Syed Brothers Consultation & Construction

Power
IT/Telecom
Date Centre
Architecture & Design
QUALITY POLICY
“We repeatedly do Excellence, therefore, is not an act but a habit”

The aim of SBCC is total customer’s satisfaction, leading up to customer’s delight by


providing highest products and services. SBCC strives to become a leader in IT, Power,
construction industry and aim to achieve this goal through dedication, loyalty and
commitment. SBCC is committed to comply with the requirements and continually
improve the effectiveness of quality management system.
CEO STATEMENT

The current development in Information Technology is challenging for our


industries, however with SBCC we are rich in employee talent and passion. This talent and
passion, combined with our corporate culture of excellence, make SBCC a dynamic,
growing & legacy company that continues to thrive in the most challenging conditions.

Our company started in April 1992 as the Pakistan’s specialized services of


construction IT and Power. Since introduction in 1997, we started providing services for
data center from installation to testing with networking capabilities.
Contents

1. About Us

2. Certifications & Affiliations

3. Organizational Set-Up

4. Major Work Division & Responsibilities

5. Services Offered

6. Clients List & Major Projects

7 Certificates

8 Projects Gallery
ABOUT US

Syed Brothers Consultation & Construction Company (SBCC) is a dynamic growing organization
that has brought safety, quality and productivity involved mainly in developing solutions for IT, Power,
HVAC, Renovation and Construction industry. SBCC is also involved in provisioning and distribution of
equipment related to IT, Power & HVAC systems. SBCC provides expert services for data center as well.

SBCC was founded by Mr. Muhammad Iqbal Shah, the CEO, in 1992 on a small scale. At that time,
Mr Iqbal entered into the construction industry as a residential builder. In 1997, a company named “Iqbal
& Co.” was established. During the year 2000, experiencing significant growth in the business, SBCC
was established where in the focus of the firm was shifted to the works related to IT, Power and
interior/exterior of residential and commercial buildings together with backup and maintenance. Since
then, the firm SBCC has completed many challenging projects.

Along with the globalization trends, the aim of SBCC is to satisfy the customers by flexible ways of
thinking, speedy response and great accuracy. Most importantly, SBCC always encourage the clients to
interact with the team members to keep everyone focused on the perfect ending. Customer satisfaction is
proven by SBCC's statistics.

Many times over the past years, SBCC has instituted significant changes in its setup, work
methodologies and management practices. SBCC has the advantage of having ISO 9001 Quality
Management Certification. SBCC believes in quality and timely deliver while satisfying customers SBCC
continually challenges itself with measureable objectives to support the quality commitment and validate
efforts.
2. Certifications and Affiliations

Certifications

 NTN Certification: No. 2133474 - 9

 GST: No. 26-00-9999-038-46

 ISO 9001 - 2008 Certification: 04 -A- 08 - QMS 0161

 Pakistan Engineering Council: License Number 31676


Affiliations

SBCC has entered into formal arrangements/ agreements with specialist firms and professional individuals
in the consultation & construction industry. This is mainly in areas where SBCC feels it needs to
reinforce to ensure that it is able to provide a top-class service to its clients.

Such arrangements are with:

ALLIED ENGINEERING & SERVICES (PVT) LTD.:Sole authorized dealer for caterpillars Generators in Pakistan

APC & SCEHNIDER Electric: World’s Leading power equipment manufacturers

PEL : Major electrical equipment manufacturer & supplier

PAKISTAN CABLES: Pakistan’s leading Cable Manufacturers

FAST CABLES: High quality cable manufacturers .

