Date : DECEMBER 1, 2023

Project : JOYRIDE - WAREHOUSE


Location : Marcos High-way
Subject : ADDITIONAL WORKS
UNIT TOTAL
ITEM DESCRIPTION QTY UNIT COST AMOUNT
I. SCOPE OF WORKS
1 DISMANTLING / RE-INSTALLATION OF NEWLY INSTALLED DRYWALL 54.00 SQ.M 500.00 27,000.00
2 MINOR REPAIR WORKS 1.00 LOT 6,250.00 6,250.00
3 REPAINTING WORKS 108.00 SQ.M 187.50 20,250.00
4 ALOTMENT AND ADDITIONAL FOR DAMAGED MATERIALS 1.00 LOT 12,500.00 12,500.00
5 CHIPPING OF PLAIN SLAB TO ROUGH SURFACE 4.00 SQ.M 375.00 1,500.00
6 EPOXY PAINT OF FLOOR 21.00 SQ.M 490.00 10,290.00
7 CONCRETE TOPPING W/ CONCRETE EPOXY AND MESHWIRE 4.00 SQ.M 1,775.00 7,100.00
8 SUPPLY / INSTALLATION OF DOOR & JAMB ( PAINTED FIN. ) ACC. OSM 1.00 SET 22,500.00 22,500.00
SUB-TOTAL ITEM I: 107,390.00
II. PRELIMINARIES
1 MOBILIZATION / DEMOBILIZATION 1.00 LOT 5,000.00 5,000.00
3 WATER / ELECTRICAL CONSUMPTION BY OWNER 1.00 LOT BY OWNER
4 HAULING / DISPOSAL OF DEBRIS 1.00 LOT 3,000.00 3,000.00
5 HOUSE RENTAL 1.00 LOT 5,000.00 5,000.00
SUB-TOTAL ITEM II: 13,000.00

TOTAL PROJECT COST 120,390.00


DISCOUNT 10,390.00
DISCOUNTED COST 110,000.00

NOTE:
MATERIAL TO BE USED: TERMS: 50% DP, BAL. THRU PROGRESS BILLING
1. EPOXY PAINT 4. PAINTING MATERIALS DURATION: 15 DAYS
2. SAND WARRANTY: 1 YEAR
3. PORTLAND CEMENT PRICE VALIDITY: DEC. 18, 2023

SUBMITTED BY:

DENNIS PINEDA CONSTRUCTION, INC Evaluated & Approved:

ENGR. EFREN V. DELOS REYES


HEAD ENGR.