Professional Documents
Culture Documents
www.louvrelounge.co.nz
CONTENTS
1. Required Tools & Man Force 3
3. Product Description 6
5. Installation 9-18
7. Remote Setup 22
8. Disassembly 22
www.louvrelounge.co.nz | 2
REQUIRED TOOLS & MAN FORCE
Tools:
1. Ladder
2. Tape Measure
3. Pencil
4. Spirit Level
5. Rubber Mallet
6. Electric Drill
7. M10/13 Open Wrench (SUPPLIED)
8. 5mm Hexagon Wrench (SUPPLIED)
Man Force
We recommend installing your Louvre Lounge with 2-3
people although having a third person would make the
installation quicker.
www.louvrelounge.co.nz | 3
PARTS LIST
Before commencing the installation, please confirm all
parts are present. Email us at help@louvrelounge.co.nz
if you have any issues.
www.louvrelounge.co.nz | 4
PARTS LIST
Hardware:
Aluminium Structure:
www.louvrelounge.co.nz | 5
PARTS LIST
PRODUCT DESCRIPTION
Make the most of your outdoor living area with the 6400
series Louvre Lounge. The motorised louvres and LED lights
transform your outdoor space into the ultimate entertaining
area for you to enjoy for years to come.
www.louvrelounge.co.nz | 6
SAFETY DISCLAIMER'S
WARNING: For the safety of yourself and others, it is
essential to follow all instructions and obey warnings.
Definitions:
This warning triangle calls attention to hazards that
that can lead to death, severe injuries or which are
important for the functioning of the Pergola.
Safety Disclaimer's
1. You are unsure if the pergola can be installed in the chosen spot
for installation.
2. You do not understand the instruction manual or parts of it.
3. You do not have the necessary tools available.
4. You do not have the necessary technical knowledge
www.louvrelounge.co.nz | 7
Do not install the pergola when you find damaged parts or parts that
are missing. Contact us.
Keep children and pets out of the working area during assembly and
adjustments.
This product and its fixing parts are only suitable for installation on a
plain cement pad. If the concrete pad shows cracks or you require
installation on a wooden deck, please consult a professional before
installation.
The sheeting used to protect the paint must be removed after installation. This
structure is a non-permanent structure, the warranty does not cover damage
incurred under extreme weather conditions including heavy rain, high winds or
if exposed to high heat from heaters or BBQs. Please refer to the warranty
policy for more information.
Safety precautions should always be followed when assembling and using this
product to reduce the risk of personal injury and damage to equipment. Never
leave children unattended around/under this pergola. Do not attempt to
assemble or use the pergola in moderate or heavy wind conditions.
Always secure the pergola and keep the louvres open during heavy winds or
extreme weather to avoid damage to the pergola or personal injury.
www.louvrelounge.co.nz | 8
INSTALLATION
Step 1:
Attach base plate③x6 to the bottom of posts (C-1 x1,
C-2 x1, C-3 x1, C-4 x1, C-5 x2), use bolts ①x12 to attach
using hex key or electric drill.
C-1 & C-3 and C-2 & C-4 posts need to be installed
diagonally.
www.louvrelounge.co.nz | 9
INSTALLATION
Step 2:
a. Remove bolts ⑥ from each post and set them aside.
A total of 32 bolts should be set aside.
TIP: Install beam A-5 last once all other beams have
been installed.
www.louvrelounge.co.nz
www.louvrelounge.co.nz||10
9
INSTALLATION
Step 3:
Use bolts ⑥x4 to fasten beam A-5 as shown in the
diagram.
www.louvrelounge.co.nz | 11
INSTALLATION
Step 4:
Attach the upright covers ④x4 to the top of each post.
Use bolts ⑥x8 to fasten.
www.louvrelounge.co.nz | 12
INSTALLATION
Step 5:
Attach all eight gutters (B-1 x4, B-2 x2 and B-3 x2) by
slotting them on the inside of all beams.
www.louvrelounge.co.nz | 13
INSTALLATION
Step 6:
Locate the holes in the centre of beams(A-2, A-3 and
A-5).
