You are on page 1of 2

KEY PLAN :

ISO CONTAINER ISO CONTAINER

RB2 RB2

sampling holes (note 6)


6 ZONE A
ASD piping (note 4)

ISO
CONTAI
RB2

NER
ISO
RB2
CONTAIN

ER
ISO
CONTAIN
RB2

ISO
ER

CONTAIN
RB2
ISO
RB2

ER
CONTAIN

Unit
ISO

3
ER

CONTAIN
ISO
CONTAI

RB2
LSPI

ER
DRA

NER

ISO
CONTAI
ISO

RB2
CONTAIN
LSPI

NER

Unit
DRA
Access
Engine

ER

ISO

2
Meeting

CONTAIN
Access

Romm
Engine

RB2
ER
StorageA
Office

tank

Unit
1
ISO CONTAINER

Mixing
Office

tank
ISO CONTAINER

Finishing
Warehou
out

se
material

Office
Office

Kitch
W.C
W.C
Warehou
Raw

Finishing
Warehou
material

se

WASTESUMP
se
material
In
Utility cleanning

WATER
and

Labor
k

RB2
par

RB2 Car

Mosque
5
ISO CONTAINER
ISO CONTAINER

RB2
RB2

VESDA REFERENCE DOCUMENTS :


AREA 1
DOCUMENT N° DESIGNATION
(note 5)
AR0421-SPC-FG-00-001 General specification for F&G works

AR0421-SPC-PP-00-001 GENERAL PIPING LAYOUT

4 NOTES:

1. EXACT LOCATION AND DETAILS OF INSTALLATION SHALL BE FINALISED BY SUPPLIER AS PER

DEVICE'S SPECIFICATIONS

2. THE NUMBER AND THE EXACT LOCATION OF FLAME DETECTORS SHALL BE VERIFIED AND

CHECKED ACCORDING TO THE SPECIFICATIONS OF THE DETECTORS TO BE INSTALLED


ISO CONTAINER ISO CONTAINER
3. THE ASD SYSTEM SHALL BE ENDORSED, DESIGNED AND ARRANGED BY THE SUPPLIER

4. ASD PIPING SIZING AND INSTALLATION SHALL BE ACCORDING TO THE SUPPLIER SPECIFICATIONS
RB2 RB2
5. VESDA UNITS INCLUDING ALL NECESSARY ACCESSORIES SHALL BE FINALIZED BY THE SUPPLIER

6. ASD DESIGN CORRECTS SHORTCOMINGS OF CONVENTIONAL SMOKE DETECTORS BY USING A

3 SAMPLING PIPE WITH MULTIPLE HOLES

Note (*)

Unit 1 LEGEND:

ISO CONTAINER
Storage SMOKE DETECTOR
tank A
LSPI DRA

HEAT DETECTOR

3 3-IR FLAME DETECTOR

MANUAL ALARM CALL POINT - MACP


ISO CONTAINER
VESDA
AREA 2
(note 5)
Mixing
AUDIBLE ALARM
LSPI DRA
tank

VISUAL ALARM

2
TOTAL LIST
WASTE WATER
Kitch SUMP Device Quantity
Laboratory
smoke detector 10

heat detector 2
Office
Office Electrical room flame detector 3

W.C manual alarm call point 10


W.C
audible alarm 4

1 visual alarm 4

E D C B A A 07/02/2022 IFR MSR/OD MAJ GE/SN

REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY


CLIENT :

ZAMIL TRADE AND SERVICES

EPPM International DMCC


Immeuble FATMA les Jardins du Lac-1053 Tunis - Tunisie
CL OF ROAD
Tel : (+216) 71 168 100 - (+216) 71 861 988 - Fax : (+216) 71 190 918 - E-mail : eppm@eppm.com.tn

PROJECT :

ENGINEERING SERVICES FOR ZAMIL NEW BLENDING


FACILITY
ZONE A( BUILDING ADMINISTRATION FIRST FLOOR / BLENDING UNIT / ISO CONTAINER UNIT ) DOCUMENT TITLE : EPPM DOCUMENT N° :

A R 0 4 2 1 DW G FG 0 0 0 0 1
F&G LAYOUT CLIENT DOCUMENT N° :

