TABLE OF CONTENTS

1 INSTRUCTIONS ON HOW TO USE THE GUIDE .......................................... 5


2 GENERAL FEATURES AND SPECIFICATIONS ........................................... 6
2.1 GENERAL FEATURES ........................................................................ 6
2.2 IDENTIFICATION OF THE APPLIANCE ............................................. 8
2.3 TECHNICAL SPECIFICATIONS .......................................................... 9
3 TRANSPORTATION AND POSITIONING THE APPLIANCE ...................... 10
3.1 INSTRUCTIONS FOR PREVENTING INJURIES .............................. 10
3.2 UNLOADING THE APPLIANCE FROM THE LORRY........................ 11
3.3 UNPACKING OF THE APPLIANCE................................................... 12
3.4 PLACEING THE APPLIANCE ............................................................ 12
4 REQUIREMENTS AND CONDITIONS FOR NORMAL OPERATION OF THE
APPLIANCE......................................................................................................... 13
4.1 ENVIRONMENTAL CONDITIONS ..................................................... 13
4.2 WATER SUPPLY REQUIREMENTS ................................................. 13
4.3 ELECTRICITY SUPPLY REQUIREMENTS ....................................... 14
5 CONECTING THE APPLIANCE ................................................................... 15
5.1 INSTRUCTIONS FOR PREVENTING OF INJURIES ........................ 15
5.2 CONNECTING THE APPLIANCE TO THE WATER SUPPLY ........... 15
5.3 CONNECTING THE APPLIANCE TO THE POWER SUPPLY .......... 16
6 OPERATING THE APPLIANCE ................................................................... 17
7 CONTROL BOARD ...................................................................................... 18
7.1 KEYS WITH LIGHT INDICATORS ..................................................... 18
7.2 DISPLAY WITH KEYS AND LIGHT INDICATORS ............................ 19
7.3 UP and DOWN keys .......................................................................... 20
7.4 DISPLAY ............................................................................................ 20
8 ICE-CREAM MIXTURE PREPARATION ...................................................... 23
8.1 SETTING THE MIXTURE TREATING TEMPERATURE ................... 23
8.2 MIXTURE TREATING AT THE PRESETED TEMPERATURE .......... 23
9 PROTECTION OF THE APPLIANCE AND USER ....................................... 24
9.1 PROTECTION OF THE USER........................................................... 24
9.2 ELECTRICAL OVERLOAD PROTECTION........................................ 24
9.3 THERMIC SAFETY DEVICES ........................................................... 24
9.4 PROTECTION OF THE COOLING SYSTEM .................................... 24
10 USE OF THE APPLIANCE ........................................................................... 24
10.1 GUIDELINES FOR THE PREVENTION OF INJURIES ..................... 25
10.2 BASIC RULES FOR OPERATING THE APPLIANCE........................ 25
10.3 PRODUCTION BASIN COVER LID ................................................... 27
10.4 OUTLET PIPE .................................................................................... 28
10.5 BEFORE APPLIANCE USAGE .......................................................... 28
10.6 SMALL AMMOUNTS OF ICE-CREAM MIXTURE ............................. 29
10.7 MIXTURE TREATING AT THE PRESETED TEMPERATURE .......... 29
10.8 MIXING .............................................................................................. 30
10.9 OUTLET OF ICE-CREAM MIXTURE ................................................. 30
11 CLEANING ................................................................................................... 30
11.1 GUIDELINES FOR THE PREVENTION OF INJURIES ..................... 30
11.2 CLEANING THE SURFACES ............................................................ 31
11.3 WATER PIPES USAGE FOR CLEANING PURPOSES .................... 32
11.4 CLEANING OF PARTS THAT COME IN CONTACT WITH THE ICE
CREAM ......................................................................................................... 32
11.5 PRODUCTION BASIN DISINFECTION ............................................. 39

Downloaded from www.Manualslib.com manuals search engine


12 MAINTENANCE OF THE APPLIANCE ........................................................ 39
12.1 INSTRUCTIONS FOR PREVENTION OF INJURIES ........................ 39
12.2 PROBLEMS, ERRORS AND TROUBLESHOOTING ........................ 39
12.3 REGULAR MAINTENANCE INSPECTION PLAN.............................. 40
12.4 TESTING START UP ......................................................................... 41
12.5 REGULATION OF THE WATER FEED VALVE ................................. 41
12.6 ENVIRONMENT TEMPERATURES BELOW 0°C ............................. 41
12.7 ORDERING SPARE PARTS .............................................................. 43

Downloaded from www.Manualslib.com manuals search engine


1 INSTRUCTIONS ON HOW TO USE THE GUIDE
Since we are in the company VALMAR aware that it is in yours as well as in our
interest that the machine would operate at its best and as cheap as possible we
have prepared this instruction manual, in order to assist you with your machine.
The instruction manual must be stored near the machine, so you will be able to
access it when needed.

Only authorized persons (operators), who know how to operate the appliance, are
allowed to handle and operate it. Operators must read and study the manual
carefully and they must follow the instructions.
The company VALMAR can’t be held responsible for any kind of damage or
injuries occurred due to non-consideration of the instruction manual.

Further to these instructions, all applicable environmental legislation and


regulations regarding safety at work must be taken into consideration.
Handling the appliance required carefulness, which is expressed in the manual
with symbols.

SYMBOLS USED IN THE GUIDE

This symbol represents important content in the manual. You should study the text
accompanied with this symbol carefully. Disregard of instructions and warning
symbols may lead to serious personal injury and damage to the appliance.

This symbol represents explicit prohibition of specific actions or operations. When


you see this symbol, special attention should be paid to what it refers.


This symbol calls your attention to the importance of the text as regards proper
handling of the appliance, but without danger of personal injury.

 This symbol means that the content of the text is of a technical nature and is
related to technical specifications.

 This symbol is an instruction to proceed with caution while engaging in a specific


operation referred to in the text.

This symbol means that the action to which it refers may also be carried out by
persons skilled in the operation of the appliance.

This symbol is a warning that any action or operation referred to in the text must
be carried out only by authorized servicing personnel.

