Referring to surveyor data below, there is a difference in eleva on in the post column for hoist.
1. To adjust the eleva on bukaka will add shimplate between bukaka’s material and JEL’s
material.
2. To insert the shimplate, bolt will be slightly loosened.
3. A er obtaining the appropriate eleva on, the shimplate will be welded to post column
baseplate by bukaka.
4. A er shimplate is welded, the bolt will be re- ghtened.
5. This method will be used to all Transfer Tower building with post column eleva on problem.