MIA Corporation: Pakistan’s leading air conditioner manufacturers

ENERSYS: World’s Largest Batteries Manufectures

EMERSON: world leaders in precision cooling , UPS, networking infrastructure & monitoring

CUMINS PAKISTAN: International name in Power equipment

NASIR'S DESIGN: Architectural & Interior Design firm

GRAFFITEC: Structural engineering & Architectural firm

ARTISANS: Architectural and interior design firm

MALIK & MALIK ASSOCIATES: Architectural and interior design firm

QAZI ASSOCIATES: A major electrical engineering consulting firm

PACE COMMUNICATIONS: An IT and communications firm


3. The Organizational Set-Up
i. From a small labor force, usually hired, SBCC currently (mid-2009) has significant permanent skilled
staffing / specialists in a number of key construction trades. These cover (i) IT, Power, Renovation, LT, HT,
AMF Panel, DG sets Transformers etc. (ii) Civil Works, (iii) Electrical Works, (iv) Plumbing and (v)
Carpentry. Additionally, it has on its permanent force a number of semi-skilled labor and helpers. For large
jobs, SBCC hires skilled or semi-skilled labor usually, labor who have previously worked for SBCC - as and
when required, and sub-contracts some jobs, mainly to ensure timely completion of projects.

ii. SBCC believes in running the business as a family operation and with an emphasis on team work. In this
regard, SBCC feels pleasure to state that it provides regular accommodation to its labor force and
additionally all meals when they are on a job.

iii. SBCC has now on its management staff a number of highly regarded professionals:

 Director, Finance / Admin: a senior professional with extensive experience in finance and
administration.

 Director, Technical & Sales: a senior professional, (MS / M.Phil) in electrical engineering,
working experience of many electrical and IT related projects.

 Director, Business Development: a senior professional with vast experience in business


development and management in the construction industry.

 Director, Human Resource Management: a senior professional, (MS / M.Phil) in Human


Resource Management.

 Director, Project Management & Administration: a senior professional with 35 years experience
of Project Management and Administration with National / International organizations.

 Director, Information Technology Management: a highly qualified (MS / M.Phil) with practical
experience in Information Technology Management.

 Chief Operating Officer: A Senior Telecommunication professional with more than 35 years
experience in Pakistan Air Force (PAF) and Pakistan Telecommunication Company Limited
(PTCL) in the field of Telecommunication, Procurement and Supply chain Management, Project
Management, Quality & Training and HR/Admin facilities.

iv SBCC, through associate relationship, is also geared up to provide architectural and design services
through renowned architectural / engineering firms; SBCC has had substantial experience, involving these
firms in various tasks and assignments, specially in turn-key projects.

v. Over the years, the management has added significant value to its business and management capacity.
SBCC now can provide a complete service, a turn-key project to its clients starting from the initial layout
plan, to the design, supply, installation, testing and commissioning and keep operational, as well as
complete construction supervision. Some of these services are rendered through SBCC's affiliation with
other professional firms, such as Architectural Engineering firms, etc. However, SBCC takes full
responsibility for all such services.

vi. SBCC is professionally managed and ensures that:

 Job profiles and time schedules are well maintained thus saving efforts, material and capital input,
by avoiding cost over-runs

 Clients receive satisfaction and top value for their investment and capital
4. Services Offered
I SBCC offers highly satisfactory IT, Power, Renovation and construction-related services, together with
required back-up and maintenance in the following areas:

 IT, facilities planning, installation, testing, commissioning and auditing including


Server rooms and Data centers in compliance with standardized approach

 Electrical equipment complete supply, installation, testing, commissioning, and


Supervision to keep the equipment operational
 LT, HT, AMF Panel DG sets Transformers etc.
 Telecommunication EPABX / others
 Civil works complete, covering excavations, masonry, paint, etc.
 Air-conditioning works HVAC
 Security & Access Control systems
 FSS / Fire Alarm systems
 False ceiling works, Raised floors
 Erection and installation of office partitions wooden and masonry
 Wood work, carpentry and Plumbing
 Glass and metal works
 Upholstery of furniture, and other furnishings
 Manufacture / installation of fixed / moveable furniture items

ii. Offices: Head Office: Syed Plaza, Murree Road, Bhara Kahu, Islamabad.
Lahore Office: House # 377, B-Block, Johar Town Lahore.
Karachi Office: Suit # 701, 7th Flour West Land Trade Center Shaheed-e-Millat Road
Karachi.

iii. Machinery and Tools: SBCC has its own, a large workshop, stores and service area and the required
machinery and tools for carpentry, steel and glass works, etc., to meet its on-going projects requirement.
SBCC STAFF LIST
"ADMINISTRATION"
Chief Executive Mr. Muhammad lqbal Shah Chief Executive

