Deployment Playbook
1
CONTENT
4 Weekly plans
2
1. PLAYBOOK
STRUCTURE AND
GUIDELINES
3
Optional
1. PLAYBOOK STRUCTURE
AND GUIDELINES
4
VERSION CONTROL
5
USING THE DEPLOYMENT PLAYBOOK
ABBREVIATIONS AND VOCABULARY INDEX
AM Autonomous Maintenance LS Line Settings
BDE Breakdown Elimination LT Line Team
CBP Current Best Practice LTC Line Team Coach
CI Continuous Improvement LTL Line Team Lead
CIL Clean, Inspect, Lubricate OEE Overall Equipment Effectiveness
CO Changeover OM Operations Manager
EM Engineering Manager PE Process Engineer
FD Factory Director PIL Process Improvement Lead
FI Focussed Improvement PM Professional Maintenance
FM Finance Manager SMED Single Minute Exchange of Dies
FT Focus Technician TM Tags Management
FV Factory Vision UL Unilever
EHS Environment, Health and Safety VR Volume Reliability
HC Health Check WCM World Class Manufacturing
HRM HR Manager WCM MGR WCM Manager
KPI Key Performance Indicator
6
THE PLAYBOOK PROVIDES CLEAR GUIDANCE ON THE WEEKLY
ACTIVITIES TO DEPLOY WCM BLITZ AND SUSTAIN THE RESULTS
1 Overview 3 Activities Planning Considerations
Provide week by week guidance for the deployment of WCM • Weekly drumbeat timings should be adjusted, in association
capabilities and tools within a 16-weeks ‘Blitz’ with the team, based on the local shift patterns - keeping to
The play book should be used together with the WCM Blitz the suggested structure as closely as possible
“Current Best Practice” guidebook • The deployment of Work Process and tools must occur within
the designated week. Any changes should be signed off by the
deployment leadership team
3 Structure • Conduct weekly Next Week Planning session with the
activities required based on staff availability
The Playbook consists of 16 weekly-plans defining the key
• The next week plan should be displayed in the daily meeting
activities that will take place in each week.
room
Each week has three sections:
• Promote and encourage attendance by the Senior Leadership
1. Overview showing what work processes and tools will be Team to open activities to develop their exposure and
introduced during the week knowledge of the Blitz approach and WCM
2. Detailed Work Plan lists:
• The activities to be planned in the week
• The type of coaching required
• Required supporting material
• Required attendees for the sessions
3. Weekly Drumbeat showing when activities should be planned,
this evolves throughout the Playbook as additional activities
are deployed
7
PLAYBOOK ASSUMPTIONS
• The Playbook is the current leading practice • The Playbook timings are based on a Factory
for deploying the Blitz. with the following work pattern:
• The Playbook is designed to detail the type of • Line 9: 24 hours – 7 day a week operation
and timings for the activities required.
• Line 2: 24 hours – 7 day a week operation
• The daily timings of activities have been
• Line Team working hours of Monday to Friday
planned for the factory work pattern
5.30 to 18.30 to see all 3 shifts
described on this page.