Downloaded from www.Manualslib.com manuals search engine


2 GENERAL FEATURES AND SPECIFICATIONS

2.1 GENERAL FEATURES

The appliance is designed exclusively for the ice cream production and the
processing of fresh ice cream. The appliance can’t be used for the
pasteurization of crude milk, but only for pasteurization of ice cream mass.
Ice-cream mass should contain already pasteurized milk. The manufacturing
company VALMAR cannot be held liable in any way for personal injuries or
damage caused to the appliance in cases when the appliance has been used for
any other purposes than those specified.

The appliance consists of:

 main construction
 side panels and top cover
 mixture producing cylinder with mixer
 electrical assembly
 hydraulic assembly (water)
 hydraulic assembly (glycol)
 cooling assembly

It is forbidden to reassemble, alter or in any way modify the appliance or any part
of the appliance without an express permission of the manufacturer.

This appliance is designed in compliance with the following European directives:

 CE 98/37 and updates,


 CEE 73/23 and updates,
 CEE 89/336 and updates,
 CEE 89/109 and updates,

and following standards:

 EN 292
 EN 294
 EN 60204

This appliance is fully compliant with all legal standards of health and operational
safety. The level of operating noise does not exceed 70 dB. Cooling is carried out
with the use of ecological gas R507 and water condenser with the possibility of
mounting air condenser.

With the intention to provide our customers with a well-tested appliance, ready for
normal operation, the initial start-up is always carried out at the factory by the
manufacturer before the product is packed and shipped to our client.
Additional start-up and appliance's adjustments can be made on the client's
premises by technicians authorized by VALMAR.
The price of the appliance does not include the initial start-up on the client's
premises.

Downloaded from www.Manualslib.com manuals search engine


Set the appliance in a suitable place, block it to ensure stability, and connect to the
water and power supplies. Blocked and connected appliance is ready for
operation.

The warranty does not include replacements or repairs of malfunctions


caused by incorrect connection of the appliance.

The quality and the quantity of the ice cream depend on:

 temperature of the cooling water


 temperature of air
 final temperature of the ice cream
 quantity and quality of the ice cream mixture

Put the ingredients into the mixture production cylinder, close the lid and press
START button. The appliance will produce the needed mixture based on selected
program (P.1 ~ P.21).

Appliance operations:

 simultaneous mixing and heating of the mixture until the pre-selected


temperature (max 115°C),
 simultaneous mixing and cooling of the mixture to 4°C and maintaining the
produced mass at a temperature of 4~5°C;
 possible mixing modes in production cylinder:

 constant,
 impulsive,
 fast,
 slow.

The warranty does not include replacements or repairs of malfunctions


caused by incorrect use of the appliance.

Downloaded from www.Manualslib.com manuals search engine


2.2 IDENTIFICATION OF THE APPLIANCE

Every appliance has its own identification label, which is fixed on the backside of
 the appliance.

The ID label contains the essential technical specifications of the appliance:

 manufacturer
 manufacturers address
 model
 serial number
 power supply voltage
 nominal frequency
 maximum current
 cooling gas type
 cooling gas weight
 power
 year of production

The ID label must not be removed or damaged.

Downloaded from www.Manualslib.com manuals search engine


2.3 TECHNICAL SPECIFICATIONS

The appliances essential technical specifications:

 

power supply voltage (see appliance label)
maximum current (see appliance label)
 power (see appliance label)
 nominal frequency (see appliance label)
 water consumption
 production capacity
 capacity of the pot
 weight
 dimensions

All technical specifications, such as the weight, dimensions and power of the
appliance are not mandatory for the manufacturer and may change.

MODEL WATER FLOW


WEIGHT DIMENSION POWER SINGLE QUANTITY VOLUME/CYCLE
SWEETY Aprox.

Kg A B C KW * l/cycle Min kg Max kg


60 QUICK 155 350 950 1030 7,2 191 20 60
130 QUICK 206 520 950 1030 12,3 370 30 130
60 QUICK - i 155 350 950 1030 3 191 20 60
60 QUICK - i 160 350 950 1030 7,2 191 20 60
130 QUICK - i 216 520 950 1030 12,3 370 30 130
180 QUICK - i 255 650 950 1030 12,3 530 50 175

All performance data is based on standard ice cream mixture production. When producing
mixtures, which include ingredients or additives that increase in volume during heating
and/or cooking, the maximum mixture quantity must be reduced in accordance with the
recipe.

* The water consumption depends on:

 the incoming water temperature


 the ice cream mixture type
 the ice cream mixture quantity
 the ice cream mixture temperature
 the required final ice cream temperature

Downloaded from www.Manualslib.com manuals search engine


3 TRANSPORTATION AND POSITIONING THE
APPLIANCE
3.1 INSTRUCTIONS FOR PREVENTING INJURIES

Pay due attention to legally required safety measures.

At work wear suitable clothing. Do not wear ties, jeweller’s chains or belts, which
could get caught in the machine.

Do not shift or dislocate the safety switches or protective parts.

Make sure that the lifting device is in good condition and that its load capacity
exceeds the weight of the appliance (refer to the technical specifications data
sheet).

Lift the appliance following the instructions for its use and maintenance. Pay
 attention to the handling and handgrip locations. The use of a suitable lifting
device is recommended.

While lifting or moving the appliance do not stand under the machine.

Do not turn the appliance after holding the cables or the water hose has lifted it.

If you have to attend to any work higher up above the appliance, you should use a
suitable ladder and not the appliance for support.

10

Downloaded from www.Manualslib.com manuals search engine


3.2 UNLOADING THE APPLIANCE FROM THE LORRY

Required devices are a hand lift for pallets and a forklift truck with load capacity of
at least 1,200 kg.

Lift the crate containing the appliance using the hydraulic palette lift and move it as
close to the open side of the lorry as possible.

 Remove the hand lift from underneath and handle the crate with the forklift truck.
Make sure that the weight is focused on the holding points.

Remove the crate from the lorry with the forklift truck in reverse gear as soon as
the crate is moved out of the lorry, and lower the crate to the minimal height of
around 30 cm.

Slowly and carefully place the box containing the appliance in its place. To move
the appliance around on the premises use wheels, which are supplied with the
appliance.
.