Management Ms. Tahira lqbal Managing Director (ISO Certified) (PMP)

Management Ms. Sarwat Habib General Manager (PMP)

Management Ms. Samina Munir Assistant General Manager

Management Ms. Naila Sagheer Office Assistant

Management Ms. Reshma Shehzadi Receptionist

"ENGINEERING & TECHNICAL"


MECHANICAL DEPARTMENT

Mechanical (HVAC+DGs) Mr. Muhammad Yousaf Technical Manager

Mechanical Mr. Arslan Ahmed Mechanical Engineer

Mechanical Mr. Altaf Ahmed Associate Engineer (Mechanical)

ELECTRICAL DEPARTMENT

Electrical Mr. Taimur Arshad Siddiq Senior Manager Technical

Electrical Mr. Zahir Mehmood Business Development Manager (CDCP)

Electrical Mr. Syed Anas Iqbal Electrical Engineer

Electrical Mr. Ismail Ahmed Electrical Engineer

Electrical Mr. Usman Kashif Electrical Engineer

Electrical Mr. Hamza Ali Safdar Electrical Engineer

Electrical Mr. Muhammad Junaid Electrical Engineer

Electrical Mr. Waqas Javed Associate Engineer (Electrical)

Electrical Mr. Shakeel Ahmed Minhas Associate Engineer (Electrical)

Electrical Mr. Shahbaz Abbasi Associate Engineer (Electronics)

Electrical Mr. Muhammad Adnan Associate Engineer (Electrical)

Electrical Mr. Muhammad Zeeshan Associate Engineer (Electrical)


Electrical Mr. Hammad Ahmed Satti Associate Engineer (Electrical)

Electrical Mr. Mohammad Farooq Associate Engineer (Electrical)

Electrical Mr. Mohammad Hamid Mehmood Draftsman

Elect. Power Works Mr. Muhammad Aslam Power Supervisor

Elect. Power Works Mr. Nadir Khan Site Supervisor

Elect. Power Works Mr. Kabir Hussain Technician

Elect. Power Works Mr. Naseer Hussain Technician

Elect. Power Works Mr. Naveed Ahmed Electrician

COOLING(HVAC) DEPARTMENT

Mechanical (HVAC) Mr. Muhammad Farrukh Field Supervisor

IT/NETWORK DEPARTMENT

IT Ms. Sumbal Iqbal Software Engineer

ENVIRONMENT, HEALTH & SAFETY DEPARTMENT

EHS Mr. Muhammad Awais Safety Engineer

"FINANCE"
Finance Mr. Habib ur Rehman Senior Manager Finanace

Finance Mr. Adeel Ahmed Assistant Manager Finance

Finance Ms. Zarmina Arshad Assistant Manager Finance

"FIELD WORKERS"
Wood Works Mr. Muhammad Akram Supervisor

Masonry/Paint/Plumbin Mr. Muhammad Ilyas Supervisor

Ceiling/Raised Flooring Mr. Muhammad Tabaruk Supervisor


6. Clients List & Major Projects
A list of some of the major clients and the value of projects is provided below.

DATA CENTER PROJECTS


Sr. No Job Content Client Status
Operation & Maintenance Support of Satellite Town Exchange,
1 PTCL Ongoing
Rawalpindi

Operation & Maintenance of CDDT/H-9 Data Center External Power Ongoing since
2 PTCL
Equipment 8 years

Supply, Installation, Testing and Commissioning of IT Data Center and


3 PTCL Completed
Power equipment on Turnkey Basis
Supply, Installation, Testing and Commissioning of IT Data Center at
4 PTCL Completed
CDDT Building H-9 Islamabad on Turnkey Basis

5 Ufone Data Center Satellite Town Rawalpindi PTCL Completed

6 Extra Work Data Center H-9 PTCL Completed

7 OTT Data Center H9 PTCL Completed

POWER PROJECTS
Sr. No Job Content Client Status
Operation & Maintenance Support of Satellite Town Exchange,
1 Rawalpindi – Part A DG, Transformers, ATS, Panel Boards, PFI PTCL Ongoing
Panels, Earthing

