To:

PT Wartsila Indonesia
Gedung Gandaria 8 Lantai 25 Unit
ABEF
Jl. Sultan Iskandar Muda
Kelurahan Kebayoran Lama Utara
Kecamatan Kebayoran Lama
Jakarta Selatan 12240

PURCHASE ORDER (PO)


009.PO/PSG-IP-WID/2023
DATE: 02 NOVEMBER 2023

Reffering to:

1. Master Service Agreement Purchaser Number: 571.PJ/061/IP/2022 and Contractor Number: 002/AAG/SS/WID/XII/2022
dated 20 December 2022, included amendement of the contract.
2. Supplementary Agreement for Spare Parts and Services for Wartsila Engine 18V50DF Located at PLTDG Pesanggaran
Bali, Purchaser Number: 573.PJ/061/IP/2022 and Contractor Number: 004/AAG/SS/WID/XII/2022, date 20 December
2022, and effective date on 1 January 2023

PT PLN Indonesia Power place the order for spare part for Emergency Part Order PLTDG #3 Pesanggaran.

UNIT PRICE TOTAL PRICE


DELIVERY TIME
NO. DESCRIPTION PART NUMBER UNIT QTY (RP) (RP)
CIP - Cengkareng
CIP - Cengkareng CIP - Cengkareng

1 Connecting rod, upper part 111 024 Pcs 2 11/30/2023 458,983,511 917,967,022

2 Bearing bush 111 025 Pcs 4 11/30/2023 27,569,873 110,279,492

3 Cylinder liner 100 100 Pcs 2 11/30/2023 421,606,445 843,212,890

4 O-ring 100 109 Pcs 4 11/30/2023 550,426 2,201,704

5 O-ring 100 111 Pcs 4 11/30/2023 2,880,435 11,521,740

6 Gudgeon pin 113 014 Pcs 5 11/30/2023 91,539,601 457,698,005

7 Piston, compl, 113 025 Pcs 2 11/30/2023 570,257,436 1,140,514,872

8 Piston ring kit 113 013 Pcs 4 11/30/2023 49,533,266 198,133,064

9 Yoke, compl,, outlet valves 143 016 Pcs 4 11/30/2023 15,130,814 60,523,256

10 Yoke 120 025 Pcs 4 11/30/2023 2,614,640 10,458,560

11 Sealing kit for cylinder head 120 070 Pcs 4 11/30/2023 8,186,990 32,747,960

TOTAL (EXCLUDE ANY INDONESIAN TAX) 3,785,258,565


1. The above items are required for Emergency Part Order PLTDG #3 Pesanggaran
2. Under the above condition, the warranty and other Term of Condition is applied in accordace to the Master Services
3. Agreement.
Delivery time mentioned in this Delivery Order is calculated from the date issuing Purchase Order
4. Payment terms Telegraphic Transfer (TT) as follow attachment A
Other contition except above shall follow the contract

PT WARTSILA INDONESIA PT PLN INDONESIA POWER

FERDINAN FITRAWANSYAH ALIANSYAH ABDULLAH


DIREKTUR VICE PRESIDENT
DEMAND PLANNING AND SOURCING
ATTACHMENT A
TERMS OF PAYMENT
1. PARA PIHAK sepakat bahwa dalam pelaksanaan Pekerjaan ini PIHAK PERTAMA tidak memberikan
uang muka kepada PIHAK KEDUA.
2. PT Indonesia Power Bali Power Generation Unit berkewajiban melaksanakan pembayaran atas
pelaksanaan Pekerjaan kepada PIHAK KEDUA sesuai dengan tagihan (invoice) yang diterbitkan PIHAK
KEDUA.
3. Pembayaran dilakukan sebesar 100% seketika setelah seluruh barang diambil oleh PIHAK PERTAMA
menggunakan Telegraphic Transfer.
4. Pembayaran atas Suplai dilaksanakan oleh PT PLN Indonesia Power Bali Power Generation Unit
sebesar 100% dari nilai Perjanjian / Kontrak apabila PIHAK KEDUA telah menyelesaikan seluruh
pekerjaan dengan ketentuan sebagai berikut :
a. Surat permohonan pembayaran dengan mencantumkan nomor rekening bank dan
mencantumkan contact person (nomor telepon / HP dan email address) yang bisa dihubungi bila
ada hal-hal yang perlu diklarifikasikan terkait dengan tagihan.
b. Kuitansi / tagihan / invoice rangkap 3 (tiga) dengan disebutkan nomor rekening Bank sesuai yang
tertera pada Perjanjian
c. Packing List
d. Forwarder Cargo Recipt (FCR)