HKN-EFI-00146 - 01 - Hazardous Drain System - Piping and Instrumentation Diagram (P&ID) - AXG10
HKN-EFI-00146 - 01 - Hazardous Drain System - Piping and Instrumentation Diagram (P&ID) - AXG10
= VIBRATION MEASUREMENT GENERAL 01 06/10/2020 ABO For Review Second Issue RBL MMA DDE
00 30/06/2020 ABB For Review First Issue RBL MMA DDE
Rev. Rev. Date By Purpose of issue Comment / change log Checked IDC Approved
= LIMIT SWITCH MECHANICAL TYPE Reference Item designation
. HKN=T001AXG10
Contractors doc-id
= LIMIT SWITCH PROXIMITY TYPE .
HKN-FAB-DS-DIA-4006
. Employers doc-id
. HKN-EFI-00146
TO/FROM CONTROL SYSTEMS . DCC
M - Mechanical engineering, FB030 Piping & Instrument Diagram (P&ID)
Company Name of the project
C AUXILIARY SCADA EFI HOLLANDSE KUST NOORD
Document title
LT LEVEL TRANSMITTER HAZARDOUS DRAIN SYSTEM - PIPING & INSTRUMENTATION DIAGRAM (P & ID) - AXG10
Logo Scale
NTS
Format
LI LEVEL INDICATOR A1
Revision Sheet
01 1 OF 4
NOZZLE TABLE F0 F1 F2 LINE SIZE SERVICE PIPE SPEC. INSULATION NOTES
N1 DN100 N7 DN100 T001 AXG10 WP001 DN100 DH AP01 N
1. TANK AND CONNECTING VALVES TO BE INSULATED.
N2 DN100 N8 DN100 T001 AXG10 WP002 DN50 DH AP01 N 2. OIL/WATER SEPARATOR AND OIL IN WATER ANALYZER ARE LOCATED IN A DRIP TRAY.
T001 AXG10 WP003 DN50 DH AP01 N 3. OIL UPON HIGH OIL-IN-WATER THREE WAY VALVE TO SWITCH TO OFF SPEC WATER
N3 DN25 N9 DN50 LINE TO SUMP TANK AND TO SWITCH TO WATER OVERBOARD LINE WHEN OIL-IN-WATER
T001 AXG10 WP004 DN50 DH AP01 N CONTENT IS WITHIN 15 PPM. DRAIN TRANSFER PUMP ARE NOT
N4 DN25 N10 DN50
T001 AXG10 WP005 DN80 DH AP01 N
TRIPPED ON HIGH OIL-IN-WATER.
N5 DN100 N11 DN50 4. INCREASE PIPE SECTION FUNCTIONS AS BREAK TANK AT THE INLET OF
T001 AXG10 WP006 DN50 DH AP01 N OIL/WATER SEPARATOR. PUMP DISCHARGE LINES TO TO ENTER AT THE TOP
N6 DN100 N12 DN50 OF THE PIPE SECTION, TO AVOID REVERSE FLOW FROM ONE PUMP TO THE
T001 AXG10 WP007 DN100 DH AP01 H/E
OTHER PUMP.
T001 AXG10 WP008 DN100 DH AP01 H/E 5. OIL SENSOR IS DESIGNED FOR PARTIAL FLOW. INLET BRANCH TO BE IN VERTICAL LINE
SECTION INSIDE LIQUID POCKET, AND TO PENETRATE INSIDE THE
T001 AXG10 WP009 DN100 DH AP01 N DISCHARGE PIPE TO A DISTANCE OF ONE QUARTER THE DIAMETER OF THAT PIPE.
FROM DRAIN
T001 AXG10 WP010 DN80 DH AP01 N 6. THREE MANWAYS PROVIDE FULL ACCESS FROM THE TOP.