Operation & Maintenance of CDDT H-9 Data Center External Power


Ongoing since
2 Equipment PTCL
8 Years
– Part A DG, Transformers, ATS, Panel Boards, PFI Panels, Earthing

Supply, Installation, Testing & Commissioning of Rectifier System on


3 PTCL Ongoing
Turnkey Basis
Supply and Installation of 2KVA UPS for Intranet & Mediation Sites-
4 PTCL Ongoing
Phase2 in all over Pakistan at Remote Sites
Supply and Installation of 20 KVA UPS for PTCL Contact Center,
5 PTCL Completed
Lahore and Rawalpindi - Phase 2

Supply, Installation, Testing & Commissioning of Manual Over Ride


6 (MOR) System on Turnkey Basis PTCL Completed
MOR, LV Panel, CTs, VTs, 500mm2 Installation & Termination
Supply Installation Testing & Commissioning of Optimized 1+1 Power
Arrangement at PTCL Complex Satellite Town Rawalpindi on Turnkey
7 PTCL Completed
Basis – Part A DG Sets, Transformers, HT/LT & PFI Panels, ATS,
Earthing, Cabling
Supply Installation Testing Commissioning of IT Data Center at CDDT
8 Building H-9 Islamabad on Turnkey Basis – Part A PTCL Completed
Electrical Works, LV Panels, Power Cabling, PDUs
Renovation of civil works for BRAS sites on Turnkey Basis – Part A
9 PTCL Completed
Power Requirements, Power Cabling & Eletrical Works

Supply, Installation, Testing & Commissioning of 3x500 KVA DG Sets


10 at AAE-1 Cable Station Misri Shah Karachi on Turnkey Basis – Part A PTCL Completed
DG Sets, Transformers, HT/LT & PFI Panels, ATS, Earthing, Cabling

Supply, Installation, Testing & Commissioning of ATS Panels and


11 Smart Switches on Turnkey Basis PTCL Completed
ATS Panels, Smart Switches

Power Requirement for Establishment, S.I.T& C of IT Data Center


12 DG, Transformer, HT Panel, ATS, MOR, HT/LT Power Cabling & PTCL Completed
Termination

13 Supply & Installation of TVSS & LBS PTCL Completed

Ufone Data Center Satellite Town Rawalpindi – Part A Power


14 PTCL Completed
Requirements, Earthing
Renovation /Building Modification for Cafeteria at HQs PTCL Islamabad
15 PTCL Completed
– Part A Electrical Works
Extra Work Data Center H-9 – Part A
16 PTCL Completed
AMF Panel, UPS DB, Power Cabling, Electrical Works
Supply & Installation Testing, Commissioning of IT Data Center Extra
17 PTCL Completed
Work
Rehabilitation and Restoration of 5th Floor E-Block PTCL Head Quarter
18 PTCL Completed
Islamabad on Turnkey Basis – Part A
Renovation and Establishment of Service Desk in Lahore on Turnkey
19 Basis (SD Hall) – Part A Electrical Works, Power Cabling & Circuit PTCL Completed
Breakers
IPTV Site Preparation, Multan – Part A Earthing, LED Lighting, Cable
20 PTCL Completed
Ladder
Renovation of Hostel-C at PTCL Staff College Haripur – Part A
21 PTCL Completed
Electrical Works

22 Hawksbay Out Site Work – Part A Electrical Works PTCL Completed

Renovation Work in Misri Shah Karachi – Part A Power Cabling and


23 PTCL Completed
Electrical Works
Renovation of CTH MMBB & PIE Hall (CTH Lahore) – Part A Electrical
24 PTCL Completed
Works
Renovation Work in Pak Capital Exchange Karachi – Part A Electrical
25 PTCL Completed
Works
Renovation and Civil Works for Establishment Service Desk at NOC SD
26 PTCL Completed
Hall on Turnkey Basis – Part A Electrical Works

