The document contains the daily maintenance plan for a 1x60 MW coal power plant in Kutch Chemicals Industries Ltd in Gandhidham. It lists the equipment and areas requiring maintenance, planned maintenance jobs for each shift including tasks like filter panel cleaning, impact idler repairing, and fabrication works. It also includes a list of pending maintenance jobs to be completed.
The document contains the daily maintenance plan for a 1x60 MW coal power plant in Kutch Chemicals Industries Ltd in Gandhidham. It lists the equipment and areas requiring maintenance, planned maintenance jobs for each shift including tasks like filter panel cleaning, impact idler repairing, and fabrication works. It also includes a list of pending maintenance jobs to be completed.
The document contains the daily maintenance plan for a 1x60 MW coal power plant in Kutch Chemicals Industries Ltd in Gandhidham. It lists the equipment and areas requiring maintenance, planned maintenance jobs for each shift including tasks like filter panel cleaning, impact idler repairing, and fabrication works. It also includes a list of pending maintenance jobs to be completed.
2 TG HOTT WELL PP-1 3 CHP BC-3 4 CHP OLD IDLER 5 CHP STREAM-1A 6 BOILER FIRE HYDRANT LINE 7 TG 5Mtr AHU 8 BOILER ID/SA FAN 9 BOP INST AIR COMP-1,2,3 10 BOILER ID/PA/SA-1
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOP AHU -5 Mtr 13 BOILER SPARE 14 CHP CRUSHER-1B 15 BOILER SPARE 16 BOP FIRE PP HOUSE 17 TG TG BUILDING 18 TG AHU 19 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM BC-3 RECEIVING CHUTE WELDING WORK IMPACT IDLER REPAIRING WORK PRIMARY SCREEN/CRUSHER/FLIP FLOW-1A PM BOILER AREA FIRE HYDRANT LINE FABRICATION WORK ALIGNMENT & TRIAL WORK BEARING HOUSING AIR COOLING LINE FIXING WORK SUCTION FILTER CLEANING WORK GREASING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. 5 mtr AHU blower base frame replacement. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. D, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D FITTER D MRM/RS CONST D FITTER D AMRESH D FITTER D FITTER N DAILY MAINTENANCE P 1X 60 MW CPP KUTCH CHEMICALS INDUS
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP SCREW COMP. 1A 3 CHP OLD IDLER 4 CHP STREAM-1B 5 BOILER FIRE HYDRANT LINE 6 CHP BELT 7 BOILER ID/PA/SA-2
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
A000Hrs RUNNING KIT REPLACEMENT WORK IMPACT IDLER REPAIRING WORK PRIMARY SCREEN/CRUSHER/FLIP FLOW-1B PM BOILER AREA FIRE HYDRANT LINE FABRICATION WORK BELT COILER MACHINE FABRICATION WORK GREASING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. D, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D MRM/RS CONST D ALPESH/AMRESH D FITTER N DAILY MAINTENANCE P 1X 60 MW CPP KUTCH CHEMICALS INDUS
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP SCREW COMP. 1A 3 CHP OLD IDLER 4 BOILER DAMPER 5 BOILER FIRE HYDRANT LINE 6 TG & BOILER HOUSE KEEPING 7 CHP BELT 8 BOP CT FAN-2
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
4000Hrs RUNNING KIT REPLACEMENT WORK IMPACT IDLER REPAIRING WORK ALL DAMPER BEARING GREASING WORK BOILER AREA FIRE HYDRANT LINE FABRICATION WORK HOUSE KEEPING BELT COILER MACHINE FABRICATION WORK PM
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. D, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D MRM/RS CONST D FITTER/HELPER D ALPESH/AMRESH D FITTER N DAILY MAINTENANCE P 1X 60 MW CPP KUTCH CHEMICALS INDUS
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP IAC-1 3 CHP COAL SHED 4 CHP BC-2&3 5 BOILER FIRE HYDRANT LINE 6 CHP BELT 7 TG & BOILER HOUSE KEEPING 8 ACC/BOP CEP/PROCESS LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