TRANSFER PUMP
7. VACUUM BREAKER VENT OIL-IN-WATER ANALYZER TO BE ENDING AT THE SAME
WP015 T001 AXG10 WP011 DN100 DH AP01 N ELEVATION AS VACUUM BREAKER ON MAIN WATER OVERBOARD LINE.
T001 AXG10 WP012 DN100 DH AP01 N
SLOPE
TO ATM @ SAFE
LOCATION GENERAL NOTES
FROM DRAIN OUTDOOR
1. SLOPES SHOULD BE BETWEEN 0.5% TO 1%.
TRANSFER PUMP
WP014
SLOPE
NOTE 4
ON ON
SLOPE C
INDICATION INDICATION OVERFLOW
WP001 NOTE 7
C C
BQ SET @
15 PPMV
WP008
N2 N3 N4 N5 N6
SLOPE
M1 M2 M3 N7 SLOPE
N1 NOTE 6 NOTE 6 NOTE 6
WP013 N8
WP007 SLOPE TO DUMP CAISSON
OIL IN WATER
ANALYZER
WP011
NOTE 3
M
NOTE 1
OIL/WATER
SEPARATOR C
N9 OFF-SPEC WATER TO
SUMP TANK
SLOPE OIL/WATER COMPARTMENT
WP012
WP001
N12 N11 N10
WP006
SLOPE
WP002
WP003
WP004
. . . . . . . .
. . . . . . . .
TO SUMP TANK . . . . . . . .
SLOPE SLOPE SLOPE SLOPE SLOPE OIL COMPARTMENT . . . . . . . .
01 06/10/2020 ABO For Review Second Issue RBL MMA DDE
WP002 WP002 WP005 WP005 WP009
00 30/06/2020 ABB For Review First Issue RBL MMA DDE
Rev. Rev. Date By Purpose of issue Comment / change log Checked IDC Approved
Reference Item designation
. HKN=T001AXG10
Contractors doc-id
.
HKN-FAB-DS-DIA-4006
. Employers doc-id
NOTE 2 . HKN-EFI-00146
DCC
.
M - Mechanical engineering, FB030 Piping & Instrument Diagram (P&ID)
TO SUMP TANK Company Name of the project
OIL/WATER
EFI HOLLANDSE KUST NOORD
SLOPE COMPARTMENT Document title
HAZARDOUS DRAIN SYSTEM - PIPING & INSTRUMENTATION DIAGRAM (P & ID) - AXG10
WP010 Logo Scale
NTS
Format
A1
Revision Sheet
01 2 OF 4
F0 F1 F2 LINE SIZE SERVICE PIPE SPEC. INSULATION NOTES
T001 AXG10 WP009 DN100 DH AP01 N
WP016
T001 AXG10 WP026 DN40 DH AP01 N
SLOPE
T001 AXG10 WP028 DN80 DH AP01 N GENERAL NOTES
T001 AXG10 WP029 DN80 DH AP01 N
1. SLOPES SHOULD BE BETWEEN 0.5% TO 1%.
WP017 T001 AXG10 WP030 DN80 DH AP01 N
WP018
WP018
WP031
WP032
STORAGE OF OIL
DRUMS IN MAIN
WP017
TRANSFORMER ROOM
(++AZA10.207)
FIRE FIGHTING SLOPE
ROOM
(++AZA10.204)
DRIPTRAY
WP026
SLOPE
WP028
WP029
COOLER COOLER
SLOPE
SLOPE
TRANSFORMER TRANSFORMER
A B SLOPE
(++AZA10.254) (++AZA10.255)
WP027
NOTE 3
DRIPTRAY SLOPE
WP030
NOTE 3
WP020
WP021
WP022
WP023
WP024
WP025
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
MAIN MAIN
TRANSFORMER TRANSFORMER AUX AUX
ROOM B ROOM A TRANSFORMER TRANSFORMER
WP031
SLOPE
(++AZA10.208) (++AZA10.207) ROOM A ROOM B
(++AZA10.201) (++AZA10.205)
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE OPENING SIZE 1500 SQ.CM
NOTE 3
. . . . . . . .