* * * * * * * * * * * * * * *

SCALE : 1/75 DATE : 08/06/2021 SIZE A0 SHEET 1/2 REV : A


KEY PLAN :

Kitch
Meeting Romm
Office Office Office

W.C

ISO
CONTAIN
RB2

ER
ISO
RB2
CONTAIN

ER
ISO
CONTAIN
RB2

ISO
CONTAIN
ER

RB2
ISO
RB2

ER
CONTAIN

Unit
ISO

3
ER

CONTAIN
ISO
CONTAIN

RB2
LSPI

ER
DRA

ISO
ER

CONTAIN
ISO

RB2
CONTAIN
LSPI

ER

Unit
DRA
Access
Engine

ISO
ER

2
Meeting

CONTAIN
Access
Engine

Romm

RB2
ER
W.C

StorageA
Office

tank

Unit
1
Mixing
Office

tank
Finishing
Warehou
out
material
se

Office
Office

Kitch
W.C
W.C
Warehou
Raw

Finishing In
Warehou
material

se

WASTESUMP
se
material
Utility cleanning

WATER
and

Labor
k
par
Car

Mosque
REFERENCE DOCUMENTS :
DOCUMENT N°

AR0421-SPC-FG-00-001 General specification for F&G works


ZONE A ( BUILDING ADMINISTRATION SECOND FLOOR ) AR0421-SPC-PP-00-001 GENERAL PIPING LAYOUT

NOTES:
1. EXACT LOCATION AND DETAILS OF INSTALLATION SHALL BE FINALISED BY SUPPLIER AS PER

DEVICE'S SPECIFICATIONS

2. THE NUMBER AND THE EXACT LOCATION OF FLAME DETECTORS SHALL BE VERIFIED AND

CHECKED ACCORDING TO THE SPECIFICATIONS OF THE DETECTORS TO BE INSTALLED

3. THE ASD SYSTEM SHALL BE ENDORSED, DESIGNED AND ARRANGED BY THE SUPPLIER
WASTE WATER 4. ASD PIPING SIZING AND INSTALLATION SHALL BE ACCORDING TO THE SUPPLIER SPECIFICATIONS
SUMP
5. VESDA UNITS INCLUDING ALL NECESSARY ACCESSORIES SHALL BE FINALIZED BY THE SUPPLIER

4 6. ASD DESIGN CORRECTS SHORTCOMINGS OF CONVENTIONAL SMOKE DETECTORS BY USING A

SAMPLING PIPE WITH MULTIPLE HOLES

LEGEND:

SMOKE DETECTOR
Access
Warehouse Warehouse Engine
Finishing material Finishing material
out In
HEAT DETECTOR

3
sampling holes (note 6)
Warehouse
Access 3-IR FLAME DETECTOR
Raw material Engine

ASD piping (note 4)

Diesel generator
MANUAL ALARM CALL POINT - MACP

with shelter
VESDA AUDIBLE ALARM
AREA 3
(note 5)

2 VISUAL ALARM

TOTAL LIST

Device Quantity
Mosque
smoke detector 10
Office Utility
and cleanning Labor Septic tank heat detector 2

flame detector 3

manual alarm call point 10


1
audible alarm 4

visual alarm 4

A 07/02/2022 IFR MSR/OD MAJ GE/SN

REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY


CLIENT :

ZAMIL TRADE AND SERVICES

ZONE B ( WAREHOUSE AND BUILDING ADMINISTRATION )


EPPM International DMCC
Immeuble FATMA les Jardins du Lac-1053 Tunis - Tunisie
Tel : (+216) 71 168 100 - (+216) 71 861 988 - Fax : (+216) 71 190 918 - E-mail : eppm@eppm.com.tn

PROJECT :

ENGINEERING SERVICES FOR ZAMIL NEW BLENDING


FACILITY
DOCUMENT TITLE : EPPM DOCUMENT N° :

A R 0 4 2 1 DWG FG 0 0 0 0 1
F&G LAYOUT CLIENT DOCUMENT N° :

* * * * * * * * * * * * * * *

SCALE : NS DATE : 08/06/2021 SIZE A0 SHEET 2/2 REV : A

You might also like