11

Downloaded from www.Manualslib.com manuals search engine


3.3 UNPACKING OF THE APPLIANCE

Upon the delivery of the appliance check if the crate was not damaged during
transportation.
The appliance is fixed to the pallet with two screws. The side covers should be
removed and the screws detached.
 When the machine is unpacked, make sure that the packaging is disposed in a
suitable manner and in compliance with standards on environmental safety.

3.4 PLACEING THE APPLIANCE

Place the machine on a level solid surface with an adequate strength of at least
600 kg per m² for the weight of the machine, and position the appliance at least 60
cm away from the wall or other objects. Leave enough space in front of the

 appliance to ensure comfortable access and work with the appliance.


While placing the appliance in position, block the front wheels (by pressing the
brake), which will ensure that the appliance will not be able to move.

12

Downloaded from www.Manualslib.com manuals search engine


4 REQUIREMENTS AND CONDITIONS FOR NORMAL
OPERATION OF THE APPLIANCE
Before connecting the appliance to electricity supply, the operator must make sure
that environment requirements have been met: the temperature and humidity of
the air must be appropriate and the water supply and electricity networks comply
with all requirements for normal operation of the appliance.
When the characteristics of either the water supply or electricity network fail to
meet the requirements for normal operation, the machine must not be connected
to power supply.

4.1 ENVIRONMENTAL CONDITIONS

Prior to connecting the appliance, the temperature and the humidity of the
environment, in which the appliance will be operated, must be assessed and
checked.

min. max.
AIR TEMPERATURE 10°C 43°C
AIR HUMIDITY 0% 85%

If room temperature drops under 0 ºC (273K), water must be released from the
condenser.

4.2 WATER SUPPLY REQUIREMENTS

Prior to connecting the appliance to the power source, the temperature, pressure
and water flow from the water supply network must be checked.

Permitted water temperature and water pressure from the water supply network:

min. max.
WATER TEMPERATURE 5°C 30°C
WATER PRESSURE 100kPa (1bar) 800kPa (8bar)
WATER FLOW 750l/h

Water supply must be checked for all conditions that are required for alimentary
use.

Low water pressure causes the cooling system to function improperly. The cooling
gas does not condense, thus causing the compressor to overload. In such cases,
the safety pressure valve kicks in and switches off the compressor.
The results of mixture treating and ice cream production when the water pressure
is too low are not as good as when the water pressure is normal.

The maximum presence of chlorides in water is 120 ppm. Exchangers are not
suitable for the use of salt water.

13

Downloaded from www.Manualslib.com manuals search engine


4.3 ELECTRICITY SUPPLY REQUIREMENTS

Prior to connecting the appliance to the power source, the voltage and the
maximum power current allowed in the network must be checked and the
appliance must be protected externally with FUSES and the MAIN SWITCH.

Permitted voltage of three-phase appliances (400/50/3):


nominal voltage min. voltage max. voltage
400V 380V (400V–5%) 420V (400V+5%)

Permitted voltage of monophase appliances (230/50/1):


nominal voltage min. voltage max. voltage
230V 220V (230V–5%) 240V (230V+5%)

The diameter of each phase conductor must be of an appropriate dimension


(corresponding to the power of the fuses).
The MAIN SWITCH must be installed in the immediate vicinity of the appliance,
where it must be easily visible, accessible to the operator and appropriately
marked.
Magnetothermic differential FUSES (slot ≥ 3 mm) of appropriate dimensions must
be installed between the electricity network and the MAIN SWITCH.

model max. current fuse type


SWEETY 60 QUICK (400/50/3) 16 A SLOW
SWEETY 130 QUICK (400/50/3) 25 A SLOW
SWEETY 60 QUICK – I (230/50/1) 16 A SLOW
SWEETY 60 QUICK – I (400/50/3) 16 A SLOW
SWEETY 130 QUICK – I (400/50/3) 25 A SLOW
SWEETY 180 QUICK – I (400/50/3) 32 A SLOW

The position of the MAIN SWITCH with the FUSES in the power circuit scheme of
the appliance:

MONO-PHASE THREE-PHASE

14

Downloaded from www.Manualslib.com manuals search engine


5 CONECTING THE APPLIANCE
5.1 INSTRUCTIONS FOR PREVENTING OF INJURIES

When the characteristics of either the water supply or electricity network fail to
meet the requirements for normal operation, the machine must not be connected
to the power supply.
It is forbidden to connect the appliance to the power source when the floor around
the appliance is wet.
It is forbidden to connect the appliance to the power source if any of the side
panels and the cover is missing.

5.2 CONNECTING THE APPLIANCE TO THE WATER SUPPLY

The water supply valve is connected to the WATER SUPPLY PORT. The water
 outlet pipe is connected to the WATER OUTLET PORT. All mentioned water
connections have a diameter of 3/4".
To connect the appliance to the water supply (water supply port) and the outlet to
the drain (water outlet port), use pipes capable of withstanding 1MPa and
measuring at least ½” in diameter (make sure upon the delivery that the pipes are
supplied with the appliance).

SWEETY QUICK /-i 60 SWEETY QUICK/-i 130

WATER SUPPLY WATER INLET WATER SUPPLY WATER INLET


(drinkable water) (condenser) (drinkable water) (condenser)

WATER OUTLET (condenser) WATER OUTLET (condenser)


(kondenzator) (kondenzator)
SWEETY QUICK/-i 180

WATER SUPPLY WATER INLET


(drinkable water) WATER OUTLET (condenser) (condenser)
(kondenzator)

15

Downloaded from www.Manualslib.com manuals search engine


If the appliance is meant to be used in areas with two separate water supplies, two
separate water connectors are built in it, one for each: a DRINKING WATER
SUPPLY PORT and a COOLING WATER SUPPLY PORT (condenser).
The valve belonging to the cooling water supply must not be connected to the
DRINKING WATER SUPPLY PORT.
The valve belonging to the drinking water supply may be connected to the
COOLING WATER SUPPLY PORT and/or to the DRINKING WATER SUPPLY
PORT.
The valve should be opened after the appliance has been connected to the water
supply system.

5.3 CONNECTING THE APPLIANCE TO THE POWER SUPPLY

Only appropriately trained technicians are allowed to connect the appliance to the
electrical current. They must follow installation instructions and observe the
occupational safety regulations applying in the country in which the appliance is
being installed. They must read the instructions carefully and above all thoroughly
familiarize themselves with the sections on REQUIREMENTS AND CONDITIONS
FOR NORMAL OPERATION OF THE APPLIANCE and the machine’s electrical
circuit scheme.
Before connecting the appliance, all attachments that might have become loose
during transportation must be checked. Attachments that may have become loose
or disconnected must be screwed back on and tightened.

