QTN ISP Head Office - Bay square 7# 205 QTN No.

DSQ 105
Subject : Quotation for Server Rack and Civil Works Rev-1 Date: 9-27-23
With reference to the above mentioned project, Below are the bill of quantities
Sr No Description Qty Unit Rate Amount(AED) Remarks
I SECTION A - HVAC Works in Office cabin
Supply and installation of VAV with
1 1 Nos 2,800.00 AED 2,800.00 Completed
thermostat & proper supporting
Supply and installlation of pre insulated & flexbile
duct with proper supportting connetion with VAV to
2 Supply air Griil 1 Nos 2,000.00 AED 2,000.00 Completed

Ceiling recifitcation works necessary during VAV


installation works including cut-out, gypsum board,
3 painting and installtion of 1 Nos 850.00 AED 850.00 Completed
access panels for VAV

II SECTION B - Meeting Room to Office Cabin


Electrical Works
1 Power relocation on wall 1 Nos 250.00 AED 250.00 Completed

2 Floor Box Relocation 1 Nos 350.00 AED 350.00 Completed

3 New power point for Tv with HDMI 1 Nos 500.00 AED 500.00 Completed
Provision
4 Ceiling Lights Modifictation 1 Nos 300.00 AED 300.00 Completed

Civil Works

1 Carpet Removal and Reinstallation works 17 Sqm 50.00 AED 850.00 Completed

2 Modification of floor below for floor box 1 Item 300.00 AED 300.00 Completed

3 Gypsum works at old TV wall including 4 Sqm 150.00 AED 600.00 Completed
Painting
4 Gypsum works at new TV wall with MDF 1 Item 850.00 AED 850.00 Completed
backing
5 Ceiling rectification for light modification 1 Item 650.00 AED 650.00 Completed

6 Glass Frosting Works 8 Sqm 150.00 AED 1,200.00 Completed

II SECTION B - Meeting Room to Office Cabin


Supply and installation of Glossy PU paint finish over
head storage cabinet - 1.2m x 4m
1 1 Item 6,500.00 Excluded Excluded

2 Additional MDF backing on wall for the 1 Item 250.00 Excluded


storage
Excluded

3 Wall rectification works 1 Item 500.00 Excluded


Excluded
TOTAL IN AED 11,500.00
Please Note:
1 Any change in design or scope will be considered as a variation and will be charged seperately.
2 All work completed will be signed off by raising a WIR. Any damages caused later will not be covered under this quote.

Quote Validity:25 Days Validity. 5% Vat additional as per UAE FTA policy.

Payment Terms : As Agreed


We trust our prices are competitive and look forward to receive your order at the earliest.
We assure that we shall execute our works with utmost sincerity and in a timebound manner, meeting your expectations of a quality project management and project
delivery.

You might also like