Professional Documents
Culture Documents
$ RATE
INR
2 SHARE
Received
Bracelet for selvi
1295 To be given to Anna
781 To be given to Karthi
660 Jewel For Dhananyaa
1264 Bank of India
1047 Outside
2544 Car Tyre
Service
Bore reset
Total
Remaining
cake 6000
shamyana 7000
food 28000
decoration 2000
party hall 250
dress 4800
48050
17800 USD
70 INR
1246000
623000 Per Head
715000 1 2
100000 INR 2 4
93000 INR 3 8
65000 INR 4 16
8000 INR 5 32
50000 6 64
250000 7 128
14000 8 256
18800 9 512
24000 10 1024
622800 INR 11 2048
92200 INR 12 4096
13 8192
14 16384
15 32768
16 65536
17 131072
18 262144
19 524288
14363 20 1048576
7275 21 2097152
5147 22 4194304
6239 23 8388608
24 16777216
25 33554432
26 67108864
27 134217728
28 268435456
29 536870912
30 1073741824
TATA HARRIER
preparation.Standardization of
documents.Facility planning. 10
Process flow diagram, PFMEA,
Comments
What did I do well in the last
performance cycle (Please
provide tangible examples
related to work, wherever
possible)
Self
1/18/2021 10:51
I did well my best in Fuze 40
mm, PRF projects, BDL 3D part
development & Kia Windrow
regulator Proto Fixtures. I put
my best level of effort in
defense projects.
1/18/2021 10:51
1/18/2021 10:51
I enjoyed working in defense
projects because it is entirely
different concept from window
regulator and i face new
challenges while working. As
well as I enjoyed working in
development of Kia Proto
fixtures.
1/18/2021 10:51
I learned about new
requirements, concepts of
defense customer and
Concepts of functioning of
different types of Fuzes
1/18/2021 10:51
Pokayokes implemented by
using simple concept like fish
tank vacuum pump in
clockwork housing assembly
station. Crimping Punch
designed, Manufactured &
proved within 14 days for
modified retainer in F40mm
Fuze
1/18/2021 10:51
Self
1/18/2021 10:51
Yes, I was suggested to
improve my managerial skill
level for handling the complete
project. Because that will help
me for handling the projects
individually.
Self
1/18/2021 10:51
I would like to involve more in
Production activities to enhance
my job role.
Self
1/18/2021 10:51
Yes, I feel I am fully utilized in
defense projects & Window
regulator Projects.
1/18/2021 10:51
VOG 25, PRF, F40mm Self
destruction, Electronic Fuzes,
Kia Window regulator & Maruti
YFG Projects.
What are the areas where I
could have performed better
(Please provide tangible
examples related to work,
wherever possible)
Self
1/18/2021 10:51
Feedback on the
performance for the last
performance cycle -
Development area
Primary Approver
KASINATHAN M
20000270
1/19/2021 17:07
He is good in process
development activities and
process documents preparation
KASINATHAN M
20000270
1/19/2021 17:59
Overall comments
Primary Reviewer
AJAY WANI
20000491
2/12/2021 17:43
5. Punch for modified retainer of Fuze 40mm designed, manufactured and proved within two weeks of timeline.
Action Plan:
1. Assembly line facilities to be arranged for Practice Round Fuze within budget limit.
2. Assembly line modifications to be done for self distruction implementation in existing Fuze 40mm within budget lim
by using existing Fuze 40mm line facilities.
3. Proto line facilities to be arranged for VOG25 model fuzes within budget limit with existing facilities.
Achievements:
1. Fuze 40mm assembly line with complete tools and fixtures arranged within budget for mass production.
2. Practice Round Fuze samples assembled & submitted to customer within budget limit and proved.
3.Kia Final Checking Proto fixture design completed and manufactured with minimum investment and existing die se
modified for Caulking tool and proved.
ACTION PLAN:
Line rejection to be controlled.
ACHIEVEMENTS:
1. SMED & Pokayoke considered in all fixtures on design phase itself to control line rejections.
ACHIEVEMENTS:
PRF assembly for Proto samples done by using existing Fuze 40mm machines and fixtures.
Action Plan:
1. VOG25 assembly for Proto and production build to be accomodated in Fuze 40 mm line.
2. Assembly line for SD Mechanism with existing fuze 40mm to be arranged with existing line.
ACHIEVEMENTS:
1. Existing Die-set is modified for Guide rail caulking with support bracket of Kia Window regulator. (Approx. Saving
20,000/-)
Achievements:
Modified documents SOP & CP are completed for Fuze 40mm
Action Plan:
Managerial Skill to be developed.
Achievements:
Individually handling Fuze 40mm, PRF, VOG25 & 40mm SD projects.
Self Rating
4.5
4.5
4.5
4
Approver Rating
4
4
Objective
30
10
10
10
10
10
20
Comments
What did I do well in the last performance cycle
(Please provide tangible examples related to work,
wherever possible)
KASINATHAN M
20000270
1/19/2021 17:07
He is good in process development activities and process
documents preparation
His done Fuze 40 mm and PRF process development activities
and supporting window regulator fixture, gauge design
KASINATHAN M
20000270
1/19/2021 17:59
He should involve more machine development activities
He has to improve managerial skills
Overall comments
Primary Reviewer
AJAY WANI
20000491
2/12/2021 17:43
I encourage Dinesh to take up development activity for
Fuze.
What did I do well in the last performance cycle (Please provide tangible examples related to work, whereve
possible)
What do you see as your major achievement since the last review?
What projects have you enjoyed working on the most, and why?
What are some things you would have done differently looking back?
What has your Manager done to help you do your job better? What could they do differently?
Did you receive any feedback during the review period, either from your boss or your peers that resonated w
you? Why?
How do you feel you can enhance your job role? What additional responsibility would you like to take? Plea
give specific, realistic and relevant suggestions.
Do you feel you are being fully utilized in your current position? If not what suggestions do you have? Pleas
give specific, realistic and relevant suggestions.
What are the areas where I could have performed better (Please provide tangible examples related to work,
wherever possible)