Connecting instructions for five-vein cable (three-phase appliances – 400/50/3):

phase type color


L1 400 V ~ black
L2 400 V ~ brown
L3 400 V ~ grey
N neutral blue
PE ground yellow-green

Connecting instructions for four-vein cable

Phase Type Colour


L1 220 V ~ black
L2 220 V ~ brown
L3 220 V ~ grey
PE ground yellow-green

A test start-up of the appliance is carried out by an appropriately trained electrician


who has also connected the machine so as to make sure that it is properly
connected (see the section on MAINTENANCE).
If the appliance is correctly connected to the mains the mixer in the
production cylinder should be turning in counter clockwise direction.

16

Downloaded from www.Manualslib.com manuals search engine


Should the mixer is turning in clockwise direction, it is necessary to change the
connecting position of any of the two phases.
Production cylinder mixer, installed in appliances with built-in inverter, will rotate in
the counter clockwise direction regardless of the connecting position of either of
the phases.
After connecting the appliance to the electricity network, appropriately trained
electrician must also control the power consumption. The current must not exceed
the maximum allowed on the identification plate or sticker (see the section
GENERAL FEATURES AND SPECIFICATIONS).
Appliance with more than 2kW power should have fixed electrical connection.
Fuses can’t exceed manufacturer prescripted fuse power! (possible cause of fire)!

6 OPERATING THE APPLIANCE


The user operates the appliance standing in front of appliance. This position
allows user to handle the control panel, the safety switch and the water flow
regulation valve (shower).
The appliance must be always under users control during operation.

CONTROL
PANNEL

SAFETY
SWITCH

The control panel is used to display the status or the operation phase the machine
is in, to perform settings and to show messages and errors while producing ice
cream.
The safety switch is used to safely and securely switch of the electronics. The
electronics is switched off by pressing down the switch-off key in the normal
position and then depressing it. The switch will normally remain down and must be
pulled back up by hand to return to its normal position.
The shower is used for cleaning of the appliance.

17

Downloaded from www.Manualslib.com manuals search engine


7 CONTROL BOARD
The control board consists of a display with keys and keys with light indicators.
 The display with keys and light indicators serves to display the status or operation
phase of the appliance, various messages and error messages during mixture
treating and for setting processing parameters for the ice cream mixture.
Keys with light indicators are used to start or terminate various functions. Pressing
such a key will activate a designated function and the indicator above the key will
light up.

7.1 KEYS WITH LIGHT INDICATORS

7.1.1 OUTLET VALVE WASHING key

Pressing this key for half a second, during any phase or operation,
will activate water flowing through to clean the valve. Water is
discharged when key is pressed.

7.1.2 CYLINDER WASHING key

Pressing this key will activate water discharge into cylinder if the
appliance is in STOP state or during heating phase. This is not
possible during cooling or temperature maintenance phase.
If washing is possible and the key is pressed twice within 2 seconds,
water inflow lasts for 3 minutes.
The operation may be terminated by pressing the same key again or
by pressing the STOP / RESET key.

7.1.3 MANUAL MIXTURE TREATING key

Pressing this key will activate the mixture treating with manually
selected temperature. The ice cream mixture is mixed and heated up
to the manually selected treating temperature between 65°C and
85°C, entered in the SET phase. As soon as the heating phase is
completed the appliance enters cooking phase. When cooking time
expires the appliance enters cooling phase.
The mixture is cooled down to 4°C and subsequently automatically
maintained at the temperature 4-5°C until is used.

18

Downloaded from www.Manualslib.com manuals search engine


7.1.4 COOLING AND MAINTAINING key

Pressing this key will activate the ice cream mixture cooling and
maintaining. Ice cream mixture is cooled down to 4°C and then
automatically maintained at the temperature 4-5°C until is used.

7.1.5 MIXING key

Pressing this key will activate the mixer if the appliance stands still. If
the appliance is in the cooling or heating phase, pressing this key
sets the rotation speed of the mixer.
Light indicators display the selected mixing speed; when both
indicators are on, speed is set automatically as required in individual
processing phases.

7.1.6 AUTOMATIC MIXTURE TREATING key

Pressing this key will activate the mixture treating with preseted
temperature. The ice cream mixture is mixed and heated up to the
preseted treating temperature of 85°C. As soon as the heating phase
is completed the appliance enters cooling phase.
The mixture is cooled down to 4°C and subsequently automatically
maintained at the temperature 4-5°C until is used.

7.1.7 STOP / RESET key

Pressing this key will stop the operation of the appliance, regardless
of the current phase. OFF is displayed on the display. After this, any
key may be used.

7.2 DISPLAY WITH KEYS AND LIGHT INDICATORS

7.2.1 HEATING PHASE

When this indicator is lit, appliance is in the heating phase.

7.2.2 MANUAL MIXTURE TREATING

When this indicator is lit, appliance is in the cooking phase during


mixture treating with manually selected temperature.

7.2.3 COOLING PHASE

When this indicator is lit, appliance is in the mixture-maintaining


phase.
When this indicator is blinking, appliance is in the cooling phase.

19

Downloaded from www.Manualslib.com manuals search engine


7.2.4 MIXING PHASE

This light signal is lighted on if the slow hand-selected mix is chosen.

This light signal is lighted on if the fast hand-selected mix is chosen.

The user can change the mixing speed during the mixing cycle by pressing
MIXING MODE key and chose between slow, fast or automatic speed.
If automatic mode is selected, both light signals are switched on (snail and rabbit).

7.3 UP and DOWN keys

UP key

Pressing UP key:

 will stop beeping at the end of the phase;


 will stop error beeping;
 until the UP key is pressed the display shows the glycol
temperature;
 if the appliance is in STOP position, the simultaneous pressing of
the UP and COOLING AND CONSERVATION keys activates
glycol pump and the display shows Pum.

DOWN key

Pressing DOWN key:

 until the DOWN key is pressed, if the appliance is not in mixing


phase, the display shows the mixtures temperature in the pot ;
 if the appliance is in mixing phase, pressing DOWN key will
display the mixtures temperature in the pot until next pressing of
the key.