HP SIDE SHAFT GLAND REPLACEMENT SPRINKLER BALL VALVE REMOVING WORK VGT BOX TOP PLATE WELDING WORK BOILER AREA FIRE HYDRANT LINE FABRICATION WORK BELT COILER MACHINE FABRICATION WORK HOUSE KEEPING ONLINE LEACKAGE ARRESTING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. D, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D JANA D MRM/RS CONST D ALPESH/AMRESH D FITTER/HELPER D/N JANA/VENDOR D DAILY MAINTENANCE P 1X 60 MW CPP KUTCH CHEMICALS INDUS
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOILER BED ASH COOLER-1&2 3 CHP BC-2&3 4 BOILER FIRE HYDRANT LINE 5 CHP BELT 6 TG & BOILER HOUSE KEEPING 7 ACC/BOP CEP/PROCESS LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SURGE HOPPER WINDOW FABRICATION FOR CLEANING PURPOSE VGT BOX TOP PLATE WELDING WORK BOILER AREA FIRE HYDRANT LINE FABRICATION WORK BELT COILER MACHINE FABRICATION WORK HOUSE KEEPING ONLINE LEACKAGE ARRESTING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. D, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D MRM D JANA D MRM/RS CONST D ALPESH/AMRESH D FITTER/HELPER D/N JANA/VENDOR D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOILER BED ASH COOLER-1&2 3 BOILER FIRE HYDRANT LINE 4 CHP BELT 5 TG & BOILER HOUSE KEEPING
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SURGE HOPPER WINDOW FIXING FOR CLEANING PURPOSE BOILER AREA FIRE HYDRANT LINE FABRICATION WORK BELT COILER MACHINE FABRICATION WORK HOUSE KEEPING
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D MRM D MRM/RS CONST D ALPESH/AMRESH D FITTER/HELPER/MRM/JANA D/N DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOILER BED ASH COOLER-1&2 3 CHP BC-1 4 BOILER ID/SA FAN 5 BOILER BED DRAIN 6 CHP BELT 7 TG & BOILER HOUSE KEEPING 8 TG TG BUILDING
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SURGE HOPPER WINDOW FIXING FOR CLEANING PURPOSE PM BEARING AIR COOLING LINE FIXING AIR BLASTER SERVICE AIR HEADER FIXING WORK BELT COILER MACHINE FABRICATION TRIAL WORK HOUSE KEEPING TG BUILDING WINDOW MESH FIXING
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D MRM D FITTER D MRM D MRM D ALPESH/AMRESH D FITTER/HELPER/MRM/JANA D/N JANA D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-2 3 CHP BC-1 BOP ACW-1 5 BOILER BED DRAIN CHP BC-3 7 TG & BOILER HOUSE KEEPING 4 BOILER ID/SA FAN
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG TG BUILDING 17 TG AHU 18 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM PIN BUSH COUPLING REPLACEMENT & ALIGNMENT WORK PM AIR BLASTER SERVICE AIR HEADER FIXING WORK RECEIVING CHUTE SPOOL PIECE FABRICATION WORK HOUSE KEEPING BEARING AIR COOLING LINE FIXING
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. TG building window mess fixing. 17 mtr Drain line replacement work. 17 mtr AHU door repairing work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D MRM D JANA D FITTER/HELPER/MRM/JANA D/N MRM D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-3 3 CHP BC-2 4 BOP ACW-2 5 BOP RAW WATER PP-1 6 BOILER BED DRAIN 7 CHP BC-3 8 TG & BOILER HOUSE KEEPING 9 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM OLD BELT ROLLING WORK PM PM AIR BLASTER SERVICE AIR HEADER FIXING WORK RECEIVING CHUTE SPOOL PIECE FABRICATION WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D JANA D FITTER D FITTER D MRM D JANA D FITTER/HELPER/MRM/JANA D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-4 3 CHP BC-2 4 BOP ACW-3 5 BOP RAW WATER PP-2 6 BOP FIRE HP-1 7 BOILER BED DRAIN 8 TG & BOILER HOUSE KEEPING 9 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM OLD BELT ROLLING WORK PM PM NDE SIDE SLEEVE REPLACEMENT WORK AIR BLASTER SERVICE AIR HEADER FIXING & TB MOUNTING FRAME FIXING WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D JANA D FITTER D FITTER D FITTER D MRM D FITTER/HELPER/MRM/JANA D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-4 3 CHP STREAM-1A/1B 4 BOILER DCF-1,2,3 5 BOP RAW WATER PP-3 6 BOP FIRE HP-1 7 BOILER BED DRAIN 8 TG & BOILER HOUSE KEEPING 9 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM GREASING WORK GREASING & CHAIN OILING WORK PM NDE SIDE SLEEVE REPLACEMENT WORK AIR