GODREJ EMRALD –

GHODBUNDER ROAD,
THANE. Godrej Emerald
Location- Ghodbunder Road, Thane west.

Developers- Godrej Properties.


Godrej Emerald as a future residential
development in Thane, Ghodbunder Project ID : J290245011
road of Mumbai. Godrej Emerald
Thane is the 6.5 acres of the enormous Properties: Apartments / Flats
nest of splendid residences of distinct
designs and configurations. Completion Date: Mar, 2021

Jidnyasa Girade
PROBLEMS DURING CONSTRUCTION PHASE Roll no: 01
Sem 3 Date: 14/08/23
PROJECT DETAILS:

Units and Sizes:-


• 1.5 BHK - 43.64 Rera carpet area
• 2 BHK 57.68 Rera carpet area
• 3 BHK 76.78 Rera carpet area

Amenities of the project:-


1.5 BHK 2 BHK 3 BHK
• Club House
• Sports Facility
• Kids Play Area Interior Features:
• Swimming Pool • Woodwork
• Land scape/ Garden, • Modular Kitchen
• Park Fire Fighting Equipment • Feng Shu
• 24*7 Water supply • Vastu Complaint
• Car Parking
• Theatre Video
• Security

Project specification:-
• Earthquake resistant
• Vitrified Flooring
• Antiskid Ceramic Tiles

UNIT VIEWS SITE PLAN


COMMON PROBLEMS:
Managing problems in Construction involves
planning, organizing, an overseeing all aspects of
a construction project to ensure its successful
completion on time, within budget and meeting
POOR quality standards.
LACKING
COMMUNICATION
STRUCTURE

RISK
MANAGEMENT
UNREALISTIC TIME
EXPECTATIONS MANAGEMENT
LACKING
POORLY DEFINED
ACCOUNTIBILITY
GOALS

BUDGET LIMITED
CONSTRAINTS SKILLS
PROJECT SPECIFIC PROBLEMS:
Managing problems in Construction involves
planning, organizing, an overseeing all aspects of
Lack of a construction project to ensure its successful A well defined
communication completion on time, within budget and meeting departmental structure
quality will definitely POOR quality standards. is very essential and
effect the quality of LACKING lack of this leads to
COMMUNICATION
the output planned STRUCTURE uninvited problems
for the project. into the course

RISK
MANAGEMENT
UNREALISTIC TIME
EXPECTATIONS MANAGEMENT
LACKING
POORLY DEFINED
ACCOUNTIBILITY
GOALS

The challenge is to Taking ownership of


deal with unclear the task responsible to
BUDGET LIMITED
goals leading to you is a important
CONSTRAINTS SKILLS
potential mistakes quality that a team
or confusion among must have.
workers.
PROJECT PROBLEMS
PROBLEM: The earliest problem that occurred during the construction of one of the very first buildings was during the execution phase.
The excavation pit which was dug for the foundation and the piles for the column was not measured accurately and hence caused a big mistake
leading to change the plan about Foundation building.
The dimension around the pile foundation was not measured considering the PCC bed around the footing. And hence the Excavation pit
needed to be increased. But that too was not possible as the land after the pit was not allowed to be dug further.

The problem arrived was due to the POOR COMMUNICATION between


the design team and the Execution team. The co-ordination between them
could have helped to avoid such mistakes.

SOLUTION:
The Design Team came with the next possible thing that can be
changed to resolve the problem, and had and alternate Column
footing design.

The PCC bed had no place spread on the surface and hence the Depth
of the footing was increased to keep the strength and change the
design.
It was an KNOWLEDGE BASED solution .
PROJECT PROBLEMS
PROBLEM:
A geotechnical investigation is primarily concerned with testing the
physical properties of the soil, to provide recommendations for The GEOTECHNICAL TEAM carried out the examinations and test of the
foundation requirements, excavation stability, drainage and buried soil on the construction land before the planning of the bore hole
concrete design. position.
After the communication and planning it was found out that the soil
Bore holes -Workers excavate the soil layer by layer, often using a results were not appropriate.
circular motion to create a well-shaped hole. The process is slow and The position of Bore ole Number-3 was not appropriate as the soil
demanding, requiring teamwork and coordination. To prevent the walls quality changed abruptly.
from collapsing and to ensure water quality, the borehole is lined with
materials like bricks, stones, or concrete rings.

This method of boring is not suitable for very hard or cemented soils,
very soft soils, as then the flow into the hole can occur. This method is
also not suitable for fully saturated cohesionless soil.

The problem arrived was due to LACKING ABILITY , as the team was
unable to get appropriate results and got incorrect output.
Also there was LACKING ACCOUNTABILITY, after the problem was
found out, making the decision for the solution go further away.
SOLUTION:
After lot of permutations for the solution, no other method was as fast and money efficient
as the current one, and hence no Action was taken on this problem and kept unchanged
with the Damage on the work.
PROJECT PROBLEMS
PROBLEM: • The construction requirements were discussed and finalized between the contractor and the design team,
and as per them the sonstruction was supposed to be on a faster track.
• Flat Slabs were decided to be the best option to complete the construction on time.
• But later while on the INTERIOR PHASE the contractor came to the realization that for some apartments the Drainage slop required is not
present and hence would cause a problem for lot many other reasons too.

The problem arrived was due to POORLY DEFINED GOALS as the first phase did not
discuss about the interior bathroom need but discussed about the time constraints and
the solutions for that.

SOLUTION:
The solution for the problem was fulfilled by an equipment.
PUMP-11 was used for the pumping for water drainage
through the floor and was installed throughout in all
apartments.

PUMP JC 11-
The submersible drainage center-line pump JC 11 is ideal
for pumping water and dirty water mixed with light
abrasives. When delivered to a site you can start using
them right away. The low weight and compact design
ensure convenient transport, handling, and installation.

You might also like