Professional Documents
Culture Documents
325
20 20
FORMATION LEVEL RL -
LENTH OF BRIDGE
105.955M.
PROPOSED BRIDGE SITE AND EXISTING BT ROAD
EXISTING BT ROAD APPROACHES
103.79
103.0
102.0 60.0
20.0 RL - 100
101.0 RL - 99
96.0
100 96.0
96.0
99.0 RL - 100
RL - 99
98.0
RL - 98
97.0
96.0
DATUM 95.0
103.655
102.906
102.395
101.775
100.795
100.825
101.815
101.295
103.215
100.065
100.495
101.425
101.375
101.555
100.03
97.565
97.625
97.649
97.525
101.81
97.685
97.595
101.68
97.615
97.545
97.545
98.075
100.68
100.03
101.14
102.11
103.19
103.79
99.21
99.94
99.78
99.62
99.46
99.16
99.09
98.71
98.69
98.99
99.83
98.71
97.58
97.53
97.56
97.61
97.56
97.61
97.63
97.65
97.57
G.L. IN METER
97.5
98.1
A1
295.0
280.0
250.0
255.0
260.0
265.0
270.0
315.0
320.0
325.0
330.0
335.0
350.0
355.0
360.0
400.0
405.0
410.0
440.0
470.0
515.0
540.0
545.0
370.0
375.0
380.0
300.0
590.0
200.0
225.0
420.0
450.0
425.0
430.0
455.0
460.0
100.0
110.0
125.0
150.0
175.0
605.0
610.0
630.0
633.0
660.0
685.0
710.0
735.0
760.0
775.0
785.0
610.0
605.0
50.0
75.0
25.0
0.0
CHAINAGE IN METER
BOULDER
3.75
PITCHING
WHEEL KERB BLOCK 12.0 WHEEL 7.5 EXECUTIVE ENGINNER
GUARD GUARD
8.4
12.0
ASSISTANT ENGINEER
8.4
B.T. ROAD C.L OF ROADWAY C.L OF ROADWAY
3.75
7.5
SUB ENGINEER
A1 A2
STRUCTURAL ENGINEERING CONSULTANT
12.0
B.T. ROAD BRIDGE PORTION 3325.000M B.T ROAD infracon design devision of
Thakare Consultancy
12.0 Services Pvt. LTD.
BOULDER HARD
PITCHING
5.0 SHOULDER
5.0 First Floor, Shukla Complex,Near Raipura
Square Opposite Dangania Talab Raipur( C.G. )
Phone +919752019555
PLAN OF APPROACH ROAD Checked by- Prof.RAJESH B. THAKARE
Govt. Registration Engineer Licence No. 488/06-07
PROJECT
CONSTRUCTION OF BRIDGE ACROSS
TEL RIVER ON S.H. - 2B TO KUMHDAIKALA
NOTES :- ROAD AT CHAINAGE 14325 M. IN P.I.U.-
GARIABAND (C.G.)
1 - CARRIAGEWAY B.T. PORTION 3.75M.(2X1.875M. HARD SHOULDER)
TITLE
2 - REFER SEPARATE DRAWING FOR DETAILS OF P.C.C RETURN
AND TOE WALL.
DETAILS OF APPROACH ROAD
DWG NO. : DATE :
TEL/S-K/SP/01 A. 01-09-2017