DOCUMENT SUBMISSION STATUS: FOR APPROVAL

A 08.03.2016 FOR APPROVAL L.T.HA H.V.TUNG D.V.SON


REV DATE DESCRIPTION PREPARED CHECKED APPROVED

PROJECT TITLE

SONG HAU 1 THERMAL POWER PLANT (2x600MW)

OWNER OWNER’S CONSULTANT

VIETNAM OIL AND GAS GROUP (PVN) FICHTNER GmbH & Co. KG PV ENGINEERING

EPC CONTRACTOR EPC CONTRACTOR’S CONSULTANT

VIETNAM MACHINERY INSTALLATION TOKYO ELECTRIC POWER SERVICES


CORPORATION (LILAMA) COMPANY LIMITED - TEPSCO
SUB-CONTRACTOR

DATE NAME SIGN DOCUMENT TITLE

PREPARED 05.03.2016 L.T.HA

TURBINE BUILDING
CHECKED 08.03.2016 H.V.TUNG
Painting Procedure for Steel Structure
APPROVED 08.03.2016 D.V.SON

DOCUMENT NO. REV.


SH1-L45.1-P0UMA-M-M01-PRO-0004 A
SONG HAU 1 THERMAL POWER PLANT PROJECT

CONTENTS


Page
1 INTRODUCTION....................................................................................................................... 3
1.1 SCOPE................................................................................................................................ 3
1.2 TERMS AND DEFINITIONS............................................................................................. 3
2 REFERENCE & STANDARDS.................................................................................................. 3
2.1 REFERENCE & STANDARDS.......................................................................................... 3
2.2 SAFETY.............................................................................................................................. 3
3 SURFACE PREPARATION....................................................................................................... 3
4 MIXING, THINNING, AND STORAGE.................................................................................... 4
4.1 STORAGE........................................................................................................................... 4
4.2 MIXING AND THINNING................................................................................................. 4
5 APPLICATION FOR COATING................................................................................................ 4
5.1 COATING SYSTEMS......................................................................................................... 4
5.2 APPLICATION................................................................................................................... 4
5.2.1 APPLICATION OF PRIME COAT................................................................................. 4
5.2.2 AIR SPRAY..................................................................................................................... 5
5.2.3 BRUSHING..................................................................................................................... 5
5.2.4 CAUTION....................................................................................................................... 6
5.3 DRYING OF COATED SURFACE....................................................................................6
6 REPAIR...................................................................................................................................... 6
7 INSPECTION & TESTING........................................................................................................ 6

SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 2 of 7
SONG HAU 1 THERMAL POWER PLANT PROJECT

1 INTRODUCTION
1.1 SCOPE
This procedure covers the requirements governing the selection and application of the
coating system to be used on the surface of product.
Individual equipment specifications and / or drawing furnished are to be used with these
specifications. If conflict exits, the individual specifications and / or drawing furnished
shall govern.
1.2 TERMS AND DEFINITIONS
Throughout this procedure the following shall be used:
Constructor shall mean LILAMA45.1.
Approvals/ Approved shall mean written consent of Client.
Manufacturer shall mean Paint manufacturer.
2 REFERENCE & STANDARDS
2.1 REFERENCE & STANDARDS
All works shall conform to the manufactures’ instructions, application codes and
specifications, in particular:
Painting Specification.
Standard ISO 8501-1.
In the event of any inconsistency between this procedure and any other documents, the
deviation shall only be approved in writing by Client.
2.2 SAFETY
The Contractor shall maintain required safety standards during coating operation particular
attention shall be paid to the following:
Paint, solvents and other materials are to be handled and stored in accordance with the
relevant requirements.
Appropriate protective clothing shall be worn at all times when operating equipment or
handling chemicals.
All equipment used shall be in safe working order and fit for the purpose.
3 SURFACE PREPARATION
All oil and grease shall be removed with clean rags soaked in a suitable solvent.
All rough welds, burrs, weld spatter, indentation, and all other sharp surface protections
shall be ground smooth prior to further surface preparation. Any surface on which grinding
is done after blasting, shall be blast cleaned to obtain proper anchor pattern.
Any oil, grease, dust, or foreign matter deposited on the surface after the surface
preparation is completed shall be removed to paint. In the event rusting occurs after
completed preparation, the surface shall again be cleaned in accordance with the above
steps.
Dry blast cleaning operation shall not be conducted on surface that will be wet after
blasting and before painting. If relative humidity is greater than 80 percent, permission to
blast shall be obtained from Clients Supervisor.
After blast cleaning, the blasting material residue and dust shall be removed by air-blow at
SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 3 of 7
SONG HAU 1 THERMAL POWER PLANT PROJECT

