Professional Documents
Culture Documents
Formula
for… Legend
V = velocity of settling
1. Soil Texture(basis of 2 K = constant to correct for the
V =KD
hydrometer method) effect of temperature
D = diameter of soil particle
CF = correction factor
2. Correction Factor OHRb = observed hydrometer
reading of blank solution
(only used if Ts ≠ Tb;
CF=OHRb +0.36 (T s−T b ) Ts = temperature of soil
temperature should suspension
be in °C) Tb = temperature of blank
solution
CHRs = corrected hydrometer
reading of soil suspension
3. Corrected
CF = correction factor
hydrometer reading CHR s=OHR s−CF
OHRs = observed hydrometer
for soil suspension reading of soil suspension