You are on page 1of 1

FACTORY Verification Requirements

1. Manufacturer & Supplier Documents ( Check and Attach Documents for Evidence)
a. Manufacturer's Documents
Name

Registration License Chamber of Commerce Certificate Contact Details

Classification Producer Fabricator Assembler

b. Supplier's documents (If Available)


Name Appointment letter

Registration License Chamber of Commerce Certificate Contact Details

2. Product Information (Check and Attach Documents for Evidence )


List of Products Seeking Approval For Product Drawings /Pictures /Catalogue /Technical Previous Project Approval Details
Data sheet (U.A.E & International )

Warranty Certificate ( If Applicable ) Installation & Troubleshooting Guide (If Applicable) Design Calculations( If Applicable )

Independent Product Performance Reports Main Individual Elements of Product (If Assembly) Other ……………….
( If Applicable )

3. Production Machinery & Lab Equipment (Check and Attach Documents for Evidence )
List of Machinery List of In-house Testing Equipment ( If Applicable ) Competence of Technical Staff

4. Quality Documents of Manufacturer (Check and Attach Documents for Evidence )


QA/QC Documents Inspection &Test Plan including Test Reports

Is the proposed material according to the Abu Dhabi Emirate Guideline for Infrastructure Services Standards (ISGL), Transport Infrastructure, Chapter5 Yes No

We declare that all the above information and the submitted documents are true & correct.
Authorized Person
Date
Signature & Stamp

AACM Verification Status


Approved Approved With notes Return for modification Reject

Remarks:
 The Consultant/Contractor through project can submit this application.
 Factory Verification Requirements-Guidance Document shall be used to fill this application.

AACM-RI-CF-238
V1.0 28 Sep 2022

You might also like