Place the driving louvre D-3 in line with the 7th groove
on the beams. Fit all common louvres D-1X60 into the
remaining grooves on the beams.
www.louvrelounge.co.nz | 14
INSTALLATION
Step 7:
a. Unscrew the 4 bolts on both B-2 beams where the
motors will be positioned and set aside. Fasten both
motors ⑨ and ⑩ to beams A-2 and A-3 with the 4 bolts
previously set aside.
www.louvrelounge.co.nz | 15
INSTALLATION
Step 8:
Ⓔ
Attach the control rods x4 to each side of the
pergola by placing the plastic spacer ⑦ between the
control rod and the louvre's, threading the bolt ⑥
through from the control rod side and tightening with
a nut ⑧.
www.louvrelounge.co.nz | 16
INSTALLATION
Step 9:
Place a rubber gutter connector ⑫ in each of the four
corners to seal the gutters. Next, place the 50 to 40
pipe fitting⑬ inside the gutter connecter closest to
each motor.
www.louvrelounge.co.nz | 17
INSTALLATION
Step 10:
a. Connect the motor to the power cable by
connecting the male and female plugs (DC24V to
DC24V).
www.louvrelounge.co.nz | 18
FOUNDATION INSTALLATION
The last step in the installation process involves
securing your Louvre Lounge to the foundation. We
provide instructions to install into a concrete pad,
although you must seek professional advice to ensure
the pergola is installed correctly to all local regulations.
www.louvrelounge.co.nz | 19
TIMBER FOUNDATION INSTALLATION
Using M10 timber screws, a minimum of 80mm
embedment (d) is required for low wind-rated areas.
For high wind-rated areas, a minimum embedment (d)
of 120mm is required however, please consult a
professional. Fasten 4 screws per post. Each screw
must be embedded into a joist or noggin to ensure
strength and safety.
140mm
Post
Baseplate
Timber deck
Joist
d
Noggin
attached
structurally
to joist
www.louvrelounge.co.nz | 20
FOUNDATION INSTALLATION
Refer to the following diagram to ensure the pergola is
perfectly square before installing the foundation
permanently.
SIZE: 575X400 CM
2503 (Overall height)
39
57
45
np
48
os
(
Ov
ts)
er
Motor
a ll
is t d
an
ce
26
)
64
Di (
sta
nc
be e
we t
en
os p
ts)
56
88
37
05
(D
40
is t
05
an
(O
ce
ve
be
Motor
ra
tw
ll d
ee
is t
np
an
os
ce
ts)
)
www.louvrelounge.co.nz | 21
REMOTE SETUP
Once all installation steps are complete, plug the
pergola into the power outlet to start the remote
pairing process.
Remote Pairing:
Press and hold the lamp button on the manual control attached to the pergola post
for 5 seconds.
After this has been completed, press the up button on the remote. The indicator
light on the manual control unit will flash 3 times if pairing is successful.
Please note: The up button on the remote MUST be pressed within 15 seconds of
the lamp button being pressed on the manual control unit.
Remote Disconnection
Press and hold the lamp button on the manual control attached to the pergola post
for 5 seconds.
After this has been completed, press the down button on the remote. The indicator
light on the manual control unit will flash 3 times if the disconnection is successful.
Please note: The down button on the remote MUST be pressed within 15 seconds of
the lamp button being pressed on the manual control unit.
DISASSEMBLY
If you want to disassemble the pergola, please follow the following process.
Attention! Safety hints and instructions have to be followed for disassembly as well.
www.louvrelounge.co.nz | 22
STORAGE
If your Louvre Lounge won't be used for a longer period
of time, we recommend removing the pergola from the
brackets and storing it away.
DISPOSAL
Do not dispose of this Pergola with other household
waste.
www.louvrelounge.co.nz | 23