7.4 DISPLAY

7.4.1 Messages

Appliance in STOP mode

OFF If the display shows OFF it means that the appliance is in STOP
mode.

20

Downloaded from www.Manualslib.com manuals search engine


Compressor cannot be switched on

This message means that the compressor cannot start due to


-P- pressostat guard or thermal sensors guard.

Appliance in function without displaying of temperature

Message means that the appliance is in active mode (no heating or


--- cooling) without displaying the temperature (cleaning, test-run,
mixing)

Cylinder coverlid is open

This message means that the pot cover lid is open. Due to the pot
dor
cover lid being open, the active phase and the mixing phase are
interrupted. In order to continue with the program, the cylinder door
must be closed.

Manual start-up of the glycol pump

This message means manual start-up of the glycol pump due to


PUm
simultaneous pressing of the UP and COOLING AND
CONSERVATION keys.

50Hz impulse is not reached

This message means that 50Hz impulse is not reached at start-up or


_F_ at reset.

Control panel codes and software versions

This message shows control panel codes and software versions.


Pxx

7.4.2 ERRORS

Mixer engine overheating temperature has been reached

Er1 This error message means that the temperature of the mixer engine
has reached the point of overheating. After 4 subsequent errors the
appliance enters STOP position. If the appliance was in the active
phase before overheating, the phase goes on only after temperature
drops below overheating point.
The error message clears only when the temperature has dropped
back below overheating. The error cannot be cleared by pressing
STOP / RESET.

21

Downloaded from www.Manualslib.com manuals search engine


Presostat errors

Er2 This error message means that 16 subsequent presostat errors


occurred. The appliance gives off a quick beeping sound and enters
STOP position.
The error is cleared by pressing STOP / RESET key.

Mixer engine overheating temperature has dropped below critical point

Er3 This error message means that the exceeded temperature has
already dropped below overheating.
The error is cleared by pressing STOP / RESET key.

Temperature exceeded 10°C during the conservation phase

Er4 The error message is displayed when temperature between the


conservation and maturing phases at 4- 5°C rises above 10°C. The
COOLING PHASE light indicator blinks and the appliance gives off a
quick beeping sound.
The beeping and blinking is cleared by pressing STOP / RESET key.

Mixture was not cooled within 150 minutes

The error message is a warning that mixture has not cooled down to
Er5
4°C in 150 minutes; the appliance gives off a quick beeping sound.
The beeping is cleared by pressing STOP / RESET key.

Power failure during cooling phase

Er6 The error message is displayed if the microprocessor determines


during data analysis that there was a power failure during the cooling
phase. Er6 error message is displayed and the appliance continues
operating.
The error is cleared by pressing STOP / RESET key.

Glycol pump error message

This error message is a warning that the starting state of the glycol
Er7 pump does not match the state of the differential pressure switch.
The state of the pressure switch is tested 5 seconds after the change
of the state of the pump. If the pressure indicator does not confirm
that the pump is engaged, heating or cooling phase cannot be
started.
The error is cleared by pressing STOP / RESET key.

Temperature sensor failure

Er8 This error message means that the temperature measured exceeds
allowed parameters. This may be due to terminated connection or a
short-circuit error of the PT1000 temperature sensor.

22

Downloaded from www.Manualslib.com manuals search engine


8 ICE-CREAM MIXTURE PREPARATION

8.1 SETTING THE MIXTURE TREATING TEMPERATURE

In case mixture treating with manually selected treating temperature (MANUAL


MIXTURE TREATING) is selected, the mixture treating temperature can be
manually selected between 65°C and 85°C.
Pressing MANUAL MIXTURE TREATING will activate heating of the mixture.
Pressing the SET key will show the final temperature of ice cream for 5 seconds

85

During these 5 seconds, the user may increase set temperature (by pressing UP)
or lower it (by pressing DOWN).
By pressing SET within 5 seconds since the last change of temperature, the new
temperature becomes the assigned temperature.
The cooking time at the selected treating temperature is selected automatically by
appliances microprocessor.

Symbolic display of temperature choice:

8.2 MIXTURE TREATING AT THE PRESETED TEMPERATURE

By pressing AUTOMATIC MIXTURE TREATING activate the mixture treating with


preseted temperature. The ice cream mixture is mixed and heated up to the
preseted treating temperature of 85°C. As soon as the heating phase is completed
the appliance enters cooling phase.
The mixture is cooled down to 4°C and subsequently automatically maintained at
the temperature 4-5°C until is used.

TEOR ETICAL M IXTURE TREATING CU RVE


85

)
C
°
(
E
R
U
T
A
R
E 20
P
M
E
T 6 6
4 4
0 60 120 130 140 150 160 170
TIM E (min)

23

Downloaded from www.Manualslib.com manuals search engine


Total mixture treating time must not exceed two hours and a half. If temperature
does not fall to 5°C after 150 minutes, there has been a malfunction. The ice
cream mixture is not suitable for consumption and must be discarded.
In such event, call VALMAR service personnel immediately!

9 PROTECTION OF THE APPLIANCE AND USER

9.1 PROTECTION OF THE USER

Safety micro-switches, built into the machine under the rim of the cylinder coverlid
 protect the operator against injuries that might be caused by the mixer’s rotation.
Opening the cylinder cover lid will cause the operation of the mixer engine to shut
down.

9.2 ELECTRICAL OVERLOAD PROTECTION

Electrical installations are protected with appropriate FUSES. If the FUSES


 terminate the operation of the appliance upon its start-up, the error causing this
action must be found and corrected.

9.3 THERMIC SAFETY DEVICES

The mixer engine and the compressor engine are protected with thermal sensors.
 If temperature reaches the maximum allowed value, the protection shuts down the
engine operation. In this case, press the key STOP and allow 15 - 20 minutes for
the engine to cool down. After this time, the appliance is again ready for normal
programming and operating (see the section OPERATING THE APPLIANCE).

9.4 PROTECTION OF THE COOLING SYSTEM

 The cooling system is protected with the pressostat at the maximum pressure of
2,5 MPa (25 bar) for the cooling gas R507.
In the case of water shortage, the protection shuts down the operation of the
cooling compressor.