• Two shifts:
• The implementation team should work with
the local factory team to adjust times to suit • Morning 6.00 to 18.00
their work pattern, but the timings should be
• Night 18.00 to 6.00
as close to those in the weekly drum beat as
possible. It is also recommended that the daily
and weekly order of events is preserved if any
adjustments to times are made. This is
especially true of the regular meetings and
Scheduled Stop timings
8
USING THE PLAYBOOK
WEEKLY DRUMBEAT TEMPLATE
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
8.00 – 9.00
9.00 – 10.00
10.00 – 11.00
11.00 – 12.00
12.00 – 13.00
13.00 – 14.00
14.00 – 15.00
15.00 – 16.00
16.00 – 17.00
17.00 – 18.00
Night Shift
9
THE COACHING STRUCTURE WILL ENABLE THE SUCCESSFUL
AND SUSTAINABLE DEPLOYMENT OF THE WCM BLITZ
Deployment Coaching structure (to evolve over
Core Coaching Team
time)
1 Line Coaching Role
Factory
Each member of the Line Coaching Team will partner with Director
a member of the Line structure to: 2
Site
• Provide specific coaching and support
Engineering
• Provide advice on the SW owned by their Line Structure 4
Manager
partner
• Lead the SW Implementation Review session for the SW Central v
ManEX/
2 Senior coaches
Consultant
Factory Director and Engineering Manager act as senior Operations Factory
s WCM
coaches: Manager Engineering
1 Manager
(key coach) manager
• Provide specific coaching and support
• Lead ongoing health checks on SW
10
2. BLITZ APPROACH
OVERVIEW
11
Optional
2. BLITZ APPROACH
OVERVIEW
12
HOLISTIC DEPLOYMENT PLAN ACROSS WORK PROCESS, TOOLS
AND LEADERSHIP TO ENABLE SUSTAINED RESULTS
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16
Tags Management
Rate Strategy
OEE Calculation
13
3. BLITZ PRINCIPLES
14
Optional
3. BLITZ PRINCIPLES
15
THE BLITZ PRINCIPLES WILL GUIDE THE BLITZ APPROACH AND
THE DECISIONS TAKEN DURING THE DEPLOYMENT
3 The WCM Blitz is enabled and sustained by the Unilever leadership model
Work processes, tools and leadership capabilities should be developed consistently to drive sustainable
4
improvements
6 Each employee is empowered to make decisions within their own area and leadership to provide support
7 Zero loss mindset from site leadership to operators will be the norm, not the exception
16
4. WEEKLY PLANS
17
Optional
4. WEEKLY PLANS
18
WEEKLY PLAN USE GUIDANCE
• Only major planned activities have been captured in the We have used a consistent colour coding mechanism to
weekly deployment plans provide a clear line of sight between actions and the plan.
• Plans are indicative, and timings should be adapted to The coding is:
the schedule restrictions of those implementing Activity Description Color
• Plans are adapted to meet the needs of Port Sunlight Tool/Work Any activity where a new tool or
Factory 1, and therefore effective transfer to other Process Work Process is deployed for the
factories might require adjustments Deployment first time
• All terminology has been aligned with that used in WCM Work Any Work Process that is delivered
Best Practices, or within the PSL site. Any Process regularly as part of this deployment
misalignments or gaps should be consulted with UL Execution playbook
document owners Any training or learning for site
Training and
leadership, factory leadership , line
Learning
leadership, or operators
Any workshops or working sessions
Workshop/
used within the programme to
Working
develop specific outcomes in
Session
relation to programme goals
Periods within this playbook where
Line Stops
we will plan for the line to stop
19
PREPARATION
20
PREPARATION WEEK
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
21
PREPARATION WEEK
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Request initial data for lead Deployment Working 90 WCM MGR, Factory
Working session OEE calculation standards, Stops and MTBS calculation standard
line(s) Team sessions minutes data expert, CI
Factory data
Review LEDS data for gaps, Deployment Working 120
Working session OEE calculation standards Unilever and Reliability Engineering expert, CI, WCM
develop initial baseline Team sessions minutes
MGR
22
PREP WEEK DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
8.00 – 9.00
10.00 – 11.00
Review current leadership Review LEDS data for
Prepare daily meeting
standards/process & gaps, develop initial
11.00 – 12.00 Establish Line Team and board
factory strategy baseline
coaching structure
12.00 – 13.00
Confirm Lead Line
13.00 – 14.00 Request initial data for Complete Current State Confirm/establish locked
lead line(s) Assessment activities on rate
14.00 – 15.00 the line
Current state assessment
AM Pillar Agree Daily Meeting Board
