You are on page 1of 2

Project II

NPR
1 Average annual construction Turnover 16790000000
2 Project Experience Value
3 Single Project value 17900000000
4 OR 2 project of each value
Project 1 14920000000
Project 2 5600000000
5 Bid Capacity 22380000000

Prime Constractor or Mangement Contractor or Sub-Contractor of-


6
Double lane dual Carriageway Highway or expressway of minimum 4 lane and 5 km in length

Prime Constractor or Mangement Contractor or Sub-Contractor of-


7 EPC/Turnkey/Design & Build/ Design, Build & Operate of 5 No. of double lane bridge with 1 of 350m &
100m length and peir height of _> 45m.

8 Prime Constractor or Mangement Contractor or Sub-Contractor of-


One Highway/Expressway with design and build of an Interchange and Toll Plaza

9 Highway/Expressway Works:
a) Completed at least 21,000 Cum of Asphalt concrete or Desnse Bituminous Macadam Work
b) Completed at least 13,000 Cum of RCC Concrete Grade _>M20 for road structures.
INR INR CRORE
10,577,700,000.00 1,057.77
0.00 0.00
11,277,000,000.00 1,127.70

9,399,600,000.00 939.96
3,528,000,000.00 352.80
14,099,400,000.00 1,409.94

ontractor of-
of minimum 4 lane and 5 km in length

ontractor of-
of 5 No. of double lane bridge with 1 of 350m & 4 of

ontractor of-
nterchange and Toll Plaza

or Desnse Bituminous Macadam Work


ade _>M20 for road structures.