Professional Documents
Culture Documents
KANAYA MR LEE
Model All Model Process Control
Process Description Thickness Checking
EQUIPMENT
1 . X-TRAY MACHINE
2. Survey meter
INSPECTION SPECIFICATION
1. Spec thickness Zn 5 - 10 um
SAFETY PRECAUTION
1 . Wear protective equipment such as hand gloves
2. Instantly wash with water and soap
REMARK
1 . Immediately report to line leader if the process
condition is not within the specification for further
Positioning checking point on X-RAY Adjust position of part on sencor X-RAY and focus . action
Ensure picture on screen