VARIATION ORDER

SITE: DUBAI - NAD EL SHEBA Ref. no:NAD EL SHEBA/1/001

SHAMESA AL DEWEEES DATE: 19/4/2023


TEAM 90 ENGINEERING CONSULTANCY EVICO CONTRACTING COMPANY

SN DECRIPTION QTY UNIT RATE TOTAL


1 Electerical and Plumbing works for all bathrooms
1.1 Electrical works inside all toilet for hidden light of shelfs and for mirrors 1 LS 7000 7000
1.2 Modfication for location of wash of 3 bathroom including new pips 1 LS 6500 6500
1.3 Block Works for Shelfs above the Flash Tank for 14 Toilt 1 LS 5000 5000
1.4 Block Works for Shelfs at shower with total wall length for 14 toilet 1 LS 11000 11000
1.5 Plaster For All Blocks Works 1 Ls 7000 7000
1.6 Modifcation for location of pantry in majlis 1 Ls 1300 1300
1.7 Supply and Installation angle for wall decore with Accessories for 14 Toilet 14 Ls 400 5600
43,400
2 Modifications and Demolish Works
2.1 Modification for bath room at Majlis 1 Ls 1000 1000
2.2 Demolishing works for old Tiles at Majlis with Cleaning Works 1 Ls 2500 2500
2.3 Demolishing works for door opening at kids room and open two doors at Hall 1 Ls 2000 2000
5,500
Total Price 48,900.00
Vat 5% 2,445.00
Total + Vat 51,345.00