BLASTER SERVICE AIR HEADER FIXING & TB MOUNTING FRAME FIXING WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D FITTER D FITTER D MRM D FITTER/HELPER/MRM/JANA D/N RS CONST D DAILY MAINTENAN 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-5 3 CHP BC-2 4 BOP DM TP-1 & 2 5 ACC 203-A & B 6 BOP FIRE HP-1 7 TG & BOILER HOUSE KEEPING 8 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU 17 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM RETURNED SELF ALIGNMENT FRAME FIXING WORK PM BOTH FAN MIDDLE HOIST PLATEFORM FABRICATION WORK NDE SIDE SLEEVE REPLACEMENT WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D MRM D FITTER D FITTER D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP RBF-1 3 CHP FF-1A 4 CHP BUNKER FLOOR 5 BOP FIRE HP-1 6 ELE ELE DEPT 7 TG & BOILER HOUSE KEEPING 8 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU 17 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
CARRYING SIDE SELF ALIGNMENT FRAME FIXING WORK(HOT WORK) INSPECTION WORK HAND RAILLING FIXING WORK NDE SIDE SLEEVE REPLACEMENT WORK CABLE TRENCH COVERYING WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER/JANA D VENDOR/FITTER D JANA D FITTER D MRM D FITTER D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP CLARIFIER WP-1 3 CHP FF-1A 4 CHP BC-6 & VF-4&5 5 BOP FIRE JP-1 6 ELE ELE DEPT 7 BOP CBM 8 TG & BOILER HOUSE KEEPING 9 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 BOP FIRE PP HOUSE 16 TG AHU 17 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM INSPECTION WORK PM SPIDER REPLACEMENT WORK CABLE TRENCH COVERYING WORK VIBRATION READING TAKEN HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing Fire HP pump sleeve replacement. 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D VENDOR/FITTER D FITTER D FITTER D MRM D D FITTER D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP CLARIFIER WP-2 3 BOP DM TP-2 4 BOILER WALL SEAL BLOWER-2 5 BOP FIRE JP-1 6 ELE ELE DEPT 7 TG 5Mtr 8 ACC ACC FAN 9 TG & BOILER HOUSE KEEPING 10 BOILER FIRE LINE
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 TG TG BUILDING 8 BOILER WALL SEAL BLOWER 9 BOP BOP 10 BOILER BOILER 11 BOP AHU -17 Mtr 12 BOILER SPARE 13 CHP CRUSHER-1B 14 BOILER SPARE 15 TG AHU 16 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM INSPECTION WORK PM COUPLING REPLACEMENT & ALIGNMENT WORK CABLE TRENCH COVERYING WORK GUIDE IDLER FABRICATION WORK FINS CLEANING WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Rain gutter joint fixing work in TG building. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D FITTER D MRM D FITTER D FITTER N FITTER D/N RS CONST D DAILY MAINTENANCE 1X 60 MW CPP KUTCH CHEMICALS IND
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 BOP CLARIFIER WP-3 3 BOP WASTE WATER PUMP 4 ELE ELE DEPT 5 TG 5MTR 6 TG & BOILER HOUSE KEEPING 7 BOILER FIRE LINE 8 BOILER SA FAN-1,2 9 CHP BC-4 10 AHP FLY ASH SILO
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 TG AHU 15 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM PM CABLE TRENCH COVERING WORK GUIDE IDLER FABRICATION WORK HOUSE KEEPING FIRE LINE MODIFICATION WORK DE & NDE BEARING COOLING LINE FIXING WORK BC-4 STRUCTURE TIE FABRICATION WORK ASH CONDITIONER LINE PNEUMATIC VALVE FIXING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work NG LTD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D MRM D FITTER D FITTER D/N RS CONST D MRM D JANA D JANA D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP BC-1F & 2F 3 AHP BIN VENT FILTER, BLOWER FILTER 4 BOP AIR DRYER-1 5 TG 5MTR 6 BOILER FIRE LINE 7 BOILER SA FAN-1,2 8 CHP BC-2 9 TURBINE HP HEATER-1 10 ELEC. DEPT. GIS