. . . . . . . .
TO SUMP TANK . . . . . . . .
SLOPE SLOPE OIL COMPARTMENT
WP019
. . . . . . . .
01 06/10/2020 ABO For Review Second Issue RBL MMA DDE
WP027 WP027
00 30/06/2020 ABB For Review First Issue RBL MMA DDE
OFF-SPEC WATER FROM Rev. Rev. Date By Purpose of issue Comment / change log Checked IDC Approved
OIL/WATER SEPARATOR SLOPE Reference Item designation
. HKN=T001AXG10
Contractors doc-id
.
WP009 HKN-FAB-DS-DIA-4006
. Employers doc-id
. HKN-EFI-00146
DCC
.
M - Mechanical engineering, FB030 Piping & Instrument Diagram (P&ID)
Company Name of the project
FROM DRIPTRAY
EFI HOLLANDSE KUST NOORD
OIL/WATER SEPARATOR SLOPE TO SUMP TANK Document title
OIL/WATER HAZARDOUS DRAIN SYSTEM - PIPING & INSTRUMENTATION DIAGRAM (P & ID) - AXG10
WP010 WP010 COMPARTMENT Logo Scale
SLOPE NTS
Format
A1
WP019 Revision Sheet
01 3 OF 4
F0 F1 F2 LINE SIZE SERVICE PIPE SPEC. INSULATION NOTES
T001 AXG10 WP012 DN100 DH AP01 N
1. DIP PIPE ENDS ABOVE TANK BOTTOM.
T001 AXG10 WP014 DN80 DH AP01 N 2. DRAIN BOTTOM IN BUNDLE AREA, DISCHARGING DIRECTLY INTO SUMP TANK
T001 AXG10 WP015 DN80 DH AP01 N
UNDERNEATH. TO BE TEMPORARY PLUGGED DURING TANK INSPECTION.
3. DIP PIPE TO BE AT LOWEST POINT IN THE SUMP TANK COMPARTMENT ABOVE SUMP.
T001 AXG10 WP019 DN200 DH AP01 N 4. TANK TO BE INSULATED (WINTERIZATION).
5. PERISTALTIC PUMP, AFTER PUMPING, THE PUMP WILL OPERATE WITH REVERSED
T001 AXG10 WP027 DN80 DH AP01 N
FLOW VIA THE AUXILIARY SCADA TO DRAIN OFF THE DISCHARGE LINE. FOR
T001 AXG10 WP033 DN50 DH AP01 N MAINTENANCE PURPOSES, THE PUMP SHALL BE STARTED/STOPPED IN REVERSE
DIRECTION ONCE A WEEK.
GENERAL NOTES
1. SLOPES SHOULD BE BETWEEN 0.5% TO 1%.
OUTDOOR INDOOR
OUTDOOR INDOOR
PT PT
C C
L L
WP015
WP014
SLOPE
SLOPE
C C C C
N2 N2
VENT
M
DRAIN DRAIN
M M
TRANSFER TRANSFER SLOPE
VF
PUMP PUMP BUNKER
STATION
NOTE 5 WP015.MA001 WP014.MA001 NOTE 5
N1 N1 DRIP PAN
SLOPE SLOPE
TRANSFER BUNKERING
PUMP SKID
WP033
INDOOR OUTDOOR
SLOPE
SLOPE FROM OIL/WATER SEPARATOR
C
TO ATM @
SAFE LOCATION THERMOSTAT WP012
THERMOSTAT
ON ON
INDICATION INDICATION
RADAR RADAR
HH HH
LI LT H C C LI LT H C C
L L
C NO
LL LL
C M NO NO
SLOPE
NOTE 2
LEAK_DETECT. NOZZLE TABLE
N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12 N13 N14 N15 N16 N17 N18 N1 DN50 N10 DN100