PROFESSIONAL PRACTICE
(SPP)
CONTRACTOR &
GENERAL CONTRACTOR
AR. ROLAND JAY S. ELLOREN, UAP
12
BID & TENDER SHALL MEAN THE SAME.
IT REFERS TO THE CONTRACTOR’S PRICED OFFER TO THE CLIENT/OWNER FOR THE EXECUTION AND
COMPLETION OF THE WORK AND THE REMEDYING OF ANY DEFECTS THEREIN IN ACCORDANCE WITH THE
PROVISIONS OF CONTRACT.
AR. ROLAND JAY S. ELLOREN, UAP
13
ALTERNATIVE
DISPUTE
RESOLUTION
REFERS TO THE DIFFERENT WAYS PEOPLE
CAN RESOLVE DISPUTES WITHOUT TRIAL.
COMMON ADR PROCESSES INCLUDE
MEDIATION, ARBITRATION, CONCILIATION,
NEGOTIATION, & COLLABORATIVE LAW.
THESE PROCESSES ARE GENERALLY
CONFIDENTIAL, LESS FORMAL, AND LESS
STRESSFUL THAN TRADITIONAL COURT
PROCEEDINGS.
AR. ROLAND JAY S. ELLOREN, UAP
14
ARCHITECTURAL
DESIGN COMPETITION
AN ARCHITECTURAL DESIGN COMPETITION IN THE
PHILIPPINES IS A STRUCTURED EVENT WHERE
ARCHITECTS, DESIGNERS, AND SOMETIMES
STUDENTS ARE INVITED TO SUBMIT THEIR CREATIVE
DESIGN PROPOSALS FOR A SPECIFIC BUILDING OR
URBAN DEVELOPMENT. THESE COMPETITIONS AIM
TO GATHER INNOVATIVE AND DIVERSE DESIGN IDEAS
FROM PROFESSIONALS IN THE FIELD. THEY ARE
TYPICALLY ORGANIZED BY GOVERNMENT AGENCIES,
PRIVATE ORGANIZATIONS, OR EDUCATIONAL
INSTITUTIONS.
AR. ROLAND JAY S. ELLOREN, UAP
15
THE 3D WHEEL
OF ARCHITECT’S
SERVICES
- PERSONAL OR BUSINESS
AC Q UA I N TA N C E OR
RECOMMENDATION OF A FRIEND
- RECOMMENDATION OF THE
ARCHITECT’S FORMER CLIENT
- RECOMMENDATION OF ANOTHER
ARCHITECT
AR. ROLAND JAY S. ELLOREN, UAP
18
COMPARATIVE SELECTION
- INVITATION
- PRE-QUALIFICATION
- INTERVIEW
- VERIFICATION
Supermanoeuvre, Sydney
Cullinan Ivanov, Sydney
AR. ROLAND JAY S. ELLOREN, UAP
22
ADC
ADVANTAGES DISADVANTAGES
- PROCESS MAY BE EXPENSIVE AND TIME
- OPPORTUNITIES WILL BE CONSUMING.
O P E N O N LY T O P R C - - THE TIME AND EFFORT REQUIRED MAY
DISCOURAGE QUALIFIED FIRMS FROM
REGISTERED AND LICENSED PARTICIPATING.
ARCHITECTS (RLA’S) OR PRC- - SOME POTENTIALLY UNSCRUPULOUS
PROSPECTIVE CLIENTS WILL SEEK FREE
REGISTERED ARCHITECTURAL SERVICES UNDER THE GUISE OF DESIGN
FIRMS (AF’S) COMPETITION. ARCHITECTS MUST ALWAYS BE
CONSTANTLY AWARE THAT OWNERSHIP AND
COPYRIGHT ISSUES UNDER SECS. 20 (4) AND
- THE CLIENT/COMMITTEE WILL 33 OF RA 9266 MUST BE FULLY ADDRESSED
HAVE A WIDER RANGE OF UNDER ALL ARCHITECTURAL COMPETITION
RULES.
OPTIONS.
AR. ROLAND JAY S. ELLOREN, UAP
23
ADC
PROCEDURE
- WITH THE ASSISTANCE OF THE INTEGRATED
AND ACCREDITED PROFESSIONAL
ORGANIZATION OF ARCHITECTS (IAPOA) OR ITS
LOCAL CHAPTERS AND IN ACCORDANCE WITH
THE ARCHITECT’S GUIDELINES.
2.3. SU B M I T S TO T H E OW N E R A
STATEMENT OF THE PROBABLE PROJECT
CONSTRUCTION COST (SPPCC) BASED
ON CURRENT COST PARAMETERS.
3. DESIGN
DEVELOPMENT PHASE
3.1. THE DESIGN DEVELOPMENT
DOCUMENTS CONSISTING OF
PLANS, ELEVATIONS, SECTIONS AND
OTHER DRAWINGS.
4. CONTRACT
To be filled by CAAP personnel manually.
Choose the type of application by putting a check on the box:
Height Clearance Permit (HCP) Height Limitation (HL)
If HCP, Permanent Structure Temporary Structure (eg. Crane, Temporary Elevator Housing, etc.)
REQUIREMENTS: (Preferred to be initially read by the Geodetic Engineer. Data should be complete, legible, correct and with no erasures. Any discrepancy
in complying these requirements may delay processing.)
1. Elevation Plan of the Proposed Structure (for HCP application only; in A3 or A4 size bond paper)
a. If in case, the proposed structure is to be installed/constructed atop existing structure, include the height of the existing structure.
DOCUMENT PHASE
2. Certification of Geodetic Engineer (Form no. CAAP-ADM-AOD-2; in A4 size bond paper)
a. Minimum of 4 corners of the proposed structure or site, provide the Geodetic Coordinates (WGS-84 Datum) and Orthometric Height (EGM2008).