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 TG AHU 15 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM FILTER CLEANING WORK FILTER CLEANING WORK GUIDE IDLER FABRICATION WORK FIRE LINE MODIFICATION WORK DE & NDE BEARING COOLING LINE FIXING WORK BC-3 TO BC-2 CHUTE SKIRT RUBBER MODIFICATION WORK PRV PASSING CHECKING WORK CABLE TRENCH COVER PLATE FIXING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D FITTER D RS CONST D MRM D JANA/JADAV D FITTER D MRM D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP RBF-1 & 2 3 CHP FLIP FLOW-1A 4 TG 5MTR 5 BOILER FIRE LINE 6 ELEC. DEPT. GIS 7 BOP INST COMP.1,2,3 8 BOILER SPARE WALL SEAL BLOWER
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 TG DRAIN LINE 15 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
PM NEW PU MAT FIXING TO CHECK GUIDE IDLER FABRICATION WORK FIRE LINE MODIFICATION WORK CABLE TRENCH COVER PLATE FIXING WORK SUCTION FILTER CLEANING WORK DISMANTLING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D JADAV/TUSHAL D FITTER D RS CONST D MRM D FITTER D ALPESH D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP OLD FLIP FLOW 3 BOILER FIRE LINE 4 ELEC. DEPT. GIS 5 CHP PRIMARY SCREEN-1A 6 BOILER SPARE WALL SEAL BLOWER 7 CHP BC-4 8 AHP FLY ASH SILO
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 TG DRAIN LINE 15 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SHAFT REMOVING WORK FIRE LINE MODIFICATION WORK CABLE TRENCH COVER PLATE FIXING WORK SIDE SKIRT RUBBER FIXING & SIDE DOOR FIXING WORK MAINTENANCE WORK BEND PULLEY HUB COLLAR WELDING WORK SPOUT CLOTH REPAIRING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing 17 mtr Drain line replacement work. boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D RS CONST D MRM D JADAV/JANA D FITTER D JANA D FITTER D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP OLD FLIP FLOW 3 BOILER FIRE LINE 4 TG 17 MTR. ALL DRAIN LINES 5 CHP ALL DEFECTS 6 BOILER SPARE WALL SEAL BLOWER 7 CHP BC-4 8 AHP FLY ASH SILO 9 BOP CT FAN-2
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SHAFT REMOVING WORK FIRE LINE MODIFICATION WORK DRAIN LINE MODIFICATION WORK RECTIFICATION WORK MAINTENANCE WORK BEND PULLEY HUB COLLAR WELDING WORK SPOUT CLOTH REPAIRING WORK PM
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D RS CONST D MRM D FITTER D FITTER D SUDISH/JANA D FITTER D FITTER N DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP OLD FLIP FLOW 3 BOILER FIRE LINE 4 TG 17 MTR. ALL DRAIN LINES 5 CHP ALL DEFECTS 6 CHP STREAM-1A 7 AHP FLY ASH SILO 8 BOP CT FAN-3 9 BOP CLARIFIER PUMP-2 10 CHP PRIMARY SCREEN-1A & 1B
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOILER WALL SEAL BLOWER 8 BOP BOP 9 BOILER BOILER 10 BOP AHU -17 Mtr 11 BOILER SPARE 12 CHP CRUSHER-1B 13 BOILER SPARE 14 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SHAFT REMOVING WORK FIRE LINE MODIFICATION WORK DRAIN LINE MODIFICATION WORK RECTIFICATION WORK GREASING WORK SPOUT CLOTH REPAIRING WORK PM ALIGNMENT CHECKING WORK INSPECTION DOOR WELDING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. Wall seal blower gear box readiness work PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D RS CONST D MRM D FITTER D FITTER D FITTER D FITTER N ALPESH D JANA D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
Sl. No. Area Name of Equipment
1 BOP SCREW COMP. 1A & 1B
2 CHP OLD FLIP FLOW 3 BOILER FIRE LINE 4 TG 17 MTR. ALL DRAIN LINES 5 CHP STREAM-1A 6 BOP CT FAN-3 7 BOP CLARIFIER PUMP-2 8 CHP RBF-1 9 CHP BC-1,2 10 BOP SCREW COMP. 1A 11 AHP ESP 1ST FIELD
Sl. No. Area Name of Equipment
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 BOILER APH 5 ACC ALL FAN 6 BOP RAW & CLARIFIER WP 7 BOP BOP 8 BOILER BOILER 9 BOP AHU -17 Mtr 10 BOILER SPARE 11 CHP CRUSHER-1B 12 BOILER SPARE 13 BOILER BUNKER FLOOR DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
