You are on page 1of 29

SH 6 Aesthetics

Potential Landscape and Aesthetic Design

July 12,
July 2023
12, 2023 1
Table of contents
1 General Information

2 Proposed Bridge Aesthetics

3 Aesthetic Planting Concept

4 Proposed Landscape Summary

5 Proposed Intersection Plantings

6 Proposed Tree Planting Aesthetics

7 Proposed Wildflower Aesthetics

8 Proposed Grass Aesthetics

9 Interchange Applications

July 12, 2023 2


General Information

July 12, 2023 3


Proposed Bridge Aesthetic
Column style at
 Bridge columns and MSE Walls inspired by bridge at Rock Texas Ave.
Prairie Road on SH 6 intersection

 Columns protected by CTB or outside of clear zone.


 Texas Ave. intersection incorporates existing columns but
matches proposed.

July 12, 2023 4


Aesthetic Planting Concept
 There are 4 major types of plantings proposed for this
corridor
 Intersection Plantings
 Tree Plantings
 Wildflower Plantings
 Native Grass Plantings

 Larger aesthetic plantings are proposed for


intersections only and are outside of clear zones

 Wildflowers are limited to interior ROW and by clear


zone. Wildflowers to be placed after standard seed mix
is placed.

Intersection at University

TxDOT Standard Seed Mix


TxDOT Standard Seed Mix + Wildflower Mix
Native Grasses
Tree
Intersection Plantings
Clear Zone July 12, 2023 5
Proposed Landscape Summary of Work

Maintenance
Installation Installation Cost Cost Maintenance AFA w/ City LMA w/ City
Area Aesthetic Treatment Performed by paid by paid by Frequency Required? Required?
TxDOT's
1 Intersection Plantings City City 1 effort/quarter Yes Yes
Contractor

2 TxDOT's
TxDOT Standard Grass (Edges) TxDOT TxDOT 3 mow/year No No
Contractor

3a TxDOT's
3a Trees, TxDOT Standard Grass, & Wildflowers TxDOT City 1 mow/year No Yes
Contractor

Trees, TxDOT Standard Grass, & Wildflowers TxDOT's


3b
3b TxDOT TxDOT 1 mow/year No No
(with Fewer Trees) Contractor

44 TxDOT's
Native Grass TxDOT TxDOT 1 mow/year No No
Contractor

2
1

3b 4
3a

July 12, 2023 6


Proposed Intersection Plantings

 Smaller more ornamental


plantings

 Meet sight distance and clear


zone requirements

 Contained by buffer mow strip

 Only proposed if Cities plan to


maintain (via an executed LMA).

July 12, 2023 7


Proposed Tree Planting Aesthetics

 The intent of the design is to create


a planting that mimics a naturally
forested area.

 3a Design- proposed Design with


City participation.

 3b Design- proposed Design if


TxDOT Funded/Maintained alone.

 Tree plantings are proposed at major 3b


3a
intersections with available space outside of
clear zone.

 Trees will be planted in a random placing but


will maintain 30’ typical center-on-center
spacing to easily mow between trees.

July 12, 2023 8


Proposed Wildflower Aesthetic
 TxDOT Standard erosion control seed mix placed first. wildflowers seed after.

 Wildflowers are to be seeded within the interior R.O.W

 Low disturbance of wildflowers helps encourage plant biodiversity and sustainability.

 Proposed separate mowing schedules.


 Once a year for wildflower zone (Maintained by City)
 3 times a year for the clear zone (Maintained by TxDOT)

WILDFLOWER ZONE
CLEAR ZONE
Cross Creek Ranch in Katy, Tx

July 12, 2023 9


Proposed Grass Aesthetic
 Future TxDOT Practice that is in
development

 Opportunity to incorporate native


species

 Low growing native species that


need minimal mowing

Native species seeded in test facility in Stevensville, Tx

Potential Native Species for Bryan District Grass Seeding


Clay Soil Species % Mix Lb. PLS/acre Sandy Soil Species % Mix Lb. PLS/acre

July 12, 2023 10


Interchange Applications

July 12, 2023 11


Bryan SH 6
Interchanges

July 12, 2023 12


Proposed Location: SH 21 Interchange

July 12, 2023 13


Proposed Location: MLK Interchange

July 12, 2023 14


Proposed Location: Boonville Interchange

July 12, 2023 15


Proposed Location: Briarcrest Interchange

July 12, 2023 16


College Station SH 6
Interchanges

July 12, 2023 17


Proposed Location: University Interchange

July 12, 2023 18


Proposed Location: SH 30 Interchange

July 12, 2023 19


Proposed Location: Southwest Parkway Interchange

July 12, 2023 20


Proposed Location: Emerald Parkway Interchange

July 12, 2023 21


Proposed Location: Texas Avenue Interchange

July 12, 2023 22


Proposed Location: Barron Interchange

July 12, 2023 23


July 12, 2023 24
Proposed Landscape Summary of Work

Maintenance
Installation Installation Cost Cost Maintenance AFA w/ City LMA w/ City
Area Aesthetic Treatment Performed by paid by paid by Frequency Required? Required?
TxDOT's
11 Intersection Plantings City City 1 effort/quarter Yes Yes
Contractor

TxDOT's
22 TxDOT Standard Grass (Edges) TxDOT TxDOT 3 mow/year No No
Contractor

3a TxDOT's
3a Trees, TxDOT Standard Grass, & Wildflowers TxDOT City 1 mow/year No Yes
Contractor

3b Trees, TxDOT Standard Grass, & Wildflowers TxDOT's


3b TxDOT TxDOT 1 mow/year No No
(with Fewer Trees) Contractor

3c
3C Trees & TxDOT Standard Grass *
Installed by City * * 3 mow/year Yes Yes

TxDOT's
44 Native Grass TxDOT TxDOT 1 mow/year No No
Contractor

*only applies to trees, TxDOT to pay


2 and maintain grass
1
3c

3b 4
3a

September 5, 2023 6
pg. 25
AREA 1

AREA 2 AREA 3

AREA 4 AREA 5

AREA 7
AREA 6

AREA 8
AREA 9

FM 60 / University Dr. pg. 26


AREA 1 AREA 2

AREA 3 AREA 4

Emerald Pkwy pg. 27


AREA 1 AREA 2

pg. 25
AREA 3 AREA 4

Rock Prairie Rd. pg. 28


AREA 1

AREA 2 AREA 3

Barron Rd. pg. 29