15.00 – 16.00 standards/deployment design
16.00 – 17.00
17.00 – 18.00
Night Shift
23
WEEK 1
24
WEEK 1
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
25
WEEK 1
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
26
WEEK 1 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
Operator Blitz Kick-Off
Night Shift
27
WEEK 2
28
WEEK 2
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
29
WEEK 2
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Line Team
Scheduled Stop Deployment Scheduled Stop Scheduled stop template, process Excel 30 Mins LT, EM
Leader (LTL)
LT, Selected
Line Team
Deep Clean & Inspection session Initial Cleaning Deployment Leading Practice – Scheduled Stop Checklist 240 Mins Factory Leaders,
Leader (LTL)
Engineers
Recurring Activities
Deployment FD, OM, WCM
Weekly Deployment Review Progress Review Status Report PowerPoint 60 mins
Team MGR, EM
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
30
WEEK 2 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
Operator scheduled Stop
8.00 – 9.00 and CIL Training
12.00 – 13.00
Health Check Training
Deploy Leadership Health
13.00 – 14.00
Check
Daily Meeting Follow-Up
14.00 – 15.00
17.00 – 18.00
Night Shift
31
WEEK 3
32
WEEK 3
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
33
WEEK 3
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
FT, LTL,
Focused Working
Deploy tags planning cycle Deployment TM TM Presentation, Unilever Maintenance Plan 60 mins Maintenance
Technician session
Planner
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
34
WEEK 3 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00
Scheduled stop
9.00 – 10.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
Night Shift
35
WEEK 4
36
WEEK 4
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
37
WEEK 4
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Deployment
Shift Handover standard training Training Shift Handover Standard PowerPoint 30 Mins LTL, Supervisors
Team
Deploy Shift Handover Standard Deployment Shift Handover Standard LTL PowerPoint 30 Mins LTL, Supervisors
PowerPoint,
problem
Unilever problem solving training Training Problem solving presentation/templets/examples UL Pillar Lead 60 Mins LT, LTC
solving board,
Excel
PowerPoint,
Problem solving deployment in Process problem
Deployment Problem solving presentation/templets/examples 60 Mins PE, WCM MGR
daily routine Engineer solving board,
Excel
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
38
WEEK 4 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
Scheduled stop
9.00 – 10.00
10.00 – 11.00
Conduct first problem
Training Embed problem solving solving session
11.00 – 12.00
Problem Solving into daily routine
12.00 – 13.00
Training
Weekly Tags and PM Shift Handover
13.00 – 14.00 Leadership Health Checks
Planning Meeting Deployment Shift
Handover
Daily Meeting Follow-Up
14.00 – 15.00
15.00 – 16.00
17.00 – 18.00
Night Shift
39
WEEK 5
40
WEEK 5
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
41
WEEK 5
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Multiple
CIL Standards for night shift Deployment session CIL Leading Practice, Existing CIL standards LTL Excel LTL, Supervisors
sessions
Deployment PowerPoint,
Weekly meeting preparation Training Weekly meeting training, templates 60 Mins LT
Team Excel
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
42
WEEK 5 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
Training
Breakdown elimination Define night shift CIL
10.00 – 11.00
activities
Breakdown Elimination
Design Training
11.00 – 12.00
Weekly Meeting
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
43
WEEK 6
44
WEEK 6
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
45
WEEK 6
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Deployment PowerPoint,
Weekly meeting deployment Deployment Session Weekly meeting WCM Leading Practice 240 Mins LT
Team Weekly Board
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
46
WEEK 6 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
Weekly meeting Weekly meeting
preparation preparation
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
47
WEEK 7
48
WEEK 7
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
49
WEEK 7
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
FT, EM,
Professional Maintenance Deployment
Training PM Training Powerpoint 30 Mins Maintenance
Training team
Planner
Professional Maintenance
Focused FT, Maintenance
Deployment Deployment work PM standards Excel, CMMS 240 mins
Technician Planner
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
50
WEEK 7 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