10 USE OF THE APPLIANCE

24

Downloaded from www.Manualslib.com manuals search engine


10.1 GUIDELINES FOR THE PREVENTION OF INJURIES

Only authorized persons, who know how the machine is operated, must be
allowed to handle it. Operators must be familiar with all regulations concerning
occupational safety and fire safety measures, and they must know where fire
extinguishers are located.

Persons still in training must be constantly supervised by a designated person in


charge who knows how the machine works.

Operators must be dressed suitably (no ties, jewelers chains or belts that could get
caught in the machine) and be appropriately protected.

All warning labels on the appliance must be replaced with new ones when they
begin to fade or if they become damaged.

Before operation, the operator must make sure that the appliance is not under
maintenance, in service or in cleaning. At the end of the shift, the operator working
on the next shift or the person who will continue to operate the appliance must be
informed of the current state of the appliance.

Before every use, the operator must make sure that the floor is free of any oil
smudges or other slippery substances or objects which might cause a person to
slip or trip over.

Operators must make sure before every use of the appliance that the side panels
and the top cover of the appliance are securely fitted to the main construction and
that there are no parts or objects on the appliance or in the cylinder that could
damage the appliance during its operation.

In the event of dangerous situations (e.g. blocked mixer), which could harm the
operator’s or another person’s well being, switching off the MAIN SWITCH must
immediately shut down the appliance.

The side panels and the top cover, as well as safety devices and protective
covers, must not be taken off during the operation of the appliance.

It is forbidden to get onto the appliance and walk upon it during its operation.

During the operation, attention must be paid to any oil leaks, increased noise,
squeaking sounds or increased vibrations. In such a case, the appliance must be
immediately shut down; a visible notice board must be placed on it with
information that it is inoperable and authorized service personnel must be notified
as soon as possible.

Attention! Be careful not to burn yourself! During the heating phase the
mixture and the inside of the basin-pot get very hot.

10.2 BASIC RULES FOR OPERATING THE APPLIANCE

25

Downloaded from www.Manualslib.com manuals search engine


The user operates the appliance standing in front of appliance. The appliance
must be always under users control during operation. Only a single operator can
use the appliance at the time.
The simultaneously use of the appliance from multiple users is forbidden.

CYLINDER COVER LID

LID HANDLE

CONTROL PANNEL

SAFETY SWITCH

OUTLET PIPE

26

Downloaded from www.Manualslib.com manuals search engine


10.3 PRODUCTION BASIN COVER LID

The operator opens the cover lid by lifting the lid lever and lift it back into the open
position. If the appliance is in the mixing mode, the mixing will be interrupted by
lifting the lid (magnetic switch - OFF)
We close the lid cover by pulling the lid lever back down in close position. If the
appliance was in mixing mode the appliance will continue the mixing mode after
cover is closed. (magnetic switch - ON).

LID LEVER

MAGNET

VASCQUE COOVER
MIXER

PRODUCTION BASIN

27

Downloaded from www.Manualslib.com manuals search engine


10.4 OUTLET PIPE

The outlet valve opens by turning the handle in the counter-clockwise direction
and pulling it towards oneself.

OUTLET PIPE

The outlet valve closes by pushing the handle fully forward and turning it in the
clockwise direction.

OUTLET PIPE HANDLE


DRAIN OUTLET

10.5 BEFORE APPLIANCE USAGE

Before using the appliance you should:

 Check that the surroundings of the appliance are not wet or slippery;
 Check that the water gauge inlet is opened;
 Check that the FUSES are inserted and protected;
 Check that the MAIN SWITCH is turned on;
 Check that the basin is properly cleaned;
 Check that the basin is properly disinfected;
 Check that there are no other items or tools left in the production basin
Just a cleaned and disinfected appliance can be used for mass preparation.
To get optimal results it is needed to have proper quantity and proper quality of the
mixture.

28

Downloaded from www.Manualslib.com manuals search engine


The amount of the mixture shall conform to the technical characteristics of the
machine. During preparation and loading it is needed to comply with the minimum
and maximum mixture amounts in the basin. They are reported in below table:

Appliance type min.quantity max.quantity Optimal quantity (kg)


(kg) (kg)
SWEETY quick/quick-i 60 20 60 50
SWEETY quick/quick-i 130 30 130 110
SWEETY quick/quick-i 180 60 180 160

All performance data is based on standard ice cream mixture production. When producing
mixtures, which include ingredients or additives that increase in volume during heating
and/or cooking, the maximum mixture quantity must be reduced in accordance with the
recipe.

10.6 SMALL AMMOUNTS OF ICE-CREAM MIXTURE

To prepare small amounts of ice mass it is necessary to install a flue damper on


the agitator.
Mixing smaller quantities without flue dampers cause air suction in the mix.
When the mass occupies more than half of the basin volume, the flue damper is
not needed.
For small amounts of ice-cream mixtures it used reduced heating and cooling.
When entering the stage of preparation or refrigeration, the reduction is always off.
If the key of currently selected mode is pressed once again for more than 3
seconds the reduction is switched on or off. If the reduction is activated the led of
the active key is blinking. If the key is pressed again the reduction will be disabled.

10.7 MIXTURE TREATING AT THE PRESETED TEMPERATURE

Ice cream mixture treating process at a preset temperature:

 make sure that the control panel is in STOP state;


 make sure that the outlet valve is properly set and well closed;
 pour ice cream mixture in the cylinder and close the cover lid;
 press the AUTOMATIC MIXTURE TREATING key, temperature in the
cylinder is shown on the display, heating phase light indicator lights up;
 as soon as mixtures temperature reaches preset temperature 85°C, the
appliance enters COOLING PHASE and the cooling phase light indicator
begins blinking; mixture is cooled down to 4°C;
 as soon as mixture reaches temperature 4°C, the appliance enters
MAINTAINING PHASE at a temperature between 4°C and 5°C and the
cooling phase light indicator starts lighting continuously.

