You are on page 1of 4

Slow Steaming - a Challenge for Model Basins

Hamburg SMM 2014

Green shipping, ECO ships, slow reliable data. Especially with fat hulls, Slow steaming is the headline now,
steaming, EEDI are the actual full-ended ships and slow speeds, the but SVA Potsdam is also a partner in
keywords for the shipbuilding measurement of force and momentum the field of propeller design for
industry. The development and has to be sufficiently more accurate submerged ships or high speed craft.
analysis of ship hull forms, propulsors than before. Optimisation of hull lines using CFD
and appendages for ships with a lower could reduce EFD-costs and makes
design speed than in the past is one of SVA Potsdam took this into account the ships even better.
the main fields of operation of and invested a lot in test facilities to
Potsdam Model Basin (SVA improve all our equipment. A wide With the invention of new production
Potsdam). Ship-owners are searching variety of Z-drives, pods, rudder techniques, i.e. water cutting of timber
for small percentages to increase the propellers on stock is available and to generate the hull form of our
efficiency of propulsion systems and with our design team, new samples models as fast as possible, our new 5-
ship hulls. This is a wide market for can be manufactured within a short axis-milling machine for wood and
the whole supply industry as well as time. plastic, new machining centers for
for the yards. Not only new ships are manufacturing some of the world’s
under pressure of fulfilling the EEDI Nevertheless, the power prediction by best model propellers and a highly
or EEOI requirements, also existing using EFD is not the only field of skilled staff the SVA Potsdam is
ships have to be redesigned to meet operation of SVA Potsdam. Several continuously moving forward. The
the environmental and economic research projects are in progress, SVA Potsdam assures best quality for
objectives. including acoustics and modern all model tests – Always at your
propellers like tip rake props and service.
There are a lot of useful methods and submerged water jets. But also simple
devices to achieve these objectives. changes in the operation of ships can The Potsdam Model Basin would like
The redesign of ducts, bulbous bows, save fuel, f. e. trim variation. to invite and discuss with you at the
propellers, rudders and much more SMM 2014 in exhibition hall B4,
could help to reduce the fuel ground floor, place 302.
consumption significantly. SVA
Potsdam sees as its obligation to make
a positive contribution to the
environment. To make sure that an
investment gives a future profit, the
percentage of efficiency must be
detected to a very high degree of
accuracy, because gains and losses are
in a range of a few percent down to
perhaps tenth of a percent for a single
energy saving device (ESD).
Experimental Fluid Dynamics (EFD)
have to deal with these little changes
of resistance and propulsion
efficiency. Measurements and the
accuracy of prediction must be much
more precise than in the past to
provide our customers with highly
SVA items No. 14 1
Improvement of the efficiency of shipping is an important challenge of SVA’s work
Heinke, H.-J.; Steinwand, M.; Lübke. L.

