You are on page 1of 2

ESD RECORD OF ZELA / P OF YEAR 2016

PLATFORM : ZELA & P TESTED ON = Sep 05, 2023


NO DECK LOCATION ESD PUSH PULL FUSIBLE LOOP #1 FUSIBLE LOOP #2 FUSIBLE LOOP #3 FUSIBLE LOOP #4 SIGNAL ALL SDV @ ATP % WATER SPRAY

I MAIN DECK Fusible loop # 2


1. Staiway to Helipad - ZELA Tested Ok N/A Tested Ok N/A N/A Good V 400 = Leaking on Sprinkle Line
2. Beside V- 200 - ZELA Tested Ok N/A N/A N/A Good V 300 = Not any Spray
V 200 = Not any Spray
V 500 = Not any spray
3. Beside Crane ZELP Tested Ok N/A N/A N/A N/A Good Total Water Spray = 0 %
4. Beside Mosque / Office ZELP Tested Ok N/A N/A N/A N/A Good Note: used F/P at ZELP running Pressure = 60 Psi
Sprinkle line leaking on elbow above V-400
II CELLAR DECK
1. Beside Booster Pump 620 - ZELA Tested Ok N/A N/A N/A N/A Good
2. Beside TITA Pig Receiver - ZELA Tested Ok N/A N/A N/A N/A Good

3. In front of PCR - ZELP Tested Ok N/A N/A N/A N/A Good


4. Beside Genset #2 - ZELP Tested Ok N/A N/A N/A N/A Good
5. Stairway to main deck - ZELP Tested Ok N/A N/A N/A N/A Good Total Water Spray = 0 %
6. Stairway to office main deck - ZELP Tested Ok N/A N/A N/A N/A Good

III WELL HEAD AREA Fusible Loop # 1


1.Wellhead Area - ZELA N/A Tested Ok N/A N/A N/A Good Well Head area = 75%
Slop tank area = 0%
COTP area = 0%
Total Water Spray = 35 %
IV LANDING BOAT
1. Stairway to Subcellar deck - ZELA Tested Ok N/A N/A N/A N/A Good
2. Walkway to East landing boat - ZELA Tested Ok N/A N/A N/A N/A Good
3. South Landing Boat ZELP Tested Ok N/A N/A N/A N/A Good

V ZELP GCU Fusible Loop # 3


1. GCU Area Tested Ok N/A N/A Tested Ok N/A Good GCU area =
2. ZPC stairway to ZELP Tested Ok N/A N/A N/A N/A Good Total Water Spray = 10 %
3. Landing Boat - ZELP Tested Ok N/A N/A N/A N/A Good Fire Pump Pressure = 60 Psi

VI OTHERS
1. Individual test well Ok
2. Test fusible loop # 1 use fire pump at ZELP at Well head, COTP and Slop tank area
3.Test fusible loop # 2 use fire pump at ZELP at Seperator area ( V-400, V-300, V-200 and V-500 )
3.Test fusible loop # 3 use fire pump at ZELP at GCU area.

VII FINDING :
1. Found Some Sprinkler at Booster Pump area doesn't spray due to Deluge Valve malfucntion. Pressure at Fire Pump discharge 120 psi .
2. Found some leaking on Header Water system at COTP area due to 1" NippleValve broken.
3. Found Some Sprinkler at Production Separator area doesn't spray due to any leak at Sprinkle Line .
4. Suspect any leaking on Tubing 1/4 " of ESD Loop at Wellhead Autocon Panel.
5. Found ABU Mechanisme at Top deck ZELP not working properly.
Note # One Water Sprinkler line at Top of COTP Motor no water come out
# No Water spray out at Booster Pump area
# No Water spray out at Production Header area

VIII ACTION :
1. Instrument Section plan to troubleshoot on Deluge Valve due to can't open.
2. Instrument section completed replace 1" Nipple Valve on Header Water System.
3. Plan to replace Leaking Sprinkle line at V-400 after fabrication by Welder Crew
4. Instrument section plan to trouble shoot to fixed the leaking tubing said.
5. Safety section plan to trouble shoot to fix it.

Inspector
CNOOC Epadascon & Ongko
1. Rudi R Suhendra
2. Robin K Feri A
3. Untung H Madyani
4. Langsar H Ari P
5. Tito Doni B
6. Rusdiyanto S Sugih W
7. Tata S Tohadi
8. Salomo B Didi K
9. Tata Sumanta Solhan
10. Anisal
11. Djumad W
12. Rudi W