3. Certification of Control Station Used (NAMRIA/CAAP; in A4 size bond paper)
a. Copy/copies of Elevation Reference with Orthometric Height and Horizontal Control Reference with WGS-84 Coordinates (Latitude/Longitude) from
known control station of National Mapping and Resource Information Authority (NAMRIA) or CAAP.
4. Location Plan with Vicinity Map (in A3 or A4 size bond paper)
a. Indicating the Geodetic Position and Elevation of the proposed site, signed and sealed by a Geodetic Engineer.
5. Computations and Processing Reports (in A4 size bond paper)
a. For Total Station, traverse computations that is signed and sealed by a Geodetic Engineer.
b. For GNSS equipment, processing report including raw data that is signed and sealed by Geodetic Engineer.
6. Additional Requirements for Temporary Structures
a. Copy of the Approved Height Clearance Permit of proposed building where crane will be used (in A4 size bond paper)
b. Site Development plan with radial coverage of cranes duly signed by Mechanical/Civil Engineers (in A3 or A4 size bond paper)
GOVERNMENT AUTHORITIES
Email Address
Landline Number Mobile Number
DATA OF PROPOSED STRUCTURE/SITE:
Type of Structure
Site Address
CAAP-ADM-AOD-001 Page 1 of 1
Revision No.: 0
Issued Date: 15 May 2021
5. BIDDING/NEGOTIATION PHASE
Dalahican Road, Lucena City
Invitation to Bid
The Department of Public Works and Highways (DPWH), Quezon II District Engineering
5.1.B. ASSISTS THE OWNER FROM THE EARLY STAGE OF Contract Duration: 300 C.D
E S TA B L I S H I N G A L I S T O F P R O S P E C T I V E
C O N T R AC T O R S T O AWA R D I N G O F T H E DPWH-INFR-04-2016
CONSTRUCTION CONTRACT.
AR. ROLAND JAY S. ELLOREN, UAP
51
SPP DOC 202
REGULAR DESIGN SERVICES
5. BIDDING/NEGOTIATION PHASE
5.2. FOR COMPETITIVE BIDS/ PROCUREMENTS, THE ARCHITECT:
5.2.A. FURNISHES COMPLETE SETS OF THE BID DOCUMENTS FOR PURPOSES OF
BIDDING IN AS MANY SETS AS MAY BE REQUIRED TO CONDUCT A SUCCESSFUL
BIDDING. THE SAID DOCUMENTS ARE LOANED TO BIDDERS AT AN AMOUNT SUFFICIENT
TO COVER DIRECT AND INDIRECT COSTS ATTENDANT TO THE PREPARATION,
PACKAGING, REPRODUCTION AND DELIVERY OF THE SAID DOCUMENTS.
THE BID DOCUMENTS ARE THE INTELLECTUAL PROPERTY OF THE ARCHITECT (SEC 33
OF RA 9266), AND MUST BE RETURNED BY ALL ENTITIES ACQUIRING BID DOCUMENTS .
THE ARCHITECT RETAINS THE SOLE OWNERSHIP AND COPYRIGHT TO THE SAID
DOCUMENTS (SEC 33 OF RA 9266). AS SUCH, BIDDERS MUST NOT REPRODUCE NOR
USE THE DOCUMENTS FOR UNAUTHORIZED PURPOSES. THE OWNER ALSO MUST NOT
USE THE DOCUMENTS FOR ANY OTHER PURPOSE OTHER THAN THE PROJECT FOR
WHICH THE OWNER AND ARCHITECT SIGNED AN AGREEMENT.
ART GALLERIES
BANKS, EXCHANGE AND OTHER BLDGS
PARK, PLAYGROUND AND OPEN-AIR FINANCIAL
BLDGS
RECREATIONAL FACILITIES
RESIDENTIAL CONDOMINIUMS
POLICE STATIONS
CITY/TOWN HALLS & CIVIC CENTERS
COLLEGE BLDGS
CONVENTS, MONASTERIES & SEMINARIES
CORRECTIONAL & DETENTION FACILITIES
COURT HOUSES/HALLS OF JUSTICE
DORMITORIES
EXHIBITION HALLS & DISPLAY STRUCTURES
FIRE STATIONS
LAUNDRIES & CLEANING FACILITIES
LIBRARIES
MALLS/MALL COMPLEXES
5%
PROFESSIONAL FEE SHALL BE PAID BY THE OWNER AS
ENGAGEMENT FEE OR AS THE ACCEPTANCE FEE OF THE
ARCHITECT THAT SHALL COVER THE MOBILIZATION
COMPONENT OF THE SERVICES. THE PROFESSIONAL FEE
SHALL BE COMPUTED BASED ON THE STATEMENT OF
PROBABLE PROJECT CONSTRUCTION COST (SPPCC) AS
INCLUDED IN THE ANNEX OF THE SERVICE AGREEMENT.
15%
TO THE OWNER, THE OWNER SHALL PAY THE ARCHITECT
A SUM EQUAL TO FIFTEEN PERCENT (15%) OF THE
PROFESSIONAL FEE.
20%
TO THE OWNER, THE OWNER SHALL PAY THE ARCHITECT
A SUM EQUAL TO TWENTY PERCENT (20%) OF THE
PROFESSIONAL FEE.
50%
OWNER, THE OWNER SHALL PAY THE ARCHITECT A SUM
EQUAL TO FIFTY PERCENT (50%) OF THE PROFESSIONAL
FEE.
10%
5% FOR THE PERIODIC CONSTRUCTION SUPERVISION
(PCS)