29

Downloaded from www.Manualslib.com manuals search engine


10.8 MIXING

Ice cream mixture mixing:


 while the appliance is standing still, press the key MIXING to activate the
mixer;
 by pressing this key during the mixing phase, you change the mixing speed
and the corresponding indicator lights are switched on. When both
indicators are on, speed is selected automatically;
 by pressing the MIXING key when the appliance is in the phase of
maintaining or conserving ice cream mixture (the mixer is not active) will
activate the mixer for the duration of 1 minute, after which it will stop
automatically.
Pressing the STOP/ RESET key can stop MIXING.

10.9 OUTLET OF ICE-CREAM MIXTURE

Process of outlet of mixture into a pot (Be careful not to burn yourself while pouring out
the hot mixture!):

 Place a container under the drain outlet;


 Open outlet pipe;
 Control the outlet of ice-cream mixture;
 Close the outlet pipe.

11 CLEANING

11.1 GUIDELINES FOR THE PREVENTION OF INJURIES

Only authorized persons, who know how the machine is operated, must be
allowed to cleaning it. Operators must be familiar with all regulations concerning
occupational safety and fire safety measures, and they must know where fire
extinguishers are located.

Persons still in training must be constantly supervised by a designated person in


charge who knows how the machine works.

Operators must be dressed suitably (no ties, jewelers chains or belts that could get
caught in the machine) and be appropriately protected.

All warning labels on the appliance must be replaced with new ones when they
begin to fade or if they become damaged.

Before cleaning the appliance, the operator must make sure that the appliance is
not under maintenance, in service or in cleaning. At the end of the shift, the
operator working on the next shift or the person who will continue to operate the
appliance must be informed of the current state of the appliance.

30

Downloaded from www.Manualslib.com manuals search engine


Before cleaning the appliance, the operator must make sure that the floor is free of
any oil smudges or other slippery substances or objects which might cause a
person to slip or trip over.

Operators must make sure before cleaning the appliance that the side panels and
the top cover of the appliance are securely fitted to the main construction and that
there are no parts or objects on the appliance or in the cylinder that could damage
the appliance during its operation.

In the event of dangerous situations (e.g. blocked mixer), which could harm the
operator’s or another person’s well being, switching off the MAIN SWITCH must
immediately shut down the appliance.
The side panels and the top cover, as well as safety devices and protective
covers, must not be taken off during the cleaning (during SLOW MIXING) of the
appliance.
It is forbidden to get onto the appliance and walk upon it during its cleaning.

During the cleaning (during SLOW MIXING) of the appliance, attention must be
paid to any oil leaks, increased noise, squeaking sounds or increased vibrations.
In such a case, the appliance must be immediately shut down; a visible notice
board must be placed on it with information that it is inoperable and authorized
service personnel must be notified as soon as possible

Each day before using the machine it is mandatory to verify the operation of
the safety switches on the door. When the machine is in standby mode (on
the screen it shown OFF) lift the basin cover lid. On the screen it should
appear DOOR. Then (with the cover lid opened), press MIXING MODE key,
the appliance must NOT START.

11.2 CLEANING THE SURFACES

Surface cleaning includes cleaning of the side panels of the machine and other
external parts of the machine that are not in contact with the ice cream mix.
It is strictly forbidden to use abrasive pads or aggressive cleaning agents,
which can damage the surfaces.

Cleaning process:

 turn off the SAFETY SWITCH and the MAIN SWITCH;


 ensure that the cover lid and outlet pipe are properly closed;
 clean the surfaces and make sure that the detergent does not touch those
parts, which do come into contact with ice cream mixture.

31

Downloaded from www.Manualslib.com manuals search engine


11.3 WATER PIPES USAGE FOR CLEANING PURPOSES

For cleaning the basin or outlet pipe washing you can use the water pipes that are
installed into the appliance itself. The upper pipe that is installed in the upper part
of the basin is meant for washing or adding water into the basin.
Lower pipe, which is installed in the lower part allow us to wash the outlet pipe, but
not to clean it in the appropriate way.
The pipes have to be connected to the drinkable water inlet (Check appliance
connection). The pipes are controlled by keys on the electric control board. (Check
electric control board).

LOWER
WATER PIPE
UPPER WATER
PIPE

11.4 CLEANING OF PARTS THAT COME IN CONTACT WITH THE


ICE CREAM

All parts, which come into contact with ice cream mixture, must be cleaned before
and after every use. With regular cleaning practice you comply with standards
of hygiene and ensure ice cream mixture treating quality.

Cleaning process:

 make sure that the mixture treating control panel is in STOP state;
 make sure that the ejection opening is well closed;
 by double pressing the desired temperature key allow water inflow into the
basin (30 cm of water);
 Press the mixing key and pay attention on the mixer;
 Press STOP / RESET key;
 turn off the SAFETY SWITCH and the MAIN SWITCH;
 place a suitable container under the ejection opening;
 open the outlet pipe and empty the water from the basin;
 disassemble the cylinder cover:

32

Downloaded from www.Manualslib.com manuals search engine


First, unscrew the cap (clockwise) and lift it from the lid.

Then unscrew the top of the lid (clockwise) and remove it.

Finally lift the lid lever and remove the lower part of the lid.

  unscrew the plastic bolt, take off the flue damper from the mixer, extract the
mixer from the basin:

33

Downloaded from www.Manualslib.com manuals search engine


First unscrew the plastic bolt (clockwise).

PLASTIC BOLT

Pull off a flue damper from the mixer.

FLUE DAMPER

Firmly grab the mixer with both hands and slowly pull it out with care from the
cylinder, as the mixer could be damaged by accidental dropping.

MIXER AXE

  Detach – dissemble the outlet pipe:

34

Downloaded from www.Manualslib.com manuals search engine


Unscrew the locknut. Push the handle as far as possible and turn it clockwise. Use
both hands.

LOCKNUT

Pull out the piston from the outlet pipe.

PISTON
HOUSING

Loosen the valve locknut (clockwise) and detach the outlet pipe assembly using
both hands.

VALVE LOCKNUT

 take off and inspect he piston seal, the locknut washer and the valve
 washer: if the washer or seal is cracked, worn or has lost elasticity, it must
be replaced with a new one;
 the mixer, blockader, both sliders, all parts of the outlet valve, all washers
and seals must be cleaned in warm water and left to dry.
It is strictly forbidden to put plastic parts of the appliance into the dishwasher to
clean them!

35

Downloaded from www.Manualslib.com manuals search engine


When cleaning the mixer use the brush that is supplied with the appliance.

