:132- 2022 800, (30)
Subgrade Construction
17 IRC: SP:133- 2022 Required 400, (30) Guidelines on Reducing Carbon Footprint of Road Projects
18 IRC: SP:135- 2022 S Required 500, (30) Manual For Design of Hot Bituminous Mixes
Check Guidelines for Maintenance Management of Primary, Secondary and
19 MORT&H 300, (30)
Urban Roads
Required: 160+200+700+600+400+900+200+400+400+600+800+400+500= 6260, 6260x0.75=4695
Check= 600+800+1200+600+300= 3100, 3100x0.75=2325, LM 31837, Anil Sharma Ji Mob.:9899417608

You might also like