The reduction of the power demand dations for numerical calculations


for the transportation of goods by of rudders in the propeller slip
ship and the minimising of stream and for the design of rudder
maritime emissions is a preferential bulbs were given. The results of
task for the design of ships and this R&D-project and systematic
propulsion systems as well as for model tests are the basis for the
the ship operation. The design of propulsion bulbs in the
optimisation of the ship hull, SVA.
propeller and rudder and the use of
energy saving devices is more than
Simulation of the ship with propeller and rudder
in the past a part of the
development of new ships and the
optimisation of existing ships A procedure for the optimisation of
(retrofitting). For this challenging ship hulls, with respect to the
task the ship model basin Potsdam reduction of the propeller induced
(SVA) is an ideal partner, having a pressure pulses and the required
long and successful history in the power, was developed and tested in
field of maritime hydrodynamics the R&D-project “Form
and being able to offer first class optimisation under consideration of
Streamlines emerging from hub and rudder
engineering services to find the the wake field characteristic”. The
optimal solution for the benefit of The design and application of semi- project was executed in cooperation
our customers for a sustainable and balanced rudders were investigated with Aker Yards Germany (now
profitable business. in the R&D-projects “High NORDIC Yards) and
efficient semi-balanced rudder for FRIENDSHIP-Systems. The ship
In order to offer our customers this container feeder ships” and hull was described by means of a
services, a key issue is to carry out “Numerical and experimental parametric model within the
intensive and continuous research investigations of the effective FRIENDSHIP-Framework, allow-
and development work, which is a rudder inflow at manoeuvring”. ing the generation of a variety of
requirement for innovative The goal of these projects was the different hull forms in a short
solutions and vital for an effective improvement of the rudder design amount of time automatically. On
cooperation within the shipbuilding with respect to the safety, basis of the parametric geometry
and shipping industry. That’s why efficiency and quality of the ship. the numerical meshes were
the SVA Potsdam worked in the Extensive measurements in model generated, employing structured
last years at different R&D-projects and also in full-scale measurements and unstructured mesh topologies.
with the focus on ship – propeller – as well as computer simulations of The numerical calculations were
rudder interaction for improving the ship with propeller and rudder carried out with the program
the propulsion efficiency. The SVA were carried out. On basis of these ANSYS CFX. As objective
is disposing over a variety of obtained results recommendations function during a multi-objective
testing facilities and large for the rudder design had been optimisation the required power
computational resources and is developed in cooperation with the and the homogeneity of the wake
looking forward to share this German Lloyd (GL). field were optimized. In course of
experience with our customers to the project the knowledge and
find in a joint effort the optimal procedures to conduct all sorts of
solutions for the requested tasks. In optimizations were successfully
the following a brief overview is established and verified in a variety
given. of projects ever since.

The design of rudder bulbs as a


very effective way to increase the
propulsion efficiency of the ship
was investigated in the R&D
project “Design of rudder bulbs
using CFD”. Different parameters
of rudder bulbs were modified and
its influence on propulsion were Ship form optimisation, showing the wave
Full-scale measurements, ship with semi- pattern for the initial design at the top and the
calculated and tested. Recommen- balanced rudder optimised design at the bottom

2 SVA items No. 14


The improvement of the propeller in front of the rudder as well as hull - Twisted rudder up to 1.4%
inflow using a wake equalising duct vortex cavitation inception tests. - Costa propulsion bulb at twisted
(WED) or Vortex Generator Fins rudder up to 3.7%
(VG) was the key aspect of the - Costa propulsion bulb at conven-
R&D-project “Increasing of the tional rudder up to 2.5%
design and prognosis reliability for - Boss cap fin up to 3.2%
ships with wake field influencing - Propeller redesign up to 10%
devices”.
On the basis of the mentioned R&D
project over 50 optimisations of the
efficiency for customers could
performed in the last 2 years.