27 Misri Shah MSAN GRD Colocation, Karachi – Part A Electrical Works PTCL Completed

Renovation Work In Misri Shah 2nd Building Karachi – Part A Power


28 PTCL Completed
Cabling & Termination, AC/DB Installation

29 Misri Shah Renovation Work – Part A Electrical Works, LED Lighting PTCL Completed

30 Misri Shah Third Phase – Part A Electrical Works PTCL Completed

AAE-1 Cable Station Misri shah Karachi – Part A Electrical Works,


31 PTCL Completed
AC/DC Circuit Breakers Installation
IPTV NOC Civil work site Preparation Furniture and FSS work – Part A
32 PTCL Completed
Electrical Works

33 Civil Works for MSAG at I-8/3 – Part A Electrical Works PTCL Completed

Electrical Work-F5 Exchange Islamabad – Part A Electrical Works,


34 PTCL Completed
Lighting & Power Installation
Renovation of Rest House at Mallach Earth Station Islamabad with
35 Allied Works PTCL Completed
– Part A Electrical Works

36 IT equipment facility, Electrical Works PTCL Completed

First Floor Electric work


37 PTCL Completed
Power Cabling, Distribution Boards, MCBs Installation
Establishment of Service Zonal Desk at Karachi on Turnkey Basis –
38 PTCL Completed
Part A Electrical Works

39 Supply of Smart Switch for DG Sets PTCL Completed

40 Isolation of batteries IBA-II PTCL – Part A MCCBs PTCL Completed

41 Renovation Work in Satellite Town Exchange – Part A Electrical Works PTCL Completed

OTT Data Center H-9 Islamabad – Part A


42 PTCL Completed
Power Cabling & Termination, DB Installation, Breakers Installation

Renovation of conference room C-Block 5th floor, PTCL Headquarters,


43 PTCL Completed
Islamabad – Part A Electrical Works

44 Power Work H9 Islamabad PTCL Completed


45 SOC Second Floor H-9 Islamabad – Part A Electrical Works PTCL Completed

46 SBS Switch (SBCC own Product) PTCL Completed

COOLING (HVAC) PROJECTS


Sr. No Job Content Client Status
Supply, Installation, Testing, and Commissioning of Industrial Air
1 Conditioning Units on Supply and Service Basis in Central, North, PTCL Ongoing
South Zones of Pakistan
Supply, Installation, Testing, and Commissioning of Precision Air
2 PTCL Ongoing
Conditioning Units on Turnkey Basis
Supply Installation Testing Commissioning of IT Data Center at CDDT
3 Building H-9 Islamabad on Turnkey Basis – Part B Precision Air PTCL Completed
Conditioning System
Renovation of civil works for BRAS sites on Turnkey Basis – Part B
4 PTCL Completed
Precision Type Air Conditioners
NOC PTCL – Part B
5 PTCL Completed
Air Conditioning System

Supply, Installation, Testing & Commissioning of Air Conditioning Units


6 PTCL Completed
for Central & South Zones on Turnkey Basis

Establishment of IP Center of Excellence at CDDT Building H-9 on


7 PTCL Completed
Turnkey Basis – Part B Precision Air Conditioners
Supply Installation Testing & Commissioning Of Precision Type ACs
8 PTCL Completed
Unit on Turnkey Basis
Supply Installation Testing, and Commissioning of ACs for
SMW4/IMEWE Cable Station Hawks Bay & International Transmission
9 PTCL Completed
Nodes Karachi
on Turnkey Basis
Operation & Maintenance of CDDT Data Center External Power
10 PTCL Completed
Equipment – Part B Air Conditioners
Ufone Data Center Satellite Town Rawalpindi – Part B AC's 4 Ton Floor
11 PTCL Completed
Standing
Renovation /Building Modification for Cafeteria at HQs PTCL Islamabad
12 PTCL Completed
– Part B AC's 2 Tons Cabinet Type
Supply & Installation Testing, Commissioning of H-9 IT Data Center
13 Extra Work PTCL Completed
– Part B Air Conditioning System
Rehabilitation and Restoration of 5th Floor E-Block PTCL Head Quarter
14 PTCL Completed
Islamabad on Turnkey Basis – Part B

Supply, Installation, Testing & Commissioning of Air Conditioning and


15 PTCL Completed
Power System at IMEW-SMW Hawksbay Karachi on Turnkey Basis
Supply Installation Testing & Commissioning of Precision Type ACs
16 PTCL Completed
Units on Turnkey Basis
Supply Installation Testing & Commissioning of Acs (Misri Shah,
17 Hawksbay, Marston Road & Pak Capital International Nodes) on PTCL Completed
Turnkey Basis
Renovation & Establishment of Service Zonal Desk in Lahore on
18 Turnkey Basis (SD Hall) – Part B Cassette Type Air Conditioners with PTCL Completed
Auto Reversible System
Supply, Installation, Testing & Commissioning of Precision Air
19 Conditioning unit in Establishment of IP Center of Excellence at CDDT PTCL Completed
Building H-9 Islamabad
Isolation of batteries IBA-II PTCL – Part B Conventional Air
20 PTCL Completed
Conditioning System

21 Supply of Air Conditioning unit PTCL Completed

22 Cooling Project of MMBB PTCL Completed

Supply, Installation, Testing & Commissioning of 4 ton Air Conditioning


23 PTCL Completed
unit.
FIRE ALARM & FIRE FIGHTING PROJECTS
Sr. No Job Content Client Status

Supply Installation Testing & Commissioning of Addressable fire


1 PTCL Ongoing
detection system in PTCL Head Quarters of Turnkey Basis

Supply Installation Testing Commissioning of IT Data Center at CDDT


2 Building H-9 Islamabad on Turnkey Basis – Part C PTCL Completed
Fire Detection (VESDA) & Suppression (FM200) System
Renovation of civil works for BRAS sites on Turnkey Basis – Part C
3 PTCL Completed
Auto Fire Suppression System, Fire Alarm System
Supply, Installation, Testing & Commissioning of 3x500 KVA DG Sets
4 at AAE-1 Cable Station Misri Shah Karachi on Turnkey Basis – Part C PTCL Completed
Fire Alarm System
NOC PTCL – Part C
5 PTCL Completed
Fire Alarm System
Establishment of IP Center of Excellence at CDDT Building H-9 on
6 Turnkey Basis – Part C Auto Fire Suppression System, Fire Alarm PTCL Completed
System
Ufone Data Center Satellite Town Rawalpindi – Part C Auto Fire
7 PTCL Completed
Suppression System, Fire Alarm System
Establishment of IP Center of Excellence at CDDT Building H-9/OTT
8 Data Center, on Turnkey Basis – Part C PTCL Completed
Auto Fire Protection System & Fire Alarm System
Isolation of batteries IBA-II PTCL – Part C Fire Alarm Control Panel &
9 PTCL Completed
Smoke Detectors
CIVIL AND IT FACILITIES RENOVATION PROJECTS
Sr. No Job Content Client Status

Operation & Maintenance of CDDT Data Center External Power Ongoing since
1 PTCL
Equipment – Part D NOC Infrastructure, SOC Infrastructure 8 Years

Supply Installation Testing Commissioning of IT Data Center at CDDT


2 Building H-9 Islamabad on Turnkey Basis – Part D CCTV, Access PTCL Completed
Control System, Environmental Monitoring, Raised Floor & Renovation

Renovation of civil works for BRAS sites on Turnkey Basis – Part D


3 PTCL Completed
Data & Voice Networking, Raised Flooring & Ceiling, Furniture

Supply, Installation, Testing & Commissioning of 3x500 KVA DG Sets


4 at AAE-1 Cable Station Misri Shah Karachi on Turnkey Basis – Part D PTCL Completed
Civil Works

5 Civil Works in PTCL HQ Islamabad PTCL Completed

NOC PTCL – Part D


6 PTCL Completed
Data & Voice Networking, Video Walls, Renovation
Design (by Artisans), Office Interiors, HVAC, Fire Alarm System,
7 PTCL Completed
Networking and Furniture
Construction of boundary wall at Pind Parian Wireless Station Tarnol,
Islamabad
8 PTCL Completed
Excavation, Foundation, Wall Columns, Steel Works, Weather Shield
Paint
Establishment of IP Center of Excellence at CDDT Building H-9 on
9 Turnkey Basis – Part D Data & Voice Networking, Civil Works, Raised PTCL Completed
Flooring, Fire Proof Ceiling

