Location- Ghodbunder Road, Thane west.
Jidnyasa Girade
PROBLEMS DURING CONSTRUCTION PHASE Roll no: 01
Sem 3 Date: 14/08/23
PROJECT DETAILS:
Project specification:-
• Earthquake resistant
• Vitrified Flooring
• Antiskid Ceramic Tiles
RISK
MANAGEMENT
UNREALISTIC TIME
EXPECTATIONS MANAGEMENT
LACKING
POORLY DEFINED
ACCOUNTIBILITY
GOALS
BUDGET LIMITED
CONSTRAINTS SKILLS
PROJECT SPECIFIC PROBLEMS:
Managing problems in Construction involves
planning, organizing, an overseeing all aspects of
Lack of a construction project to ensure its successful A well defined
communication completion on time, within budget and meeting departmental structure
quality will definitely POOR quality standards. is very essential and
effect the quality of LACKING lack of this leads to
COMMUNICATION
the output planned STRUCTURE uninvited problems
for the project. into the course
RISK
MANAGEMENT
UNREALISTIC TIME
EXPECTATIONS MANAGEMENT
LACKING
POORLY DEFINED
ACCOUNTIBILITY
GOALS
SOLUTION:
The Design Team came with the next possible thing that can be
changed to resolve the problem, and had and alternate Column
footing design.
The PCC bed had no place spread on the surface and hence the Depth
of the footing was increased to keep the strength and change the
design.
It was an KNOWLEDGE BASED solution .
PROJECT PROBLEMS
PROBLEM:
A geotechnical investigation is primarily concerned with testing the
physical properties of the soil, to provide recommendations for The GEOTECHNICAL TEAM carried out the examinations and test of the
foundation requirements, excavation stability, drainage and buried soil on the construction land before the planning of the bore hole
concrete design. position.
After the communication and planning it was found out that the soil
Bore holes -Workers excavate the soil layer by layer, often using a results were not appropriate.
circular motion to create a well-shaped hole. The process is slow and The position of Bore ole Number-3 was not appropriate as the soil
demanding, requiring teamwork and coordination. To prevent the walls quality changed abruptly.
from collapsing and to ensure water quality, the borehole is lined with
materials like bricks, stones, or concrete rings.
This method of boring is not suitable for very hard or cemented soils,
very soft soils, as then the flow into the hole can occur. This method is
also not suitable for fully saturated cohesionless soil.
The problem arrived was due to LACKING ABILITY , as the team was
unable to get appropriate results and got incorrect output.
Also there was LACKING ACCOUNTABILITY, after the problem was
found out, making the decision for the solution go further away.
SOLUTION:
After lot of permutations for the solution, no other method was as fast and money efficient
as the current one, and hence no Action was taken on this problem and kept unchanged
with the Damage on the work.
PROJECT PROBLEMS
PROBLEM: • The construction requirements were discussed and finalized between the contractor and the design team,
and as per them the sonstruction was supposed to be on a faster track.
• Flat Slabs were decided to be the best option to complete the construction on time.
• But later while on the INTERIOR PHASE the contractor came to the realization that for some apartments the Drainage slop required is not
present and hence would cause a problem for lot many other reasons too.
The problem arrived was due to POORLY DEFINED GOALS as the first phase did not
discuss about the interior bathroom need but discussed about the time constraints and
the solutions for that.
SOLUTION:
The solution for the problem was fulfilled by an equipment.
PUMP-11 was used for the pumping for water drainage
through the floor and was installed throughout in all
apartments.
PUMP JC 11-
The submersible drainage center-line pump JC 11 is ideal
for pumping water and dirty water mixed with light
abrasives. When delivered to a site you can start using
them right away. The low weight and compact design
ensure convenient transport, handling, and installation.