You are on page 1of 25

CURRICULUM VITAE

MR. REYAZ ANSARI

Date of birth : 7th May 1976 A-25, Moin Park


Nr. Bibi talave
Passport No. : R1639860 Vatva Narol Road-Vatva
Ahmedabad-382440
EDUCATIONAL QUALIFICATIONS:

Examination Board Year Of Discipline % of Marks Divn./Class


Passed Passing

S.S.C G.S.E.B. 1993 Science 45 II


Gandhinagar
I.T.I Visnagar 1994 Welder 70 I

DME A.G.S 2008 DME A I

SAFETY COURSES:
*IADC Well Cap ( Workover- Supervisory Level)
CERTIFICATE NO: 9B829B51-85DC81 {DATE:
1D3D6068-638108 15/03/2021
{DATE: TO 15/03/2023}
09/03/2023 TO 08/03/2025}
*Mines Vocational Trainee.
*First Aid Certificate.
*Fire Fighter Certificate.

NATURE OF WORK:
*Milling.
*Fishing with different types of tools.
*GP retrieves.
*Installed and lowering of GP assembly.
*Establish a proper communication between mud engineer and drilling crew and also to control water
and oil base mud.
*Proper Maintenance of shale –shaker, degasser, mud tank and also knowledge of Draw works and
travelling block.
*Worked on EOR affected wells in Mehsana field.
*CARRIED
*Carried outOUT COMMISSIONING
commissioning AND MAINTENANCE
and maintenances ACTIVITIES
activities of all the RIGS. OF ALL THE RIGS.
*Carried out commissioning of Rig model XJ-550 in MAYANMAR for Global Integrated services Ltd
Company.

PERSONAL INFORMATION:
Father’s name: Mohmmed Yasin Ansari
Nationality: Indian
Religion: Muslim
Marital Status: Married
Language known: English, Hindi & Gujrati

EXPERIENCE EXPOSURE:

 Company : Kingston Oilfield Services Pvt Ltd


 Design : RIG-INCHARGE
 Duration : May 2020 to TILL DATE
 Project : ONGC Ahmedabad.
 Rig type : SJ Petro-50 Ton
 Company : KRISSH DRILLING PVT LTD
 Design : RIG-INCHARGE
 Duration : Feb 2020- May 2020
 Project : ONGC Ahmedabad.
 Rig type : SJ Petro-50 Ton

 Company : G.T.C. Oil field services pvt ltd


 Design : RIG-INCHARGE
 Duration : JAN 2016- Feb 2020
 Project : ONGC Ahmedabad.
 Rig type : SJ Petro-50 Ton

 Company : G.T.C. Oil field services pvt ltd


 Design : NTP
 Duration : JUNE 2014- DEC 2015
 Project : CRAIN ENERGY, Barmer
 Rig type : SJ Petro-100 Ton

 Company : G.T.C. Oil field services pvt ltd


 Design : RIGINCHARGE
th
 Duration : 24 DECEMBER 2011 to Jan 2014
 Project : ONGC Ahmedabad.
 Rig type : SJ Petro-50 Ton

 Company : G.T.C. Oil field services pvt ltd


 Design : Driller
th
 Duration : 18 September 2008 to 23/12/2011
 Project : ONGC Ahmedabad.
 Rig type : SJ Petro-100 Ton

 Company : M/s B.S. Chaudhry & Co. Mehsana


 Design : Driller
th th
 Duration : 27 November 2006- 19 August 2008
 Project : ONGC, Mehsana Project
 Rig type : 50 Ton workover Rig

 Company : Mercantile Association


 Design : Asst Driller
th th
 Duration : 1 Febuary. 2006 to 29 September. 2006
 Project : Rajasthan Project
 Rig type : 50 Ton work over Rig

 Company : Arabian Drilling Co.


 Design : Rig Man
th
 Duration : 21 November 2005 to Three month.
 Rig type : Drilling Rig

 Company : John Energy Ltd


 Design : Asst Driller
th th
 Duration : 21 August 2003 to 15 August 2005.
 Project : Meshana Project.
 Rig type : 50 Ton work over rig.

 Company : John Energy Ltd


 Design : Derrick Man
th
 Duration : 1st Febuary 2000 to 20 August 2003.
 Project : Meshana Project.
 Rig type : 50 Ton work over rig

 Company : Dewanchand Ramsaran Industries (P) Ltd


 Design : Rig Man
th th
 Duration : 16 December 1997 to 25 January 1999.
 Project : Meshana Project.
 Rig type : 50 Ton work over rig
 Company : Dewanchand Ramsaran Industries (P) Ltd
 Design : Roust About
th th
 Duration : 13 January 1997 to 15 December 1997
 Project : Meshana Project.
 Rig type : 50 Ton work over rig

Place: Ahmedabad Yours Faithfully


Reyaz Ansari
Riyaz Ansari

20t
hDECEMBER,2021
2
951357/2021
Riyaz Ansari

21stDECEMBER,2021
2
951358/2021