6. Enter the project site's plot number and click the submit button to validate it.
7. Project Details Page: Prepare the following mandatory information to fill out the
project details page:
• Project name
• Nature of the project/usage
• Developer details: Name, email address, phone number, and address
• Physical location details: County, sub-county, geographical coordinates
(latitude and longitude)
• If a consulting firm is involved, enter the name of the consulting firm
• Enter the project description, including storeys and type of construction
• Upload a contract agreement form for the supervision contract
• Submit and continue.
8. Design Stage: Have the following information ready to fill out the Design information:
• Architect's Name and Registration number
• Copies of structural engineering drawings
• Copies of architectural drawings
• Copy of the geotechnical report for the site
• Submit and continue.
9. Approval Stage:
• Attach a copy of the approved structural drawings
• Enter the County approval number
• Submit and continue.
10. Development Stage: Prepare the following information to fill out this page:
• NCA approval Number
• Development Commencement date
• Contractor Details: Contractor name, representative's name on-site,
contractor's phone number, and email address
• Provide any other contractor's details
• Enter information about other consultants involved at the bottom of the page.
Note: On this page, the supervision engineer will update monthly site progress
reports and photos. The engineer can use the (+) tab to continuously upload future
reports until the project is completed and then proceed to the project closure stage.