10 All works, Commercial Plaza Islamabad Completed

Office Interiors, Networking and Furniture (Network Operating Center Huawei


11 Completed
For PTCL) Technologies

Ufone Data Center Satellite Town Rawalpindi – Part D CCTV, Civil


12 PTCL Completed
Works, Gypsum Ceiling Flooring, Renovation

Renovation /Building Modification for Cafeteria at HQs PTCL Islamabad


13 PTCL Completed
– Part D Porcelain Tiles, False Ceiling, Water Proofing, Furniture

14 Renovation of PTCL One Stop Shop Cantt Exchange PTCL Completed


15 Extra Work Data Center H-9 – Part D Data Racks, Renovation PTCL Completed

Rehabilitation and Restoration of 5th Floor E-Block PTCL Head Quarter


16 Islamabad on Turnkey Basis – Part D PTCL Completed
Data Networking, Civil Works, Painting, Aluminium Windows

Renovation and Establishment of Service Desk in Lahore on Turnkey


17 PTCL Completed
Basis (SD Hall) – Part D Data Networking, Furniture & Fixtures

Establishment of IP Center of Excellence at CDDT Building H-9 on


18 PTCL Completed
Turnkey Basis
SOC (Security Operation Center) H-9 Islamabad.
19 PTCL Completed
Data & Voice Networking, CCTV Cameras, Renovation
Operation & Maintenance Support of IT Data Center H9, Islamabad –
20 PTCL Completed
Part D NOC Infrastructure, SOC Infrastructure
IPTV Site Preparation, Multan – Part D
21 PTCL Completed
96-port ODF Racks, Gypsum Ceiling, Tiles, Glass Partitioning

22 All works - House Def. II Rwp Completed

Manufacturing of Furniture & Fixture at ICT PTCL academy H-9/4


23 PTCL Completed
Islamabad
Provision & Laying of Master Tiles of 2"x2" size at PTCL Headquarter,G-
24 PTCL Completed
8/4 Islamabad on Turnkey Basis

25 Renovation of Hostel-C at PTCL Staff College Haripur PTCL Completed

26 Renovation - House Islamabad Completed

Hawksbay Out Site Work – Part D


27 PTCL Completed
RCC Pillars, Ceiling, Tiles, Roof Top Shades, Iron Gates
Renovation Work in Misri Shah Karachi – Part D Glass Partitioning,
28 PTCL Completed
Painting

Renovation of CTH MMBB & PIE Hall (CTH Lahore) – Part D


29 PTCL Completed
Glazed & Unglazed Tiles Installation, Ceiling, 12mm Glass Installation
Renovation Work in Pak Capital Exchange Karachi – Part D
30 Data & Voice Networking, Termite Treatment, Floor, Ceiling, Painting, PTCL Completed
Partitioning
Renovation and Civi Works for Establishment Service Desk at NOC SD
31 Hall on Turnkey Basis – Part D Data & Voice Networking, Civil Works, PTCL Completed
Furniture, Paint
Power Work in PTCL Exchange IBA-I
32 PTCL Completed
Civil Works, Tiles Installation, Glass Partitioning, Painting
Renovation Work In Misri Shah 2nd Building Karachi – Part D
33 Voice & Data Networking, Floor & Roofing, Renovation, Termite PTCL Completed
Treatment
Misri Shah MSAN GRD Colocation, Karachi – Part D
34 PTCL Completed
Block Masonry, Gypsum Ceiling, Industrial Grade Paint, Tiles, Partition

