You are on page 1of 1

GWS DRILLING ENGINEERING SDN. BHD.

RECOVERY TEST

CLIENT Wilmar Palm Products Sdn Bhd DATE / DAY (START) 15/5/2023
REFERENCE WELL NO TW-09 TIME 4.15 pm
DATE / DAY (FINISH) 15/5/2023
TIME 5.15 pm
LOCATION Banting
STATIC
5.50 m
WATER LEVEL
TYPE OF WELL Vertical Tube Well COLLAR HEIGHT 0.00
DEPTH OF WELL 106.0 m PUMP POSITION 53.0 m
RATE OF PUMPING, Q22.6 m3/hr

Time after Residual Water


Time after Residual
End of Pumping, t/t' Level Remarks
Start of Pumping, t (min) Drawdown (m)
t'(min) (m)
1440.00 0.00 ∞ 9.85 4.35
1440.30 0.30 4801.00 7.96 2.46
1441.00 1.00 1441.00 7.80 2.30
1441.30 1.30 1108.69 7.78 2.28
1442.00 2.00 721.00 7.71 2.21
1442.30 2.30 627.09 7.60 2.10
1443.00 3.00 481.00 7.40 1.90
1443.30 3.30 437.36 7.23 1.73
1444.00 4.00 361.00 7.00 1.50
1444.30 4.30 335.88 6.90 1.40
1445.00 5.00 289.00 6.76 1.26
1446.00 6.00 241.00 6.60 1.10
1447.00 7.00 206.71 6.60 1.10
1448.00 8.00 181.00 6.60 1.10
1449.00 9.00 161.00 6.60 1.10
1450.00 10.00 145.00 6.60 1.10
1455.00 15.00 97.00 6.60 1.10
1460.00 20.00 73.00 6.60 1.10
1465.00 25.00 58.60 6.50 1.00
1470.00 30.00 49.00 6.46 0.96
1475.00 35.00 42.14 6.40 0.90
1480.00 40.00 37.00 6.38 0.88
1485.00 45.00 33.00 6.33 0.83
1490.00 50.00 29.80 6.27 0.77
1495.00 55.00 27.18 6.19 0.69
1500.00 60.00 25.00 6.11 0.61

You might also like