0% found this document useful (0 votes)
52 views1 page

Ducting Kompresor Specifications and Requirements

This document provides information on ducting for a compressor including: 1. A list of materials needed including concrete, bolts and nuts, exhaust fans, duct supports, duct joints, and 67.3 square meters of ducting. 2. Dimensions and tolerances for machining parts between 0-2000mm. 3. The supplier is located in Karawang, West Java and is PT. Harum Maju Mapan which provides machining, rewinding, fabrication and general construction services.

Uploaded by

puput pratelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Ducting Kompresor Specifications and Requirements

This document provides information on ducting for a compressor including: 1. A list of materials needed including concrete, bolts and nuts, exhaust fans, duct supports, duct joints, and 67.3 square meters of ducting. 2. Dimensions and tolerances for machining parts between 0-2000mm. 3. The supplier is located in Karawang, West Java and is PT. Harum Maju Mapan which provides machining, rewinding, fabrication and general construction services.

Uploaded by

puput pratelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

DUCTING KOMPRESOR

REV NO REVISION RECORD ECI/ECR NO DATE REVISER

3.
2.
SELATAN BARAT

TIMUR
L 1.
M
P

BETON

ELECTRICAL 1 LOT

BOLT AND NUT 1 LOT

EX FAN ³/H-10000m³/H 2 unit

AS DRAT DUDUKAN 18 PCS

DUDUKAN 9 PCS

JOIN DUCTING 32 BTG

DUCTING 67.3 m²

ITEM QTY
MATERIAL QTY

REQUIREMENT N1-N3 N4-N6 N7-N9 N10-N11 GALVANIZE T2 2 UNIT - PT. HARUM MAJU MAPAN
Lapping Grinding Turn,Mill Scrap,Sand
M Machining, Rewinding, Fabrication & General Construction

Dimens on To erances Part Name : JL RAYA GINTUNG KERTA NO 472, RT 26/RW 7 ,


1. NO BURRY DUCTING KOMPRESOR M GINTUNG KERTA
2. IF NO TOLERANCE Over Up To Tol Over Up To Tol M KEC KLARI KAB KARAWANG JAWA BARAT 41371
AT DRAW USE
TABLE THIS 0 5 ±0.05 120 315 ±0.25 Drawing No : HMM-PRN-10E-717-00 Scale N/S
Drawn Checked Approved Date
6 30 ±0.10 315 1000 ±0.40 CUSTOMER
PT. PRALON INDONESIA 05-10-2023
30 120 ±0.15 1000 2000 ±0.60 Ramdhani S Riyadi Dirmantoro