100psi.
Prior to coating the blast profile shall be checked by the Inspector and recorded.
4 MIXING, THINNING, AND STORAGE
4.1 STORAGE
Paint batches should be recorded on receipt and noted on the inspection records when used
this will ensure shelf life is not exceeded.
All containers of coating material shall remain in unopened original manufacturer’s
containers until required for use.
Coating material, which has jelled or otherwise deteriorated during storage, shall not be
used.
Coating material shall be stored / handled under condition such as temperature, humidity in
accordance with the Manufacturer’s instruction.
4.2 MIXING AND THINNING
All ingredients in any containers shall be thoroughly mixed before use to a smooth and
uniform consistency. Mechanical agitation during application shall meet the
Manufacturer’s instruction and be sufficient to keep pigment in solution.
Coating material mixed in the original container shall not be transferred until all settled,
pigment is incorporated in to the vehicle. This does not imply that of the vehicle may not
be poured off temporary to simplify the mixing.
Coating material shall not be mixed or kept in suspension by using a bubbling air stream.
All pigmented material shall be strained after mixing except where application equipment
is provided with adequate strainers which shall be able of passing the pigment and
removing any skin.
Material, which does not have a limited pot life or does not deteriorate on standing alone,
may be mixed prior to use, but if settling has occurred, it must be remixed immediately
before using. Coating material shall not remain in spare pots or buckets overnight but shall
be gathered into a closed container before use.
No thinner shall be added and remixed unless necessary for proper application. Thinning
shall not exceed limitation established in manufacturer’s instruction.
Type of thinner shall comply with manufacturer’s instruction.
When use of thinner is permissible, it shall be added during the mixing process. Painter
shall not add thinner after it has been proper consistency. All thinning shall be done under
control of a supervisor with the correct amount and type to be added.
5 APPLICATION FOR COATING
5.1 COATING SYSTEMS
The type, number of coats, color and dry film thickness (DFT) shall be as per painting
specification follows:

5.1.1 OUTDOOR SYSTEM


No Coating system Spec DFT WFT
1 Primer coat Epoxy Zinc 50 91

SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 4 of 7
SONG HAU 1 THERMAL POWER PLANT PROJECT

2 Second Coat Epoxy 140 175


3 Top Coat Polyurethane 50 88

5.1.3 INDOOR SYSTEM


No Coating system Spec DFT WFT
1 Primer coat Epoxy Zinc 80 140
2 Top Coat Polyurethane 80 145