Ship model with Schneekluth nozzle Influence of a conical boss cap on hub vortex
cavitation and the velocity field
Questions regarding Reynolds
number effects on the inflow to the
propeller, the correlation of the
model tests with the trials and the
design of the propeller in Systematic variation of boss caps, rudder bulbs
interaction with wake field and rudder-propeller distances
influencing devices were
investigated in this project. Model Mecklenburger Metallguss
tests in the towing tank, cavitation developed in the joint research
tunnel and the large circulating and project BossCEff a new energy
cavitation tunnel of the Technical saving cap – MMG ESCAP®. This
University of Berlin were carried boss cap fin focuses on the
out to validate and to assess the improvement of the propeller
accuracy of the calculations. performance in case of a propeller
retrofit or for existing propellers.
The joint research project BossCEff But also for new designed
- “Increase of the propulsion propellers the ESCAP® can be
Influence of a divergent boss cap on hub vortex
efficiency and reduction of the hub cavitation and the velocity field
applied.
vortex cavitation by an improved
consideration of the interaction Special propeller boss caps for the
between propeller jet and boss cap” use of rudders with propulsion
was finished in 2013. The main bulbs and boss caps with fins were
focus of the project BossCEff was developed in cooperation with the
the increase of the propulsion project partners Technische
efficiency and the reduction of the Universität Hamburg-Harburg, In-
hub vortex cavitation by an stitut für Fluiddynamik & Schiffs-
improved adaptation between theorie (FDS) and Mecklenburger
propeller geometry, boss cap and Metallguss (MMG). The Propeller with ESCAP®, designed and
manufactured by MMG
rudder. Extensive model tests were improvement of the propulsion
carried out and analysed for the efficiency due to the integrated The research and development
development and enlargement of design of the propeller, boss cap projects are sponsored by German
the numerical methods and their and rudder were verified in model Federal Ministry of Economics and
validation. The model tests tests and in the full-scale Technology under the project
included propulsion tests with measurements for different ships. executing management of
measurement of the forces and
EuroNorm and PTJ. The SVA
moments at the propeller, boss cap The following maximum would like to express its gratitude
and rudder separate, velocity mea- propulsion improvements could be to the Ministry and the project
surements behind the boss caps and verified in the R&D-project: management for the support of the
research projects.
SVA items No. 14 3
Investing in the Future – Water as an Energy Source New Managing Director

The Potsdam Model Basin is also dation of design and optimisation


involved in different research projects tools of turbine rotors as well as in the
regarding innovative energy sources. formulation of basics for procedure
and analysis of experimental
The aim of the joint R&D project investigations. These rotors in
“Experimental and theoretical different versions can be used for
investigations for hydrodynamic design central power generation.
of a wave energy converter” is the
development, optimisation and testing
of a wave converter in closed Dr. Christian Masilge
cooperation with the University studied naval architecture at the
Rostock and the firm ENERLYT. Technical University in Berlin.
After his diploma about cavitation
erosion of oscillating foil sections
he continued to write his doctor
thesis on the subject of waterjet
design. He started his business
career as chief designer and yard
manager in a former GDR-ship-
yard in Berlin. After some years in
Laboratory model in sea way the industry he opened his own de-
In the scope of the R&D-project sign office and designed around 60
ships, mostly small craft and pas-
“Mathematical and experimental
senger vessels for coastal and in-
modelling of turbine rotors” the focus
lies in the further development and vali-
Test set-up for turbine rotors shore service. Since 2003 he has a
lectureship at the Technical Uni-
versity of Berlin for Yacht Design
Announcement and since 2011 additionally for
Inshore Ship Design. Since March
2014 he joined the team of SVA
Reception - 10 years SVAtech GmbH Potsdam as Managing Director.
“Services for the shipbuilding and supplying industry”
He is married and father of two
children. As an experienced sailor
7th SVA - R&D Forum he took part in ocean races in the
„Theoria cum praxi“ past. Nowadays he preferred to sail
his wooden one-ton yacht on the
29th January 2015 lakes of Berlin.
Impressum
SVAtech GmbH SVA items No. 13
Schiffbau-Versuchsanstalt Potsdam GmbH Unternehmensgruppe SVA Potsdam
Schiffbau-Versuchsanstalt Potsdam
GmbH
SVAtech GmbH
Marquardter Chaussee 100
10 years SVAtech GmbH D-14469 Potsdam
The SVAtech GmbH, a subsidiary All facilities and members of staff of
company of SVA, was established at the the Potsdam Model Basin are Phone + 49 331 56712-0
end of 2004. available to the SVAtech GmbH. Fax + 49 331 56712-49
Email: info@sva-potsdam.de
svatech@sva-potsdam.de
The aim of this foundation was to meet Contact: heinkec@sva-potsdam.de
Web: www.sva-potsdam.de
the growing demands of the industry
regarding complex engineering tasks. Layout and Satz:
SVA Potsdam GmbH
SVAtech GmbH
META Systems GmbH

4 SVA items No.14

You might also like