Professional Documents
Culture Documents
PLANT VISIT REPORT FOR OBSERVING THE EXIT FLUE GAS TEMPERATURE HIGH
IN THE AIR PREHEATER
TYPE CFBC
MCR 53 TPH
OBSERVATION:
➢ Usage of yard stock coal of Indonesian & South African having more fines and after crushed
coal also found is higher.
➢ Difference of O2 level found in LHS & RHS in which is higher than the LHS.
➢ Existing replaced SAPH & PAPH blocks were found in tubes blockage and corrosive
condition.
➢ Start up vent slight passing
➢ Un burnt coal fines in fly ash found in the ESP due to secondary firing is happening.
➢ Bed temperatures are maintaining well below 900°C.
➢ Furnace temperature also maintaining and matching with existing of the same at full load
operation.
➢ Loop seal Total air flow is higher side as per existing record of before shutdown.
➢ Difference found in the Dip leg and Riser leg of Loop seal height.
➢ Air ingression found in the RHS Economiser header seal box area.
➢ Level variation in the Deaerator as per records. No steady level.
➢ Water chemistry parameter of Boiler water PH is maintaining as 9.5 instead of 9.8 to 10.2
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL
ACTION TO BE TAKEN:
➢ 30 % Usage coal of South African coal can be replaced with Indian coal and Indonesian coal
can be used as the same 70 %.
➢ If both side instrument is correct, Air ingression to be sealed properly.
➢ Pressure difference has to be checked frequently in the new installed APH in which tubes
may be getting build up of Soot or Scales and the O2 level also.
➢ Check the conditions of Isolation valve and Control valve also.
➢ Feed coal fines to be controlled by adjusting the crusher gap without affecting another belt
conveyor overloading and modulation of air flow in the Loop seal & Tertiary air. Both Cyclone
exit path to be checked.
➢ Loop seal air flow to be controlled by giving through Root blower and check the proper
isolation of the inter connection line valves for the PA & SA.
➢ Height of Dip leg is very important. Dip leg shall be always more than the Riser leg. Also Dip
leg air velocity shall be lower than the Riser leg.
➢ All air ingression of RHS Economizer should be sealed by ceramic wool properly..
➢ Bed ash iron to be minimized by adding fresh bed material with <1% of iron and also using of
recycled bed materials iron which should be separated to minimize < 2% by magnetic
separator.
➢ Deaerator level should be steady. ARC Valve condition of all the existing feed pumps to be
checked.
➢ As per the recommendation of Thermax, who is supplying the chemicals.
➢ Compressed air bypassing to be checked in all the SOV of the ultrasonic soot blower.
➢ Un insulated area of flue gas outlet duct to the entry of Cyclone is to be corrected.
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL
➢ Bed height of PA was increased from 850 mmWC to 870 mmWC. No variation.
➢ PA Fans discharge pressure was decreased 1150 mmWC to 1100 mmWC. No improvement.
ALL PARAMETERS OF THE BOILER TAKEN FROM THE BEFORE & AFTER SHUTDOWN:
68 LOOP SEAL TOTAL AIR FLOW M3/HR 1164 1156 1281 1193
69
LOOP SEAL DIS.PRESSURE MMWC 0.2 0.2 0.2 0.2
70
COMBUSTION DRAFT MID (L/R) MMWC 0/-2 0/-4 0/-2 0/-1
71
CYCLONE DRAFT (L/R) MMWC -4 -3 -1 1/-1
72
ECO. INLET DRAFT (L/R) MMWC -101 -100 -143 -182
73
HOT APH DRAFT I/L MMWC -170 -171 -176 -189
74
COLD APH DRAFT O/L MMWC -211 -205 -216 -214
75 ESP INLET DRAFT MMWC -205 -208 -225 -218
76 ESP OUTLET DRAFT MMWC -245 -242 -251 -253
77
BFP SPEED RPM 2840 2850 2580 2813
78
C/D POWER CONSUMPTION KW 320 325 224/227 320
79
BFP 3/4 STRAINER DP MMWC 700 790 514/463 790
80 PA FAN I/L DAMPER OPEN (A/B) % 100/100 100/100 100/100 100/100
81
PA FAN O/L DAMPER OPEN (A/B) % 90/90 91/92 87/87 87/92
82
PA FAN A SPEED/CURRENT RPM/AMPS 2675/198 2706/200 2621/194 2595/189
83
PA FAN B SPEED/CURRENT RPM/AMPS 2822/164 2749/202 2624/188 2731/154
84
SA FAN I/L DAMPER OPEN (A/B) % 100/100 100/100 100/100 100/100
85
SA FAN O/L DAMPER OPEN (A/B) % 75/76 76/77 76/76 74/74
86
SA FAN A SPEED/CURRENT RPM/AMPS 2284/99 2295/97 2279/106 2216/98
87 SA FAN B SPEED/CURRENT RPM/AMPS 2119/81 2364/101 2322/101 2259/97
88 ID FAN I/L DAMPER OPEN (A/B) % 77/78 79/76 79/79 76/77
89
ID FAN A SPEED/CURRENT RPM/AMPS 765/154 775/156 775/164 745/152
90
ID FAN B SPEED/CURRENT RPM/AMPS 763/152 744/145 774/153 754/148
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL
PARAMETERS LEFT
O2 4.3
CO 136
CO2 14.4
EX.AIR 25
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL
PARAMETERS FIRST
O2 5.0
CO 138
CO2 14.1
EX.AIR 27
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL
PA OUTLET COMMON DUCT (LEFT SIDE) TAKEN FROM THE LOCAL TEMPERATURE GAUGE:
❖ Standby equipments of PA Fan, SA Fan and Root blower to be changed over as per
schedule.
❖ PA air flow shall be adjusted to provide minimum fluidization which shall be better
combustion, as per load.
❖ Also SA shall be adjusted to maximum penetration so that there shall be adequate reaction
of O2 with fuel.
❖ SA pressure high is required for better mixing of combustion.
❖ Provided Sealing air to coal feeders to be checked properly.
❖ Returned the fly ash grains up to 90 microns shall be checked regularly from the Loop
seal/Cyclone.
❖ Ensure for maintaining the temperature profiles within the specified range is very important.
❖ Addition of Fresh bed materials frequency should be increased to control the iron & shell.
Client M/s. RAYALASEEMA HI STRENGTH HYPO LIMITED, KURNOOL