A. INTRODUCTION
TEST IS CARRIER OUT AS FOLLOWING TO CONFIRM THE REQUIRED MIXING RATIO THROUGH
THE FOAM PROPORTIONER WHEN THE FIRE PUMP IS OPERATED.
: FOAM LINE
: SEAWATER LINE
TEST
WATER : TEST LINE
TANK
200L FIP : FOAM INLET PRESSURE
FOAM PUMP
INLET VALVE FOAM
PUMP
SIP SDP
MAIN VALVE
FOAM PROPORTIONER
FIRE
PUMP
B. METHOD
1. CONNECT TO TEST LINE WITH TEST TANK AS ABOVE DRAWING.
THIS TEST TANK IS TO BE CONFIRM THE LEVEL & VOLUME.
2. FILL THE TEST TANK WITH WATER FULL.
3. OPEN THE FOAM PUMP OUTLET VALVE
4. OPEN THE MAIN VALVE AND START THE FIRE PUMP.
5. START THE FOAM PUMP.
6. CONFIRM THE PRESSURE FDP AND SIP.
(FOAM PRESSURE MUST BE HIGHER THAN THE MAX WATER PRESSURE OF THE FIRE PUMP OR EQUAL TO IT.)
7. OPERATE FOR 1 MINUTE AND CHECK THE AMOUNT.