The document outlines a project schedule for testing and commissioning various buildings - Watchtower/Aeropack, Natura, and Premium. It includes tasks for inspection, troubleshooting, and testing of cabling works done by others at each building. It also includes configuration, delivery, installation and testing of an ACS server and clients, with final testing scheduled to take place from September 10th to 28th once the network backbone is in place.
The document outlines a project schedule for testing and commissioning various buildings - Watchtower/Aeropack, Natura, and Premium. It includes tasks for inspection, troubleshooting, and testing of cabling works done by others at each building. It also includes configuration, delivery, installation and testing of an ACS server and clients, with final testing scheduled to take place from September 10th to 28th once the network backbone is in place.
The document outlines a project schedule for testing and commissioning various buildings - Watchtower/Aeropack, Natura, and Premium. It includes tasks for inspection, troubleshooting, and testing of cabling works done by others at each building. It also includes configuration, delivery, installation and testing of an ACS server and clients, with final testing scheduled to take place from September 10th to 28th once the network backbone is in place.
1.1 A1 Building 1.2 Testing & Commissioning 0% 8/16/23 8/18/23 3 pre-tested witnessed by DCI 1.3 A2 Building 1.4 Testing & Commissioning 0% 8/19/23 8/22/23 4 pre-tested witnessed by DCI 1.5 A3 Building 1.6 Testing & Commissioning 0% 8/19/23 8/22/23 4 pre-tested witnessed by DCI 1.7 A4 Building 1.8 Testing & Commissioning 0% 8/23/23 8/24/23 2 pre-tested witnessed by DCI 1.9 A6 Building 1.10 Testing & Commissioning 0% 8/23/23 8/24/23 2 pre-tested witnessed by DCI 1.11 A7 Building 1.12 Testing & Commissioning 0% 8/23/23 8/24/23 2 pre-tested witnessed by DCI 1.13 WatchTower Building 1.14 Testing & Commissioning 0% 8/25/23 8/26/23 2 1 DC configured but not connected; conduit layout to be identified by others 2 NATURA (Testing & Commissioning) 8/29/23 9/8/23 11 2 2.1 C1A Building 21 of 23 2.2 Inspection/ Testing of Works done by others 0% 8/29/23 8/30/23 2 joint inspection; 2 SRIs 2.3 Troubleshooting on Cabling Works done by others, if any 0% 8/31/23 9/5/23 6 2.4 Testing & Commissioning 0% 9/6/23 9/8/23 3 2.5 C1B Building 8 of 8 2.6 Inspection/ Testing of Cables done by others 0% 8/29/23 8/30/23 2 joint inspection 2.7 Troubleshooting on Cabling Works done by others, if any 0% 8/31/23 9/5/23 6 2.8 Testing & Commissioning 0% 9/6/23 9/8/23 3 3 PREMIUM (Testing & Commissioning) 9/9/23 9/23/23 15 2 3.1 B1 Building 3.2 Inspection/ Testing of Cables done by others 0% 9/9/23 9/12/23 4 joint inspection 3.3 Troubleshooting on Cabling Works done by others, if any 0% 9/13/23 9/18/23 6 3.4 Testing & Commissioning 0% 9/19/23 9/23/23 5 need permanent 220v power supply for ACS Contoller AGP 3.5 B2 Building 17 of 48 3.6 Inspection/ Testing of Cables done by others 0% 9/9/23 9/12/23 4 joint inspection 3.7 Troubleshooting on Cabling Works done by others, if any 0% 9/13/23 9/18/23 6 3.8 Testing & Commissioning 0% 9/19/23 9/23/23 5 3.9 B3 Building 5 of 5 3.10 Inspection/ Testing of Cables done by others 0% 9/9/23 9/11/23 3 joint inspection 3.11 Troubleshooting on Cabling Works done by others, if any 0% 9/12/23 9/17/23 6 3.12 Testing & Commissioning 0% 9/18/23 9/22/23 5 need permanent 220v power supply for ACS Contoller AGP 3.13 B6 Building 5 of 5 3.14 Inspection/ Testing of Cables done by others 0% 9/9/23 9/11/23 3 joint inspection; confirm power supply needed (D#01,08,16,17) 3.15 Troubleshooting on Cabling Works done by others, if any 0% 9/12/23 9/17/23 6 3.16 Testing & Commissioning 0% 9/18/23 9/22/23 5 need permanent 220v power supply for ACS Contoller AGP 3.17 B7 Building 6 of 6 3.18 Inspection/ Testing of Cables done by others 0% 9/9/23 9/11/23 3 joint inspection; drop bolt 3.19 Troubleshooting on Cabling Works done by others, if any 0% 9/12/23 9/17/23 6 3.20 Testing & Commissioning 0% 9/18/23 9/22/23 5 need permanent 220v power supply for ACS 4 ACS SERVER AND CLIENTS/ FINAL TESTING 8/7/23 9/28/23 53 2 4.1 Configuration 85% 8/7/23 8/22/23 16 installation and configuration ACS for adjustments during T&C; interconnection to clients done. 4.2 Delivery at Site 0% 8/23/23 8/23/23 1 4.3 Installation at Site 0% 8/24/23 8/26/23 3 4.4 Synchronization of Database 0% 8/27/23 8/30/23 4 Network Backbone needed to be in place 4.5 Pre-Testing 0% 8/31/23 9/9/23 10 Network Backbone needed to be in place 4.6 Final Testing 0% 9/10/23 9/28/23 19 Network Backbone needed to be in place