Date:

Integrated Management System 08th Dec 2019


Document Code.
Document Title: PMC_IMSP_20_FRM_01
Inspection Checklist Rev. No. 02 Page No. 1 of 1

CLIENT: DATE:
ITEM DESCRIPTION: JOB NO:
ACTIVITY:
No. Questions Yes No N/A Comments from PRETECH Inspector Comments from Client

1 Conducted Incoming material inspection?

2 Verify the Paint system has been approved?

3 Check Protection/covering/masking before Blasting?


4 Blasting Inspection done?

5 Check external and internal (if the tank or vessel)


surface cleanliness after blasting done?
6 Verify the Paints?
7 Verify Mixing Ratio with product data sheet?
8 Check Wet film thickness (WFT) during application?
9 Check Dry Film Thickness (DFT) & Visual inspection?
10 Carried out Final Painting Inspection?

11 Materials has been Packed properly?

12 Have you confirmed that job is preserved properly ?

13 Have you confirm the Materials are Ready for


Dispatch?

Remarks:

Prepared by: Approved by: