outside and inside surface. Setup should be capable of detecting defects on outside
as well as inside while scanning from one surface only
4) The system that is proposed to be deployed in lieu of radiography shall be submitted
along with the track record prior to use for ElL review. The vendor shall demonstrate
successfully the capability of AUT machine and the defects evaluation in the same
screen during the site visit of EIL inspector/EIL representative.
For marine transportation, the following shall be taken care / provided by vendor:
After completion of all testing and inspection, the inside of complete equipment shall be
thoroughly drained and dried out. Equipment shall be completely dried by passing air for
sufficient time until no further increase in relative humidity of outgoing air is observed,
After drying, the equipment shall be purged and filled with dry Nz at 0.25 kg/cm?. The
equipment shall be provided with pressure gauge to monitor Nz pressure and %" non-
return valve, Vendor to provide all accessories to ensure that Nz pressure is maintained
Up to equipmentdelivery at site. All threaded holes other than tell-tale holes for testing
shall be suitably protected with steel bar plugs. All nozzles not provided with blind flange
shall be provided with steel covers, temporary gaskets and bolts. All external surfaces
shall be properly protected / covered against sea environments.
Refer to EIL Specification for pressure vessels # 6-12-0001
Following new clause shall be considered after existing clause 3.5:
"3.6 Intemals
3.6.1 For support beams, allowable deflection shall be limited to L/325 where L is the
length of the beam.
3.6.2 For plates, allowable deflection shall be limited to T/2 where T Is the corroded
thickness of plate.
3.6.3 Allowable stress at design temperature shall be as per applicable Code.
Following new clauses shall be considered at the end of existing clause 4.5 for Internals
and externals:
"4.5.8 Internal perforated plate inside the vessel shall be removable type unless
specified otherwise and should be able to pass through nearest manhole.
45.9. Unless specified otherwise, Full support rings shall be provided below catalyst
bed to support same.”
{C) General instructions
1
Stage-wise & final inspection of the equipment including all components and internals
shall be carried out by third party inspection agency. Quoted price shall include for the
same.
For approved third party inspection agencies (TPIA), refer commercial documents.
Fabrication shall not commence before their approval except as noted at SI.No. 2 & 3.
Raw material procurement may proceed prior to approval of vendor drawings on the
basis of Purchase Requisition. However for plates& nozzles where there is no Hold in