You are on page 1of 1

S.

SINK
el

S.SINK
fd

LUBES
M.E. ROOM

fd

LUBES
M.E. ROOM
EXTREME U EXTREME 95/97
EXCEED DIESEL EXTREME U EXTREME 95/97

CABINET
EXCEED DIESEL

LOCKER

CABINET
4,000 GALS UGT

MDP

LOCKER
4,000 GALS UGT

MDP
2,000 GALS 4,000 GALS
2,000 GALS 4,000 GALS

CORRIDOR

el
SERVICE
TOILET

CORRIDOR

SERVICE
TOILET
TOILET
COMMON

TOILET
COMMON
OFFICE

OFFICE
CABINET

CABINET
h g

el

el
i i m
l
THRU SWITCH BANK
THRU SWITCH BANK THRU SWITCH
h g BANK

k
THRU SWITCH
BANK
OWS

OWS
ca
ca

GROUND FLOOR GROUND FLOOR


E POWER LAYOUT E LIGHTING LAYOUT
2 SCALE 1:150mts.
2 SCALE 1:150mts.

APPROVED BY: PROJECT: APPROVED BY: NOTED BY: SHEET CONTENT: SHEET NO.

salvador jr p. andes SEAOIL PHILIPPINES, INCORPORATED RETAIL ENGINEERING DEPARTMENT


SEAOIL FILLING STATION
SEAOIL PHILIPPINES, INCORPORATED
22/f The Taipan Place,F.Ortigas Ave.,
AS SHOWN
E 02
Ortigas Center, Pasig City reg. no.: 0004798 issued on: 01-11-2022 LOCATION: FRANCIS GLENN YU ENGR. MICHAEL RENEE M. LUCAS
ptr no.: 0213919 issued at: pateros MOLO, ILO ILO CHIEF EXECUTIVE OFFICER RENG MANAGER
CAD/DRAWN BY:
DESIGNED BY:
REVISED BY:
DATE:
3

You might also like