Professional Documents
Culture Documents
Loading / Crane tip over PTW for lifting Use of appropriate rigging
02 Offloading during loading. activities NIL tools and tackles (size,
Materials on Unauthorized Area barricaded type and capacity)
trailer using operation Signage boards Defective rigging tools 60 %
Crane Lifting Gear Execution and and tackles shall be
Failure HSE supervision removed from services.
Suspended made available. All rigging tackles and
Load Check weather accessories should be
Interference of forecasts day used as per Safe Working
un-authorized before and Load ( SWL)
Personnel. throughout the
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
activities Proper communication
duration. with other groups
PPE shall be working in the area
used all the before starting the work
times. Ensure to maintain proper
Work area shall communication while
be kept clean activities and prior to
and tidy to activities
prevent slips Flag Man should be
and trips. deployed with mobile
Communicate equipment(s) vehicles.
the hazards with Obtain applicable work
all those whom permits adhere to work
will be affected. permit requirements.
Crane to be operated by
competent, certified &
SAG licensed operators
Crane shall have a valid
thorough inspection
reports and certifications.
Ensure current month
inspection stickers on the
lifting equipment(s)
All lifting operations shall
be supervised by
competent riggers (based
on the load can assign the
grade of riggers)
Concerned supervisors
must ensure, implement
all the EHSS requirements
Ensure the outriggers are
extended fully. Use only
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
standard sized outrigger
pads as per manufacturer
recommendations for
mobile crane.
___END__
Loading / Crane tip over PTW for lifting Use of appropriate rigging
06 Offloading during loading. activities NIL tools and tackles (size,
Materials on Unauthorized Area barricaded type and capacity)
trailer using operation Signage boards Defective rigging tools 60 %
Crane Lifting Gear Execution and and tackles shall be
Failure HSE supervision removed from services.
Suspended made available. All rigging tackles and
Load Check weather accessories should be
Interference of forecasts day used as per Safe Working
un-authorized before and Load ( SWL)
Personnel. throughout the Proper communication
activities with other groups
duration. working in the area
PPE shall be before starting the work
used all the Ensure to maintain proper
times. communication while
Work area shall activities and prior to
be kept clean activities
and tidy to Flag Man should be
prevent slips deployed with mobile
and trips. equipment(s) vehicles.
Communicate Obtain applicable work
the hazards with permits adhere to work
all those whom permit requirements.
will be affected. Crane to be operated by
competent, certified &
SAG licensed operators
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Crane shall have a valid
thorough inspection
reports and certifications.
Ensure current month
inspection stickers on the
lifting equipment(s)
All lifting operations shall
be supervised by
competent riggers (based
on the load can assign the
grade of riggers)
Concerned supervisors
must ensure, implement
all the EHSS requirements
Ensure the outriggers are
extended fully. Use only
standard sized outrigger
pads as per manufacturer
recommendations for
mobile crane.
Loading / Forklift failure PTW for the Make sure the machine is
07 Offloading during activities NIL in safe operating
Materials at operation. available condition
site using Use of un-safe Area to be Avoid all body parts from 60 %
forklift. equipment(s). barricaded the line of fire.
Fall of loads Sign posted Use proper PPE’s.
during Execution and Pre-use inspection of
loading/un- HSE supervision equipment by using the
loading & made available daily checklist.
material Check weather Ensure the material are
shifting. forecasts day sited properly on the
before and
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Collision with throughout the forks. Do not make tip
other mobile/ activities loading.
stationary duration. Keep the load always in
equipment(s) PPE shall be lower position and
adjacent used all the balanced
structures, times. No passengers or riders
pedestrians and Work area shall on forklift.
overhead be kept clean Maintain the safe loading
power lines: if and tidy to capacity of the
any. prevent slips equipment, do not lift the
Forklift toppling and trips. oversized load on the
due to over Communicate forklift.
balance / the hazards with The operator should be
uneven ground all those whom license holder as per KSA
surfaces/ over will be affected. transport regulations and
loading due to should have a valid TUV
lifting of certificates.
unstable Never lift a load on a
materials and broken pallet. Don’t drive
maneuvering. the forklift fast. Seat belt
Fall of must be wear during
personnel from Operation.
transport Never drive a forklift on
vehicles potholes; as it de-stabilize
Accident at the load; as a result, load
blind spots. may fall and forklift may
Fires. topple.
Ascend/ descend on
ramps.
Stack Properly. Re-stack
unstable loads; If any.
Always stack the material
properly.
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Information, Instruction
and training must be
required.
Always look behind while
Reversing
Concerned supervisor
must implement all the
EHSS requirements
Manual Damage to Skilled Maintain proper back
08 Handling musculoskeletal employees for NIL posture & body position 60 %
system of the the activity during manual lifting &
body Proper Usage of shifting of materials
Musculoskeletal PPE’s. Position the body where
Disorders from Execution and less effort & less strain is
repetitive HSE supervision exerted.
manual made available. Avoid all body parts from
handling. line of fire.
Injuries from Follow manual lofting
fall of loads on procedures; use the legs
body parts not back. Seek for
Personnel assistance if the load is
injuries while too heavy for you.
handling / Use mechanical aids when
shifting of the load exceeds on body
materials. capacity.
Slips, trips and Do not attempt to carry
falls when long materials along
handling/ Proper communication
shifting of must be maintained
materials. between the working
groups.
Do not twist your body
while lifting
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Do not lift objects over
your head.
Maintain the access ways
& job locations
obstruction free to
prevent trips & falls.
Job supervisors should
conduct Pre-start briefing
for the working crews; all
the involved hazards /
risks control measures
and responsibilities
should be briefed.
Use of Hand In- attention, Using proper PPE- wearing hand gloves
09 Tools taking chances tools for those NIL (correct size and types ) 75 %
& ignorance activities. Pay attention in task that
during job Periodical you are performing.
execution can inspection of Selection of rights tools
results an tools Execution for specific task you are
incident. and HSE officer performing.
Exposures to made available. Check the condition of
rough & sharp Use of adequate tool before use.
edges PPE’s. Pay attention when
Selection wrong working at pinch points.
tools may Concerned supervisors
results an must all the EHSS
incident, which requirements
may cause Pre- start briefing for
crush injuries, working crew be
Caught in conducted by supervisor
between and and record the
abrasions. attendance.
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Caught in
unguarded
pinch points.
Loss of fingers
& hands due to
cuts, scratches
on hands &
fingers and
broken bones.
Use of Power Un-authorized Using proper Ensuring double insulated
10 Tools work execution tools for the NIL electric power cables. 70 %
In-attention, activity. Check the condition of
taken chances Use of adequate electric cords. Route all
& ignorance PPE’s. cables properly to prevent
during the job Periodic slips & trips.
execution. inspection of Ensure the guards are in
Slips & trips power tools by place and properly fitted
from HSE officers for applicable power
improperly laid made available. tools.
electrical Ensuring, only trained
cables. personnel should perform
Exposure to the power tool activities.
sharp & rough Use of Specific PPEs which
edged include proper gloves,
materials. body shields, ear
Cut by sharp muffs...etc.
objects. Always ensure the power
Power tools tools which are using is
may hit back safe from electrical short
during Use. circuits.
Selection of Concerned supervisors
wrong Tools. must implement all the
EHSS requirements
FACTORY OF IDEAL PRECAST CONCRETE SYSTEMS CO.
Hand arm Care should be taken
vibration when performing power
syndrome tool activity.
Fumes Job rotation to prevent
inhalation. effects of hand arm
High noise. vibration syndrome.
Snagging.
Contact with
hot surfaces.