5.2 APPLICATION
5.2.1 APPLICATION OF PRIME COAT
Prime coat shall not be applied before the blasting cleaned surface has been cleaned &
inspected and approved by LILAMA 45.1 Inspector and LILAMA supervisor.
Surface shall not be coated in rain, wind, snow, fog, mist or in area where injurious
airborne elements exits, when the steel surface temperature is less than 3 oC above dew
point.
Blasting cleaned surface shall be coated with one complete application of primer as soon as
possible but not later than 4 hours as blast cleaned.
5.2.2 AIR SPRAY
Air spray application shall be in accordance with the following:
The equipment used shall be requested by Manufacturer and shall be suitable for atomizing
the paint; the equipment must be controlled prior to performance. The equipment shall be
kept in satisfactory condition to permit paint application.
Traps or separators shall be provided to remove oil and condensed water from the air.
These traps or separators must be adequate size and must be drained periodically during
operations.
Paint shall be kept properly mixed in the spray pots or containers during application by
continuous mechanical agitation.
The pressure on the mixed paint in the pot and of the air at the gun shall be adjusted for
optimum spraying effective; the pressure on mixed paint in the pot shall be adjusted when
necessary for changes in elevation of the gun above pot. The atomizing air pressure at the
gun shall be sufficient to property atomize the paint but not so high as to cause excessive
fogging of paint, excessive evaporation of solvent, or loss by over spray.
Spay equipment shall be kept clean so that dirt, dried paint, and other foreign materials are
not deposited in the paint film. Any solvent left in the equipment shall be completely
removed before applying paint to the surface being painted.
Paint shall be applied in uniform layer, with overlapping at the edge of the spray pattern.
The spray paten shall be adjusted so that the paint is deposited uniformly. During
application the gun shall be help perpendicular to the surface and at a distance, which will
ensure that a wet layer of paint is deposited on the surface. The trigger of the gun should be
released at the end of each stroke.
All runs and sags shall be brushed out immediately or the paint shall be removed and the

SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 5 of 7
SONG HAU 1 THERMAL POWER PLANT PROJECT

surface repainted.
Areas inaccessible by the spray gun shall be painted by brush.
Particular precautions are necessary in spraying inorganic zinc...which is listed in the
manufacturer’s instruction.
5.2.3 BRUSHING
Brushing application of paint shall be in accordance with the following:
Limited to areas either not accessible by or where it is not appropriate to use air spray
application.
Brushes shall be of a style and quality that will enable proper application of paint. Round
or oval brushes are most suitable for rivets, bolts, irregular surfaces, and rough or pitted
steel. Wide, flat brushes are suitable for large flat areas, but they shall not have a width
over 125 mm.
The brushing shall be done so that a smooth coat as nearly uniform in thickness as possible
is obtained.
Paint shall be worked into all corners.
Any runs or sags shall be brushed out.
These shall be a minimum of brush marks left in the applied paint.
5.2.4 CAUTION
All nameplates, identification tags, machined surfaces, instrument glass, finished flange
faces, control valve stems and similar items shall be marked to prevent coating deposition.
If these surface are coated the component shall be cleaned and restored to its original
condition.
Edges of structural shapes and irregular coated surfaces shall be coated first and an extra
pass made later.
Wet paint shall be protected against contamination from dust or other foreign matter.
5.3 DRYING OF COATED SURFACE
No coat shall be applied until the preceding coat has dried. The minimum curing time
between coats is in conformity with Manufacturer’s instruction
Not paint shall be force dried under any conditions.
6 REPAIR
Where shop paint has been damaged in handling, all damaged and loosely adhering paint
shall be removed and the surface thoroughly cleaned by wire brush. The breaks shall be
cleaned within 100 mm, and the designated number of primer of finish coats applied to the
thickness.
Defects in the prime coat resulting damage, poor application technique or surface
preparation shall be re-coated in accordance with section 5.2.1 of this procedure prior to
application of top coats.
Superficial damage to top / or intermediate coats has exposed the underlying steel surface
to the atmosphere may be repaired by touch up painting after removing surface
contaminants and preparation the surface.
The top and intermediate coats that show poor inter-coat or other faults shall be wholly
removed by abrasive in accordance with section 3.0 followers by re-coating in accordance
with section 5.2.2 of this procedure.
SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 6 of 7
SONG HAU 1 THERMAL POWER PLANT PROJECT

7 INSPECTION & TESTING


All work and material applied under this procedure shall be subject to inspection by a
Client representative.
Any failures to comply with this procedure shall be rectified prior final acceptance of the
works.
All results of inspection, measurement will be shown in “Blasting & Painting Inspection
report” (See the form: SH1- QCF- MF-005).
Inspection instruments: According to specification. (Painting schedule)
Whirling hydrometer (for humidity)
Temperature gauge
Micro thickness gauge (for paint thickness - WET & DFT)
Note: All the blasting and painting work shall be carrying out of out door (out site of
house)

SH1-L45.1-P0UMA-M-M01-PRO-0004 Rev.A 7 of 7