BEARING REMOVING & SHAFT SHIFTING WORK FIRE LINE MODIFICATION WORK DRAIN LINE MODIFICATION WORK GREASING WORK PM ALIGNMENT CHECKING WORK COUPLING CHECKING IMPACT & CARRYING ROLLER REPLACEMENT WORK SUCTION FILTER, COOLER FINS CLEANING WORK CONVEYING LINE BOOSTER VALVE FABRICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK BED ASH COOLER TO APH DUCT DAMPER AREA PLATEFORM FABRICATION ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D RS CONST D MRM D FITTER D FITTER N ALPESH D FITTER D FITTER D FITTER D MRM D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 ACC ALL FAN 5 BOP RAW & CLARIFIER WP 6 BOP BOP 7 BOILER BOILER 8 BOP AHU -17 Mtr 9 BOILER SPARE 10 CHP CRUSHER-1B 11 BOILER SPARE 12 BOILER BUNKER FLOOR 13 BOP PH DOSING 14 AHP BED ASH SILO DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
BOTH OIL COOLER CLEANING WORK UPPER OIL COOLER COOLING WATER LINE PIN HOLE LKG ARRESTING WORK REDINESS WORK GREASING WORK OPERATING FLOOR PLATE FORM FABRICATION WORK STRUCTURE FABRICATION WORK FIRE LINE MODIFICATION WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work PH DOSING SYSTEM RE-LOCATING SCREENING M/C FIXING WORK G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D MRM D FITTER D FITTER N MRM D JANA D RS CONST D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 ACC ALL FAN 5 BOP RAW & CLARIFIER WP 6 BOP BOP 7 BOILER BOILER 8 BOP AHU -17 Mtr 9 BOILER SPARE 10 CHP CRUSHER-1B 11 BOILER SPARE 12 BOILER BUNKER FLOOR 13 BOP PH DOSING 14 AHP BED ASH SILO DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
BOTH OIL COOLER CLEANING WORK UPPER OIL COOLER COOLING WATER LINE PIN HOLE LKG ARRESTING WORK READINESS WORK GREASING WORK OPERATING FLOOR PLATE FORM FABRICATION WORK STRUCTURE FABRICATION WORK FIRE LINE MODIFICATION WORK TAIL END BEARING GREASING & CHAIN OILING WORK V-BELT REPLACEMENT WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work PH DOSING SYSTEM RE-LOCATING SCREENING M/C FIXING WORK G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D MRM D FITTER D FITTER N MRM D JANA D RS CONST D FITTER D FITTER D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 ACC ALL FAN 5 BOP RAW & CLARIFIER WP 6 BOP BOP 7 BOILER BOILER 8 BOP AHU -17 Mtr 9 BOILER SPARE 10 CHP CRUSHER-1B 11 BOILER SPARE 12 BOILER BUNKER FLOOR 13 BOP PH DOSING 14 AHP BED ASH SILO DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
GREASING WORK IAC OVER HAULING & AIR COOLER CLEANING WOK READINESS WORK OPERATING FLOOR PLATE FORM FABRICATION WORK STRUCTURE FABRICATION WORK FIRE LINE MODIFICATION WORK DE BOTTOM SIDE SPRING REPLACEMENT WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work PH DOSING SYSTEM RE-LOCATING SCREENING M/C FIXING WORK G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D FITTER D MRM D JANA D RS CONST D FITTER D DAILY MAINTENANC 1X 60 MW CPP KUTCH CHEMICALS IN
1 BOP WASTE WATER 2 ACC ACC FINS 3 CHP BC-4 4 ACC ALL FAN 5 BOP RAW & CLARIFIER WP 6 BOP BOP 7 BOILER BOILER 8 BOP AHU -17 Mtr 9 BOILER SPARE 10 CHP CRUSHER-1B 11 BOILER SPARE 12 BOILER BUNKER FLOOR 13 BOP PH DOSING 14 AHP BED ASH SILO DAILY MAINTENANCE PLANNING 1X 60 MW CPP KUTCH CHEMICALS INDUSTRIES LTD, GANDHIDHAM
Description of Maintenance Job
FILTER PANEL CLEANING WORK
SPARE ACC OIL PUMP REDINESS WORK IAC OVER HAULING & AIR COOLER CLEANING WOK SELF ALIGNMENT FRAME GUIDE ROLLER FABRICATION WORK OPERATING FLOOR PLATE FORM FABRICATION WORK STRUCTURE FABRICATION WORK FIRE LINE MODIFICATION WORK HAND RAILING PIPE WELDING WORK
List of Pending Jobs
WASTE WATER LINE NEAR ACC EXTENSION NEEDED ACC LHS Area Spray Line Erection BC-4 HEAD STRUCTURE TIE WORK ALL FAN HUB BOTTOM GRATING WELDING WORK Raw water pump and clarifier pump rubber bellow replacement work. PAP condensate line insulation COD vent valve replacement 17 mtr AHU leakage repairing. SRSB gear box repair and readiness. Crusher pulley balancing PA and ID fan rotor repair and balancing boiler bunker floor handrailing fixing work PH DOSING SYSTEM RE-LOCATING SCREENING M/C FIXING WORK G TD, GANDHIDHAM Type of Maintenance Job planned in Shift Job FITTER D FITTER D FITTER D/N FITTER D MRM D JANA D RS CONST D MRM D