AAE-1 Cable Station Misri shah Karachi – Part D Data Networking,


35 PTCL Completed
Renovation, Civil Works

Misri Shah Third Phase – Part D


36 PTCL Completed
Civil Works, Renovation of Floor, Ceiling, Paint, Glass Partition

Misri Shah Renovation Work – Part D


37 Block Masonry, Gates, Industrial Grade Paint, Gypsum Ceiling, PTCL Completed
Aluminium Windows

38 Renovation - House Islamabad Completed

39 Civil Works at Hawksbay Culverts PTCL Completed

40 IPTV NOC Civil Work Site Preparation Furniture and FSS PTCL Completed

IPTV NOC Civil work site Preparation Furniture and FSS work – Part D
41 PTCL Completed
Data & Voice Networking, Civil Works, Furniture
Civil Works for MSAG at I-8/3 – Part D
42 Reinforced Cement, Brick Masonry, Plumbing, Termite Proofing, Slabs PTCL Completed
& Grills

43 Electrical Work-F5 Exchange Islamabad – Part D Civil Works PTCL Completed

44 Renovation /Civil Work of New Born NOC (Rwp) PTCL Completed

Renovation of Rest House at Mallach Earth Station Islamabad with


Allied Works
45 PTCL Completed
– Part D Civil Works, Floor/Wall Work, Furniture, Windows, Kitchen &
Bathroom

46 IT equipment facility, Electrical Works PTCL Completed

Establishment of Service Zonal Desk at Karachi on Turnkey Basis –


47 Part D Data & Voice Networking, Floor/Wall Panelling, Glass PTCL Completed
partitioning & Doors
Provision and Fixing of ACP (Aluminium Composite Panels) at AAE-1
48 PTCL Completed
Misrishah Karachi
Getronics
49 Telepresence System PTCL Headquarters Islamabad. Completed
(Lahore)

50 Isolation of batteries IBA-II PTCL – Part D Renovation PTCL Completed

51 OTT Data Center H-9 Islamabad – Part D Civil Works PTCL Completed

Renovation Work in Satellite Town Exchange – Part D Civil Works,


52 PTCL Completed
Gypsum Ceiling, Wooden Partitions
Renovation of conference room C-Block 5th floor, PTCL Headquarters,
53 PTCL Completed
Islamabad – Part D Data Networking, Ceiling & Flooring, Roller Blinds

54 NGN Exchanges PTCL Completed

SOC Second Floor H-9 Islamabad – Part D


55 PTCL Completed
Data & Voice Networking, CCTV Cameras, Renovation
COD, GHQ
56 Interiors All works - Commercial Completed
Rwp.
Appreciation On
Power Optimization
Project At PTCL
Registration No. 6110184919475

Date of Registration 28-Jul-2004

Type of Person Individual

Name MUHAMMAD IQBAL SHAH

Address BK PLAZA BHARA KAHU MURREE ROAD

Tax Office RTO ISLAMABAD

Activity Type Business

Date of Print 02-Aug-2019


GALLERY
POWER & IT / TELECOM
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL POWER HOUSE SATELLITE TOWN RAWALPINDI.
PTCL MISRI SHAH, KARACHI
UNIFLAIR PRECESSION COOLING PTCL MISRI SHAH, KARACHI
DATA CENTRE
PTCL DATA CENTRE, H-9, ISLAMABAD
PTCL DATA CENTRE, H-9, ISLAMABAD
PTCL DATA CENTRE, H-9, ISLAMABAD
UFONE DATA CENTRE, SATELLITE TOWN, RAWALPINDI
UFONE DATA CENTRE, SATELLITE TOWN, RAWALPINDI
ARCHITECTURE & DESIGN
PTCL DATA CENTRE, H-9, ISLAMABAD
PTCL DATA CENTRE, H-9, ISLAMABAD
PTCL , H-9, ISLAMABAD
ASAIN DEVELOPMENT BANK, ISLAMABAD
ASAIN DEVELOPMENT BANK, ISLAMABAD
ASAIN DEVELOPMENT BANK, ISLAMABAD
CAFETERIA (PTCL HEAD QUARTER) G-8 ISLAMABAD.
FAYSAL BANK BLUE ARE ISLAMABAD
SYED BROTHERS
Consultation & Construction

Syed Plaza Bhara Kahu


Muree Road, Islamabad
Pakistan.

Tel : +92-51-2303961-62
Fax : +92-51-2303704
Mail : sbcc@sbcc.com.pk
Web : www.sbcc.com.pk