Training:
PM overview
10.00 – 11.00
PM deployment – update PM Deployment – update
standards standards
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
51
WEEK 8
52
WEEK 8
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
53
WEEK 8
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Deployment Changeover
Changeover SW - Deployment Deployment Changeover CBP, Changeover templates and checklist 60 Mins PE
team template
Deployment Powerpoint,
Link to cost deployment training Training 90-day plan training 30 mins LT
team Excel
Deployment Powerpoint,
Prepare 90-days plan Deployment 90-day plan training 120 mins LT
team Excel
Tools Related and Other
Activities
Process
Plan SMED workshop Working session SMED training Powerpoint 60 mins PE
Enginer
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Weekly Tags and Maintenance Weekly Maintenance Focused
Weekly Maintenance Schedule, Tags log Excel 60 mins FT, MP
Planning Planning Technician
Weekly meeting preparation Plan daily work KAI and KPI, problem statements
Line Team
Excel 60 mins LT 54
Lead
WEEK 8 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
Training:
Link to Cost deployment
Training:
10.00 – 11.00 Plan SMED workshop Preparation for link to cost
Changeover
deployment: data Prepare 90-day plan
collection and analysis
11.00 – 12.00 Changeover deployment
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
55
WEEK 9
56
WEEK 9
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
57
WEEK 9
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
58
WEEK 9 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
Training:
10.00 – 11.00
SMED
15.00 – 16.00
17.00 – 18.00
59
WEEK 10
60
WEEK 10
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
61
WEEK 10
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
62
WEEK 10 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
63
WEEK 11
64
WEEK 11
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
65
WEEK 11
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
66
WEEK 11 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
67
WEEK 12
68
WEEK 12
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
69
WEEK 12
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
70
WEEK 12 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
71
WEEK 13
72
WEEK 13
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
73
WEEK 13
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
74
WEEK 13 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
Preparation for
11.00 – 12.00
continuation planning
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
75
WEEK 14
76
WEEK 14
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
77
WEEK 14
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
78
WEEK 14 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
Preparation for
11.00 – 12.00
continuation planning
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
79
WEEK 15
80
WEEK 15
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
81
WEEK 15
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Factory
Continuation planning session Working session Sample roadmaps Powerpoint 60 Mins WCM MGR, FD
Director
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
82
WEEK 15 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
Continuation Planning
11.00 – 12.00
Session
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00
83
WEEK 16
84
WEEK 16
OVERVIEW
Tool/Work Process Deployed Key Activities Introduced Outcomes
85
WEEK 16
DETAILED WORK PLAN *Types
Tool/ Work
Process
Work Process Training and Workshop/workin
Line Stops
execution Learning g session
deployment
Work Process Related Activities Type* Material Lead Format Duration Core People
Factory
Continuation planning session Working session Sample roadmaps Powerpoint 60 Mins WCM MGR, FD
Director
Recurring Activities
Deployment
Line Daily Meeting Execute Daily Work Line Daily Meeting Coaching Points Meeting board 30 Mins LT, LTC, OM
Team
Deployment
Line Daily Meeting Follow-Up Execute Daily Work Line Daily Meeting Coaching Points Meeting board 15 Mins LT
Team
Excel
Leadership Health Checks Health Check Health Checks Leadership 30 Mins LT, LTC
checklist
Line Team
Weekly meeting preparation Plan daily work KAI and KPI, problem statements Excel 60 mins LT
Lead
86
WEEK 16 DRUMBEAT
Tool/ Work
Work Process Training and Workshop/workin
*Types Process Line Stops
execution Learning g session
deployment
Monday Tuesday Wednesday Thursday Friday
7.00 – 8.00
Line Daily Meeting
8.00 – 9.00 Leadership coaching zone
Scheduled stop
9.00 – 10.00
10.00 – 11.00
11.00 – 12.00
12.00 – 13.00
15.00 – 16.00
17.00 – 18.00