Through multiple Interactions with contractors and consultants, the chairman has
noticed that several unresolved issues have exceeded the contractual timelines, causing
a signiflcant delay that is not in the best interest of NHAI.
3. All reported issues by the contractor & consultants through above dedicated email
address will be compiled RO Wise/PIU Wise & HQ Wise by KPMG Team. All Compiled list
will be sent to PD, RO, Tech Division Head by lst and 15th of each month.
4, All ROs and PDs as well as CcM(Technical) at the headquarters are required to
provide brief responses on dedicated column of attached excel file to the issues received
from the mentioned email addresses on a fortnightly basis. Monitoring of these responses
will take place during every last Executive Committee (EC) meeting of every month.
K Jain)
GM(T)-Chairman
30-1 2023
AII NHAI
h
-golo.*t3.
N\rAllp"\nx.lar+l G",^r"6^*h*l i.662- d+ t.\r.\":
Nationat Highways Authority of lndia
grojeJt._ a,t site, using the enctosed rriei '- toi*rt -il;;i;
the imptementation oi
E-mait I D:- Contractorissues@nhai.org.
6n
arn )
OSD to ha fitan
27.1 2023
To
3<3
;o;
-f
-" 5e
ir9!I
li:E
;':