CLEANING BRUSH

 

it is recommended that rubber seals are greased with Vaseline
put the mixer back into the basin, screw the plastic bolt and if necessary re-
install the flue dumper back onto the mixer:

Hold the mixer with both hands and slowly and carefully put it back in position into
the basin.

When the mixer is back in proper position onto the mixer axe screw the plastic
bolt.

36

Downloaded from www.Manualslib.com manuals search engine


At the end if necessary put the flue damper back onto the mixer (see chapter
SMALL AMMOUNTS OF ICE-CREAM MIXTURE)

  reinstall the cover lid:

First put the lower cover back into position and lower the lid lever.

Then put the upper part of the cover back in position and screw it onto the lower
part of the lid.

37

Downloaded from www.Manualslib.com manuals search engine


At the end screw the cover cap onto the upper part of the lid. With this the basin
cover lid is back in position and ready to use.

  re-install the outlet pipe assembly:

Put the outlet pipe assembly near the outlet support and screw the valve locknut
back in position. Outlet drain pipe should be directed downward toward floor.

Insert the piston back into the housing of outlet pipe assembly by turning it and
screw the locknut back in position.

38

Downloaded from www.Manualslib.com manuals search engine


11.5 PRODUCTION BASIN DISINFECTION

Disinfection process:

 make sure that the mixture treating control panel is in STOP state;
 make sure that the ejection opening is well closed;
 open the basin cover;
 fill the basin with a disinfecting mixture;
 fill the basin with water (double click DESIRED TEMPERATURE key);
 close the cylinder cover and let the disinfecting mixture rest for 20 minutes.

While doing so, please pay special attention to instructions of the


disinfection agent manufacturer as well as hygienic standards, which
are valid in your country

12 MAINTENANCE OF THE APPLIANCE

12.1 INSTRUCTIONS FOR PREVENTION OF INJURIES

Authorized servicing personnel may only perform removal of the top cover and
side panels and any intervening actions inside the machine.

Removal of the top cover and side panels and any intervening actions inside
the machine is strictly forbidden when the machine is connected to the
power supply.

It is strictly forbidden to connect the machine to the power supply if top


cover and side panels are not properly attached and all required security
measures are not in place.

Cleaning or lubrication of parts, which are moving or rotating, is forbidden.

12.2 PROBLEMS, ERRORS AND TROUBLESHOOTING

Malfunctions and errors are caused mostly by incorrect use, improper or


inadequate maintenance or incorrect connection of the appliance.
Therefore the operators must always carefully follow the instructions.

39

Downloaded from www.Manualslib.com manuals search engine


The errors, the causes and troubleshooting:

Error Cause Troubbleshooting


Appliance will not start up when There is no power supply Check the power circuit. Turn ON
switched on the safety switch.
Automatic fuses are Switch on the power fuses again.
disconnected.
Compressor starts, but stops Water supply is closed Open water outlet
emediately and display shows
“- P -“ Water inlet is disconected Conect water inlet

Heating cycle takes too long Heater has burnt out. Call VALMAR service tehnicans.
There is not enough glycol Call VALMAR service tehnicans.
in the system.
Cooling cycle takes too long Water supply flow is too Make sure that the valve is open
weak. and the pipes are not jammed.
There is not enough glycol Check the quantity of the glycol.
in the system.
Cooling is inadequate The expansion valve does Call VALMAR service tehnicans.
not work properly.
Inadequate condensation. Call VALMAR service tehnicans.

The cooling filter is Call VALMAR service tehnicans.


blocked.
Gas leckage in the system. Call VALMAR service tehnicans.

12.3 REGULAR MAINTENANCE INSPECTION PLAN

All maintenance and servicing must be carried out by technicians authorized by


VALMAR Company.

Maintenance inspection WEEKLY MONTHLY EACH THREE YEARLY


MONTHS
Security systems X
Electricity connections X
Tightness of the screws and sealing X
Door safety switch (DOOR) X
Gas X
Glycol X

40

Downloaded from www.Manualslib.com manuals search engine


12.4 TESTING START UP

Testing start up of the appliance:

 make sure that the control panel is in STOP state;


 make sure that the outlet pipe is properly set and well closed
 open the cover lid ;
 fill the basin with 30 cm of water (double click DESIRED TEMPERATURE
key);
 lower – close cover lid;
 press MIXING MODE key and check mixer operation;
 press STOP / RESET key;
 open outlet pipe and empty the water from the basin.

12.5 REGULATION OF THE WATER FEED VALVE

The water feed valve is preset to factory default values. These may change due to
possible shocks and vibrations during transportation.
In this case, the water feed valve has to be reset properly by authorized servicing
personnel.
The water feed valve functions properly when tepid water is discharged from
appliance during the operation of the compressor unit; the water flow stops when
the appliance stops. Water consumption increases if the temperature of cooling
water exceeds 18°C.

12.6 ENVIRONMENT TEMPERATURES BELOW 0°C

Do not leave the appliance in an environment colder than 0ºC (273K). If this is the
case, discharge water from the condenser.
To empty the water out of the appliance, detach the cap of the safety valve at it's
bottom. When all water has been discharged, put the cap back in position.

 CONDENSER

SAFETY VALVE

41

Downloaded from www.Manualslib.com manuals search engine


 Open the safety valve and empty the system.

 When the system is empty close the valve.

Screw the cap of the safety valve back in position.




42

Downloaded from www.Manualslib.com manuals search engine


12.7 ORDERING SPARE PARTS

The order for any spare part must include:

 model,
 ID number,
 Short description of the part
 Factory code (if possible),
 Number of pieces.

Spare part order:

VALMAR GLOBAL d.o.o.


DOMBRAVA 1A, 5293 VOLČJA DRAGA
Slovenija
tel.: n.c. (+386) 5 3311777,

fax. (+386) 5 33 11 778,


E-mail: valter@valmar-global.com ,
http://www.valmar-global.com

SPARE PART ORDER

TYPE AND MODEL: SWEETY 60 DIGIT


ID NUMBER: No.100138
SHORT DESCRIPTION OF THE PART:
PIPE PISTON
FACTORY CODE: /
No. OF PIECES: 1

COMPANY

43

Downloaded from www.Manualslib.com manuals search engine

You might also like