DOCUMENT No. 7. 18, 19, 20. INSTRUCTIONS TO BIDDERS ——_gg2-80-42-TR-6511 Rev. A Pago 4 of 8 v) Transportation of equipment tags 87-C-101 / 87-B-103 shall be in single piece & 87-C-102 in two sections (refer respective MDS) to Haldia Refinery. vi) Transportation of equipment tags 081-C-002 shalll be in two sections (refer respective MDS) to Bongaigaon Refinery. Transportation of equipment tags 307-C-101(N) / 307-V-102(N) shall be in single piece to Mathura Refinery. vill) All equipment shall be dispatched with all internals (as supplied by column fabricator) in installed condition. Fabricator to note that quoted price shall include following weights for Piping clips and Structural Clips. Any increase / decrease in weight shall be settled as per Unit rates for addition / deletion. ITEM NO. SA 516 GR-60 Is-2062 GR. E250 B 303-C-11T 2500 800 303-C-302 2000 700 303-C-401 2500 (800 ‘87-0-102 7000 300 (087-C-002 1000 300) ‘B6A-C-102, 800 700 Erection weight given in equipment data sheet is approximate. Vendor shall calculate the actual equipment weight and furnish calculation, Erection weight furnished in vendor drawing shall be based on fabricator's calculation. Calculation of Centre of Gravity (C.G.) of the equipment shall also be done by vendor and marked on the equipment &in the fabrication GA drawing. When spot radiography is specified the extent of radiography defined in Clause 5.4.2 of EIL specification 6-12-0001 Rev. 5 shall be replaced as follows: Each category A or B pressure containing weld shall be spot radiographed in accordance with ASME Section-Vill Division-I, paragraph UW-52 as a minimum requirement. Each Spot radiograph shall be a minimum of six inches (150mm) in length and minimum one spot shall be selected in each circumferential & longitudinal seam. Additionally at least one T-joint in each circumferential seam shall also be selected. Welds from each welding procedure, weldediwelding operator shall be examined For CS / LAS Equipment: All production welding shall be examined by RT. In case vendor want to perform UT by TOFD technique in lieu of RT the same is acceptable subject to the following a) Thickness of plate is greater than 38mm. b) With Code Case 2235, Automated UT incorporating TOFD and pulse echo probes or TOFD and Phased Array mounted on the same chassis that automatically traverses along the joints to be inspected and displaying both results simultaneously on a single screen may be considered in lieu of RT. ©) Calibration block of similar materialthickness shall be used. Calibration block shall have suitable notches to simulate longitudinal as well as transverse cracks on Format No, El. 1647-1924 Rev. + Copyright EI. — Alright ese oa

You might also like