Professional Documents
Culture Documents
AR0421DWGFG00001RevA (Alternative 2)
AR0421DWGFG00001RevA (Alternative 2)
RB2 RB2
ISO
CONTAI
RB2
NER
ISO
RB2
CONTAIN
ER
ISO
CONTAIN
RB2
ISO
ER
CONTAIN
RB2
ISO
RB2
ER
CONTAIN
Unit
ISO
3
ER
CONTAIN
ISO
CONTAI
RB2
LSPI
ER
DRA
NER
ISO
CONTAI
ISO
RB2
CONTAIN
LSPI
NER
Unit
DRA
Access
Engine
ER
ISO
2
Meeting
CONTAIN
Access
Romm
Engine
RB2
ER
StorageA
Office
tank
Unit
1
ISO CONTAINER
Mixing
Office
tank
ISO CONTAINER
Finishing
Warehou
out
se
material
Office
Office
Kitch
W.C
W.C
Warehou
Raw
Finishing
Warehou
material
se
WASTESUMP
se
material
In
Utility cleanning
WATER
and
Labor
k
RB2
par
RB2 Car
Mosque
5
ISO CONTAINER
ISO CONTAINER
RB2
RB2
4 NOTES:
DEVICE'S SPECIFICATIONS
2. THE NUMBER AND THE EXACT LOCATION OF FLAME DETECTORS SHALL BE VERIFIED AND
4. ASD PIPING SIZING AND INSTALLATION SHALL BE ACCORDING TO THE SUPPLIER SPECIFICATIONS
RB2 RB2
5. VESDA UNITS INCLUDING ALL NECESSARY ACCESSORIES SHALL BE FINALIZED BY THE SUPPLIER
Note (*)
Unit 1 LEGEND:
ISO CONTAINER
Storage SMOKE DETECTOR
tank A
LSPI DRA
HEAT DETECTOR
VISUAL ALARM
2
TOTAL LIST
WASTE WATER
Kitch SUMP Device Quantity
Laboratory
smoke detector 10
heat detector 2
Office
Office Electrical room flame detector 3
1 visual alarm 4
PROJECT :
A R 0 4 2 1 DW G FG 0 0 0 0 1
F&G LAYOUT CLIENT DOCUMENT N° :
* * * * * * * * * * * * * * *
Kitch
Meeting Romm
Office Office Office
W.C
ISO
CONTAIN
RB2
ER
ISO
RB2
CONTAIN
ER
ISO
CONTAIN
RB2
ISO
CONTAIN
ER
RB2
ISO
RB2
ER
CONTAIN
Unit
ISO
3
ER
CONTAIN
ISO
CONTAIN
RB2
LSPI
ER
DRA
ISO
ER
CONTAIN
ISO
RB2
CONTAIN
LSPI
ER
Unit
DRA
Access
Engine
ISO
ER
2
Meeting
CONTAIN
Access
Engine
Romm
RB2
ER
W.C
StorageA
Office
tank
Unit
1
Mixing
Office
tank
Finishing
Warehou
out
material
se
Office
Office
Kitch
W.C
W.C
Warehou
Raw
Finishing In
Warehou
material
se
WASTESUMP
se
material
Utility cleanning
WATER
and
Labor
k
par
Car
Mosque
REFERENCE DOCUMENTS :
DOCUMENT N°
NOTES:
1. EXACT LOCATION AND DETAILS OF INSTALLATION SHALL BE FINALISED BY SUPPLIER AS PER
DEVICE'S SPECIFICATIONS
2. THE NUMBER AND THE EXACT LOCATION OF FLAME DETECTORS SHALL BE VERIFIED AND
3. THE ASD SYSTEM SHALL BE ENDORSED, DESIGNED AND ARRANGED BY THE SUPPLIER
WASTE WATER 4. ASD PIPING SIZING AND INSTALLATION SHALL BE ACCORDING TO THE SUPPLIER SPECIFICATIONS
SUMP
5. VESDA UNITS INCLUDING ALL NECESSARY ACCESSORIES SHALL BE FINALIZED BY THE SUPPLIER
LEGEND:
SMOKE DETECTOR
Access
Warehouse Warehouse Engine
Finishing material Finishing material
out In
HEAT DETECTOR
3
sampling holes (note 6)
Warehouse
Access 3-IR FLAME DETECTOR
Raw material Engine
Diesel generator
MANUAL ALARM CALL POINT - MACP
with shelter
VESDA AUDIBLE ALARM
AREA 3
(note 5)
2 VISUAL ALARM
TOTAL LIST
Device Quantity
Mosque
smoke detector 10
Office Utility
and cleanning Labor Septic tank heat detector 2
flame detector 3
visual alarm 4
PROJECT :
A R 0 4 2 1 DWG FG 0 0 0 0 1
F&G LAYOUT CLIENT DOCUMENT N° :
* * * * * * * * * * * * * * *